• Title/Summary/Keyword: Hazard analysis

Search Result 2,748, Processing Time 0.039 seconds

Study on Mapping Methodof Liquefaction hazard Potential in Korea (국내의 액상화 구역도 작성 기법에 관한 연구)

  • 강규진
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 2000.04a
    • /
    • pp.141-150
    • /
    • 2000
  • In this study liquefaction hazard potential was assessed by modified Seed and Idriss method and maps of liquefaction hazard potential utilized by LPI(Liquefaction Potential Index) and FE(Equivalent Liquefaction Factor of Safety) were constructed in two dimensional space, Comparisons of liquefaction hazard maps assessed by LPI and FE are represented to verify the FE method proposed in this study. Based on the results of comparing liquefaction hazard map using LPI and FE there is similar distribution trend of zonation indices. from the result of comparison of liquefaction hazard maps of FE base using Hachinohe and ofunato PGA(Peak ground Acceleration) data at one site of port and harbor in Korea the values of FE in liquefaction hazard map using Hachinohe data are underestimated. And in the view of quantitative analysis FE is more convenient than LPI because types of results from FE are factor of safety that widely used in geotechnical practice and aseismic design standard for port and harbor in Korea.

  • PDF

Estimation of Wave Parameters for Probabilistic Tsunami Hazard Analysis Considering the Fault Sources in the Western Part of Japan (일본 서부 단층 지진원을 고려한 확률론적 지진해일 재해도 분석의 파고 변수 도출)

  • Rhee, Hyun-Me;Kim, Min Kyu;Sheen, Dong-Hoon;Choi, In-Kil
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.18 no.3
    • /
    • pp.151-160
    • /
    • 2014
  • Probabilistic tsunami hazard analysis (PTHA) is based on the approach of probabilistic seismic hazard analysis (PSHA) which is performed using various seismotectonic models and ground-motion prediction equations. The major difference between PTHA and PSHA is that PTHA requires the wave parameters of tsunami. The wave parameters can be estimated from tsunami propagation analysis. Therefore, a tsunami simulation analysis was conducted for the purpose of evaluating the wave parameters required for the PTHA of Uljin nuclear power plant (NPP) site. The tsunamigenic fault sources in the western part of Japan were chosen for the analysis. The wave heights for 80 rupture scenarios were numerically simulated. The synthetic tsunami waveforms were obtained around the Uljin NPP site. The results show that the wave heights are closely related with the location of the fault sources and the associated potential earthquake magnitudes. These wave parameters can be used as input data for the future PTHA study of the Uljin NPP site.

Review on Probabilistic Seismic Hazard Analysis of Capable Faults (단층지진원 확률론적 지진재해도 분석에 관한 고찰)

  • 최원학;연관희;장천중
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 2002.03a
    • /
    • pp.28-35
    • /
    • 2002
  • The probabilistic seismic hazard analysis for engineering needs several active fault parameters as input data. Fault slip rates, the segmentation model for each fault, and the date of the most recent large earthquake in seismic hazard analysis are the critical pieces of information required to characterize behavior of the faults. Slip rates provide a basis for calculating earthquake recurrence intervals. Segmentation models define potential rupture lengths and are inputs to earthquake magnitude. The most recent event is used in time-dependent probability calculations. These data were assembled by expert source-characterization groups consisting of geologists, geophysicists, and seismologists evaluating the information available for earth fault. The procedures to prepare inputs for seismic hazard are illustrated with possible segmentation scenarios of capable fault models and the seismic hazards are evaluated to see the implication of considering capable faults models.

  • PDF

Preliminary Hazard Analysis on ATC Functional Failure (열차제어기능 고장을 고려한 예비위험요인 분석)

  • Joung Eui-Jin,
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.1253-1258
    • /
    • 2004
  • The system safety must be ensured before customization. There was no specific requirement representing system safety in Korea until now. So we should draw safety requirements to guarantee system safety for the first time. In this paper, the Preliminary Hazard Analysis (PHA) to derive the safety requirements on the train control system was carried out. To analyze hazard, we have to deduce system functions, identify related hazards, derive the effects of the hazards, analyze current risks, define the target risks of the system, and deduce the alternative plans to reduce the effects of the hazards. For the case study, the detailed analysis on vehicle collision that was a main hazard of the train control system was carried out.

  • PDF

Causal Factors of Hazardous Event for People Struck Considering Environment Properties (환경특성을 고려한 열차충격 위험사건의 원인 인자 분석)

  • Kim, Min-Su;Wang, Jong-Bae;Park, Chan-Woo;Choi, Don-Bum
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.2116-2120
    • /
    • 2008
  • Recently, in the national railway industry there has been interested in the methodology of hazard analysis and risk assessment. The need of safety management system based on the technology of hazard analysis and risk assessment is being extended to identify in advance the weakness and threat factors causing the accident and cope with the accident actively. It is important to manage the risk of railway casualty accidents having a majority of railway accident. Especially, a hazard event of people struck takes the highest proportion of the railway casualty accidents. This paper describes the result of analysis for environment properties such as an age of casualty, time happened, day, month and weather conditions being concerned in the hazard event of people struck.

