• Title/Summary/Keyword: IS 프로젝트 성과

Search Result 1,707, Processing Time 0.036 seconds

Development of 3 layer EVM(Earned Value Management) Guideline for XP(eXtreme programming) based on CMMI (CMMI기반의 XP를 위한 3단계 EVM 적용 지침 개발)

  • Jeong, Mi-Seo;Han, Hyuk-Soo
    • Journal of Internet Computing and Services
    • /
    • v.9 no.6
    • /
    • pp.155-163
    • /
    • 2008
  • Project Monitoring and Control is one of the required activities in project management. This activity provides the information about whether a project is making a progress as it is planned. It is usually performed in weekly meetings or milestone meetings where the project manager checks the project's current status based on project measures such as schedule, cost and work performance. One of the popular method for project monitoring and control is EVM(Earned Value Management). The major characteristic of EVM is that it uses only one measure 'cost' for schedule and work performance so that it enables 2 independent graphs to be illustrated in one integrated graph based on cost. For applying EVM to a project, it is essential to break whole work to work packages and to assign value of cost to each work package at the initial stage of the project. Therefore EVM is well matched with the lifecycle which requires whole plan at the beginning of project. However, in XP(eXtreme Programming), whole customer requirements are difficult to define and to make a complete plan at the beginning and are more detailed in each Iteration. Therefore EVM is not comfortable method for XP. Therefore in this research we suggest 3 layer EVM which can be applied in XP, and develop a process guidelines based on CMMI(Capability Maturity Model Integration) PMC(Project Monitoring and Control) process area.

  • PDF

Management of ASP Outsourcing Project Risks using Real Option Approach (실물옵션 접근법을 활용한 ASP 아웃소싱 리스크 관리)

  • Nam, Seung-Hyeon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.7
    • /
    • pp.2396-2405
    • /
    • 2010
  • Information System (IS) Outsourcing is one of the powerful alternatives to guarantee the competitive advantages in the rapidly changing business environment. Most studies on IS outsourcing area have focused on the Critical Success Factors(CSFs) influencing the Success of IS outsourcing or the performance measuring the success of IS outsourcing projects. The CSFs or the performances which measures the success of IS outsourcing project have limitations to explain how to succeed in doing IS outsourcing project. This study uses Real Options Approach to make IS outsourcing projects' success by recognizing and minimizing IS outsourcing risks.

The Effects of R&D Process Maturity on Product Development Performance: Focused on Mediating Effect of R&D Project Performance (R&D 프로세스 성숙도가 제품개발 성과에 미치는 영향: R&D 프로젝트 성과의 매개효과를 중심으로)

  • Shin, Kyung Sic;Oh, Min Jeong;Kim, Won Ki;Park, So Hyun
    • KIPS Transactions on Computer and Communication Systems
    • /
    • v.7 no.7
    • /
    • pp.165-174
    • /
    • 2018
  • The purpose of this study is to verify the effects of R&D process maturity on product development performance and to verify whether R&D project performance mediating effect. The questionnaire was collected and analyzed to 131 persons related to the R&D work in 55 companies and public institutions performing R&D work. The results of this study are as follows, the effect of R&D process maturity on product development performance and mediating effect of R&D project performance were analyzed by simple and multiple regression analysis. Regression analysis was analyzed by SPSS statistical program. The higher the maturity level of the R&D process, the higher the product development performance and the R&D project performance, and the R&D project performance is partially mediated. It is concluded that it is important to establish and operate a systematic R&D process and to develop a project management methodology suitable for the characteristics of a company in order to improve product development performance. It is expected that if this study are utilized as practical R&D management methodology in corporate management, it will contribute to improvement of company product performance.

A Study on Economic Measurement Model of R&D Project Performance (R&D 프로젝트 성과의 경제적 가치 측정 모델 연구)

  • Kim, Young-Myoung;Sung, Hankyu
    • Journal of Technology Innovation
    • /
    • v.21 no.1
    • /
    • pp.229-252
    • /
    • 2013
  • The aim for this study is to suggest a practical model to measure the financial values of the achievements from corporate research and development(R&D) projects. Performance indicators for R&D projects were identified from the extensive literature reviews and the evaluation methods to convert them into financial values were proposed to overcome the problems of excessive predictions and subjective expert assessments in existing methods. The proposed model was applied to R&D projects of an IT company in Korea for its validity test. The model is expected to be a turning point in economic evaluation of corporate R&D projects in general due to its practical and reasonable scheme.

  • PDF

A Study on the Project Governance and the Project Performance (PMO의 프로젝트 거버넌스 역할이 프로젝트 성과에 미치는 영향에 관한 연구)

  • Kim, Min-Sun;Lim, Byung-Woo;Lee, Jae-Beum
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.13 no.4
    • /
    • pp.115-131
    • /
    • 2008
  • As the innovation of computer and communication technology, IT has played a role of increasing the business efficiency and offering new business opportunities. Many organizations have tried to launch IT projects, and the investment scale has been getting bigger. However, a lot of IT projects have been failed because of the difficulties of project management. Therefore, the purpose of this study is to know how the roles of project governance affect the project performance and what role of the project governance will be affected to solve the problems which might be taken place while developing the project. As the results of this study, the roles of project governance - linking, coordination, control, strategic direction, support, societal embedding, highly affect the project performance. To solve the problems which might be occurred while implementing the project, the control and the societal embedding roles playa crucial role compared to the other roles of the project governance. In other words, the roles of project governance should be utilized for the success of IT project, and the control and the societal embedding of the project governance should be modified and complemented to solve the problems which might be occurred while developing the project.

