• Title/Summary/Keyword: Gas piping

Search Result 156, Processing Time 0.024 seconds

A Study on the Steam Hammering Characteristics by Sudden Closure of Main Stop Valve in the Main Steam Piping System of a Power Plant (화력발전소 주증기배관에서 밸브 차단에 따른 수증기 충격 특성에 관한 연구)

  • Ha, Ji-Soo;Lee, Boo-Youn
    • Journal of the Korean Institute of Gas
    • /
    • v.17 no.2
    • /
    • pp.70-77
    • /
    • 2013
  • The present study has been carried out to analyze the effect of steam hammering on the steam piping system including the final superheater, the high pressure turbine, check valve and the first reheater by sudden stoping of main stop valve in a power plant. For the present steam hammering analysis, the well known Flowmaster software has been used to model the steam piping system and the time dependent characteristics of pressure and steam mass flow rate has been conducted. Using the result of the unsteady pressure and steam mass flow rate, the forces acting on the elbows in the piping system has been derived. From the present analysis, it has been elucidated that the elbow just before the main stop valve and the elbow near the connection pipe between bypass pipe and check valve had the largest force among the elbows in the steam piping system. The structural safety diagnostics study on the elbow and the supporting structures of the steam piping system of a power plant will be conducted in the future by the present results of the forces acting on the elbow.

Study for Field Inspection of Phase-Array Ultrasonic for Electro-fusion Joints of Polyethylene Gas Pipes (폴리에틸렌 가스배관 전기융착부 위상배열초음파검사 현장사례 연구)

  • Kil Seong-Hee;Kwon Jeong-Rock;Park Kyo-Shik
    • Journal of the Korean Institute of Gas
    • /
    • v.10 no.2 s.31
    • /
    • pp.61-67
    • /
    • 2006
  • We developed the ultrasonic phased array technique for obtaining ultrasonic images of electrofusion joints of polyethylene piping. And we inspected 4 cases at fields with this technique. First case is for the 300 mm diameter polyethylene electrofusion joint by using 3.5 MHz phased array sensor, second is for the 350 mm diameter saddle electrofusion joint, third is for the 400 mm diameter electrofusion joints and the last one is for the 400 mm diameter piping joints which will be used at 300 kPa suppling pressure.

  • PDF

Non-contact monitoring of 3-dimensional vibrations of bodies using a neural network

  • Ha, Sung Chul;Cho, Gyeong Rae;Doh, Deog-Hee
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.39 no.10
    • /
    • pp.1011-1016
    • /
    • 2015
  • Gas piping systems in power plants and factories are always influenced by the mechanical vibrations of rotational machines such as pumps, blowers, and compressors. Unusual vibrations in a gas piping system influence possible leakages of liquids or gases, which can lead to large explosive accidents. Real-time measurements of unusual vibrations in piping systems in situ prohibit them from being possible leakages owing to the repeated fatigue of vibrations. In this paper, a non-contact 3-dimensional measurement system that can detect the vibrations of a solid body and monitor its vibrational modes is introduced. To detect the displacements of a body, a stereoscopic camera system is used, through which the major vibration types of solid bodies (such as X-axis-major, Y-axis-major, and Z-axis-major vibrations) can be monitored. In order to judge the vibration types, an artificial neural network is used. The measurement system consists of a host computer, stereoscopic camera system (two-camera system, high-speed high-resolution camera), and a measurement target. Through practical application on a flat plate, the measured data from the non-contact measurement system showed good agreement with those from the original vibration mode produced by an accelerator.

Study on Exposed Piping with High Risk of Fire (화재 위험성이 높은 노출배관 사용에 관한 연구)

  • Kim, Yeob-Rae;Baek, Dong-Hyun
    • Fire Science and Engineering
    • /
    • v.29 no.4
    • /
    • pp.61-66
    • /
    • 2015
  • PVC pipe has excellent corrosion resistance and chemical resistance and is broadly used. However there are no regulations regarding exposed piping material in buildings. There is growing concern about the vulnerability of piping to fires and generating toxic gas. Exposed piping should be made of incombustible materials to prevent spreading of toxic gas and to minimize damage to life and property in case of fire. Many big structures are being built, and concerns regarding damage by fire are continuously growing. In these circumstances, we should reinforce fire safety standards for buildings and heighten safety consciousness to become a well-developed country. For these reasons, we investigated the materials used for exposed piping and the standards of well-developed countries to enhance safety. We tried to figure out the alternatives by examining the actual conditions of each region's buildings. Based on the use of incombustible materials for exposed piping in each region, we tried to enhance the effectiveness for safety by suggesting revisions for related laws and regulations.

Calculation of the Attached-Piping-Material Rate for the Building Mechanical-Service System in Office Buildings (사무소 건축물의 건축기계설비 배관 부속자재 요율 산출)

  • Park, Yool
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.29 no.4
    • /
    • pp.185-194
    • /
    • 2017
  • Currently, in comparison with other architectural estimations, the estimation work regarding building mechanical-service systems is time-consuming, and the process is continuously becoming more difficult because of the increased usage of the attached piping materials such as fittings and hangings in addition to their complicated construction processes. To improve this problem, the Korean authority provides a simple estimation method for the attached-material rate regarding the main piping material, which is the most time-consuming work in the architectural-mechanical estimation. However, to be an applicable method on construction sites, a proper conversion rate of the attached-piping material is still required for the proposed method regarding building usage and working types. Therefore, the purpose of this research is the calculation of the rate of the attached-piping materials such as the fittings and supports through the building of the mechanical-service work types of mechanical rooms, air conditioning, domestic water and hot-water supplies, and the drain-, vent-, and gas-piping work in office buildings that have been designed after 2010.