  • PDF

A study on the improvement of the score system in the hazard analysis and critical control points prerequisite program for meat shops in Korea

  • Baek, Seung-Hee;Nam, Insik
    • Korean Journal of Veterinary Research
    • /
    • v.61 no.3
    • /
    • pp.20.1-20.9
    • /
    • 2021
  • This study is to develop a new scoring system for rating Hazard analysis and critical control points prerequisite evaluation items for meat shops to provide a more objective and accurate evaluation of food safety compliance. The importance of each item was measured by looking at the hazard severity level and the rate of non-compliance associated with it. It was found that the new scoring system is more stringent and gives a clearer picture of compliance with the most critical safety standards, and therefore is expected to have a positive effect on the hygiene and safety of livestock products.

Typhoon wind hazard analysis using the decoupling approach

  • Hong, Xu;Li, Jie
    • Wind and Structures
    • /
    • v.35 no.4
    • /
    • pp.287-296
    • /
    • 2022
  • Analyzing the typhoon wind hazards is crucial to determine the extreme wind load on engineering structures in the typhoon prone region. In essence, the typhoon hazard analysis is a high-dimensional problem with randomness arising from the typhoon genesis, environmental variables and the boundary layer wind field. This study suggests a dimension reduction approach by decoupling the original typhoon hazard analysis into two stages. At the first stage, the randomness of the typhoon genesis and environmental variables are propagated through the typhoon track model and intensity model into the randomness of the key typhoon parameters. At the second stage, the probability distribution information of the key typhoon parameters, combined with the randomness of the boundary layer wind field, could be used to estimate the extreme wind hazard. The Chinese southeast coastline is taken as an example to demonstrate the adequacy and efficiency of the suggested decoupling approach.

A study on the Risk Assesment Procedure for Work in the Operational Railway (철도운행선 공사의 위험도 평가절차 수립 연구)

  • Wang, Jong-Bae;Park, Ju-Nam;Park, Chan-Woo;Kwak, Sang-Log
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.1037-1045
    • /
    • 2006
  • In this study, a hazard analysis was performed on the accident related work in the operational railway during 2000-2006 years in order to establish risk assesment procedure for work in the operational railway. As a result of hazard analysis, various hazard events for person accident and operation incident were identified, and risk for the each events was evaluated. Also risk matrix was structurized for setting the risk control criteria.

  • PDF

Classification of Cities in the Metropolitan Area based on Natural Hazard Vulnerability (기후변화 대응을 위한 광역도시권 차원의 자연재해 저감방안 연구 -자연재해 취약성에 따른 수도권 도시의 유형화-)

  • Shim, Jae Heon;Kim, Ja Eun;Lee, Sung-Ho
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.11
    • /
    • pp.5534-5541
    • /
    • 2012
  • This paper classifies cities in the metropolitan area based on natural hazard vulnerability. The procedure of our empirical analysis is divided into three parts as follows: First, it summarizes variables related to natural hazard vulnerability to significant factors, carrying out principal component analysis. Second, it classifies cities in the metropolitan area, conducting cluster analysis using factor scores. Lastly, it proposes differential measures for natural hazard mitigation for classified cities in the metropolitan area, based on natural hazard vulnerability.

A Study on the Selection of Candidates for Substances Subject to Permission Using Chemicals Ranking and Scoring (CRS) (화학물질 우선순위 선정기법(CRS)을 활용한 허가대상 후보물질 선정 연구)

  • Kim, Hyo-dong;Park, Kyo-shik
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.32 no.3
    • /
    • pp.253-267
    • /
    • 2022
  • Objectives: This study was performed to check whether the CRS (Chemical Ranking and Scoring) system is appropriate as a method to determine substances as candidates for substances subject to permission and to apply this system to the selection of candidates for substances subject to permission. Methods: A risk score was obtained by multiplying the hazard score and the exposure score and then ranking them. The hazard sub-indicators are carcinogenicity, germ cell mutagenicity, reproductive toxicity, specific target organ toxicity-repeated exposure, respiratory sensitization and endocrine disrupting chemicals. Exposure sub-indicators are persistence, bioaccumulation and emission volume. Sensitivity analysis was performed for missing values. Correlation analysis and multivariable linear regression analysis were performed among hazard, exposure and risk in order to confirm that CRS was an appropriate method. Results: As a result of the sensitivity analysis on missing values, it was confirmed that the effect on the risk ranking was not sensitive. Correlation and regression analysis confirmed that exposure had a greater effect on risk than hazard. Conclusions: The CRS system, which derives a risk score using a hazard and exposure score, is judged to be appropriate as a method for the selection of preliminary of candidates for substances subject to permission. Benzene, cadmium, nickel, and cobalt were selected as priority candidates for substances subject to permission.