  • PDF

Examining the Influence of Fit between Project Radicalness and Organizational Innovativeness on the Supply Chain Integration (프로젝트 급진성과 조직 혁신성 간의 조화가 공급망 통합에 미치는 영향)

  • Min, Dae Hong;Jeong, Seung Ryul
    • Journal of Internet Computing and Services
    • /
    • v.15 no.2
    • /
    • pp.95-107
    • /
    • 2014
  • This study was conducted to empirically examine the impact of fit between project radicalness and innovativeness of the supply chain on the degree of supply chain integration. In order to test the research hypotheses, a survey was employed. The results show that the degree of supply chain integration varies on the fit between project radicalness and innovativeness of the supply chain. Specifically, when a supply chain consists of two morphogenetic organizations and the supply chain integration project is radical, we see very highly integrated supply chain. We also find high-level integration of supply chain when project is radical even though both a morphogenetic and a homeostatic organization compose a supply chain. However, we find opposite result, which is low integration, if a project is incremental rather than radical and a supply chain is composed of same types of the organizations mentioned above. Interestingly, degree of integration seems to be always low when a supply chain is composed of two homeostatic organizations, regardless of project radicalness. With these findings, this study concludes that a project whose radicalness is match with the supply chain's innovativeness should be chosen for successful supply chain integration.

An Empirical Study in the Effects of Six Sigma Project Management System on Project Balanced Scorecard (6시그마 프로젝트 관리시스템의 활용이 프로젝트 균형성과지표에 미치는 영향에 관한 실증적 연구)

  • Yang, Jong-Gon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.8
    • /
    • pp.2068-2077
    • /
    • 2009
  • While six sigma project management systems have been widely used as a knowledge management systems, no one has proposed an empirical explanation for impacts of project management systems on project performance. This study proposes a structural equation model of the project management system that relates learning/growth, internal growth, customer performance, and financial effects based on six sigma project performance. The relationships are investigated using data collected from a sample of green and black belts. The results indicate that there are a causal relationship with use of project management and learning/growth and internal process, internal process and customer performance, and customer and financial performance. However, there is no relationship between internal process and financial effects. The results suggest that six sigma project system could effectively be implemented as a knowledge management system to improve six sigma performance of green an black belts. This study also compares index of SEM's model fit of research model and that of alternative models for further analysis. The result shows that index of research model of index is better than that of alternative model.

The Influence of On-line Social Networking on Performance of Members in Information System Development Projects (정보시스템구축 프로젝트에서 구성원의 업무성과에 대한 온라인 소셜네트워킹의 영향)

  • Kim, Hee Yeong;Lee, John Hearn
    • Information Systems Review
    • /
    • v.16 no.1
    • /
    • pp.17-35
    • /
    • 2014
  • Social collaboration and knowledge sharing among experts are the key characteristics of information system development projects. But the difficulty and complexity of communication may be the cause of the project failures. This study analyzes the influence of on-line social networking as communication system in information system development projects. A model has been developed to relate system, knowledge and social factors of on-line social networking to the performance of project members. Transactive Memory System (TMS), describing knowledge sharing process in human relationship, is used as a mediator. The analysis concludes that knowledge and social characteristics have positive effect on the members' performance, implying that the use of mobile devices and PCs as a social communication tool can be an effective way to enhance the possibility of project success.

Fuzzy Structure Analysis for Factors of Project Performance (프로젝트 성과요인에 대한 퍼지구조분석)

  • Hwang, Seung-Gook;Park, Young-Man;Park, Kwang-Bak
    • Journal of the Korean Institute of Intelligent Systems
    • /
    • v.22 no.1
    • /
    • pp.114-118
    • /
    • 2012
  • The structure of layer for success factors of company project can be known by FSM which is available to recognize structure of the system. However, the relationship between the layers which belongs to the success factors of company projects can be unknown. From these viewpoints, this study is to analyze the structure of the relation between the layers contained the success factors of company projects using fuzzy system. Therefore, the relationship between lower vs middle layer and middle vs upper layer are obtained by evaluation model of company projects which has possibility and necessity of fuzzy system as fuzzy relation matrix. Using these results, fuzzy relation analysis is done and showed the usefulness.

Risk-based Profit Prediction Model for International Construction Projects (해외건설공사의 리스크 분석에 기초한 수익성 예측모델에 관한 연구)

  • Han, Seung-Heon;Kim, Du-Yon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.4D
    • /
    • pp.635-647
    • /
    • 2006
  • Korean construction companies first advanced to the international markets in 1960's and so far have brought more than 4,900 projects which account for 193 billion dollars approximately. With the large increase of national employment and income being followed by the achievement, Korea's construction industry has made an enormous contribution to the improvement of domestic economy for the last 40 years. However, recently the increased risk in international markets as well as the sharpening competition with foreign companies promising in terms of advanced technologies and low labor cost have been driving Korean construction away from the market shares. According to ENR (Engineering News Record, 1994~2003), it is revealed that 15.1% of top 225 global contractors are suffering from loss in international construction markets. This phenomenon is largely due to the highly uncertain characteristics of international projects, which are inherently exposed to various and complicated risky situations. Furthermore, especially for Korean construction companies, it is often the case that the failure in an international construction project cannot be offset by even a sufficient number of successful domestic achievements. Therefore, not only the selective screening among the nominated projects which have strong possibility of collapse but the systematic strategies for controlling potential risk factors are also considered indispensable in international construction portfolio management. The purpose of this study is to first analyze the causal relationships of the profit-influencing variables and the project success, and develop the profitability forecasting model in international construction projects.