Study on System Support for Offshore Plant Piping Process Using 3D Simulator

  • Kim, Hyun-Cheol;Lee, Gyu-Hong
    • Journal of Ocean Engineering and Technology
    • /
    • v.34 no.3
    • /
    • pp.217-226
    • /
    • 2020
  • An offshore plant is an offshore platform that can process oil and gas resources in rough seas with a poor working environment. Moreover, it is a complex structure with different types of offshore facilities and a large amount of outfitting that connects different offshore installations. In particular, an enormous amount of various piping materials is installed in a relatively narrow space, and thus, the difficulty of working is relatively high compared to working in ships or ground plants. Generally, when the 3D detailed design is completed, an offshore plant piping process is carried out at the shipyard with ISO 2D fabrication drawings and ISO 2D installation drawings. If a worker wants to understand the three-dimensional piping composition in the working area, he can only use three-dimensional viewers that provide limited functionality. As offshore plant construction progresses, correlating work with predecessors becomes more complicated and rework occurs because of frequent design changes. This viewer function makes it difficult to identify the 3D piping structure of the urgently needed part. This study deals with the process support method based on a system using a 3D simulator to improve the efficiency of the piping process. The 3D simulator is based on the Unity3D engine and can be simulated by considering the classification and priority of 3D models by the piping process in the system. Further, it makes it possible to visualize progress information of the process. In addition, the punch content can be displayed on the 3D model after the pipe inspection. Finally, in supporting the data in relation to the piping process, it is considered that 3D-simulator-supported piping installing could improve the work efficiency by more than 99% compared to the existing method.

Suggestion of the Attached Piping Material Rate for the Mechanical Fire Protection Facilities in Office Buildings (업무용 건축물의 기계소방시설 배관 부속자재 요율 제시)

  • Park, Lyool;Park, Kyung-Soon;Yoon, Hang-Mook
    • Journal of the Regional Association of Architectural Institute of Korea
    • /
    • v.20 no.6
    • /
    • pp.1-8
    • /
    • 2018
  • In generally, the estimation work regarding building mechanical service system in comparison with other architectural estimations is time-consuming, and the process is continuously getting more difficult because of the increased usage of the attached piping materials such as fittings and supports in addition to their complicated construction processes. In order to improve this problem, the Korean authority provides a simple method to estimate the attached material rate regarding the main piping material, which is the most time-consuming work in the architectural mechanical estimation. However, to be an applicable method on construction site, a proper conversion rate of the attached piping material is still required for the proposed method regarding building usage and working types. Therefore, the purpose of this research is the suggestion of the material and labor cost rate of the attached piping materials such as the fittings and supports by work types and fitting methods of indoor fire, sprinkler, and extinguishing gas piping work of mechanical fire protection facilities in office buildings that have been designed after 2010.

Experimental Study on the Water Hammer Absorption Effects of Water Hammer Arrester in the Water Supply Piping System (급수관로계에 설치된 수격흡수기의 수격흡수효과에 관한 실험적 연구)

  • Choi, Jung-Geun;Lee, Suk-Jong;Lee, Myoeng-Ho;Sung, Jae-Yong
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.30 no.3
    • /
    • pp.396-402
    • /
    • 2006
  • In this study, dynamic characteristics of water hammer pressure in water supply piping system with water hammer arrester has been investigated experimentally to characterize the transient pressure of water hammer in high rise building. Experiments were conducted to verify the absorption effects by water hammer arresters with 3 different gas volumes of water hammer pressure generated by sudden valve closure. As the results, it has been found that zoning and sizing of pipe diameter for suitable flow velocity and water hammer arresters with effective pressure absorption capacity have to be installed to protect water hammer problems in building water supply piping system.

Experimental Capacity of Suspended Piping Trapeze Restraint Installations under Cyclic Loadings (반복하중을 받는 경량 배관 서포트 시스템에 대한 실험적 성능 평가)

  • Jeong, Sang-Deock;Oh, Chang-Soo;Park, Min Jae;Lee, Chang-Hwan
    • Journal of Korean Association for Spatial Structures
    • /
    • v.23 no.3
    • /
    • pp.79-86
    • /
    • 2023
  • Damage to gas and fire protection piping systems can lead to secondary disasters after an earthquake, so their seismic design is crucial. Accordingly, various types of seismic restraint installations are being devised, and a new suspended piping trapeze restraint installation has also recently been developed in Korea. In this study, a cyclic loading test was performed on the developed trapeze support system, and its performance was evaluated according to ASHRAE 171, the standard for seismic and wind restraint design established by the American Society of Refrigeration and Air Conditioning Engineers (ASHRAE). The three support system specimens did not break or fracture, causing only insignificant deformations until the end of the experiment. Based on the experimentally rated strength and displacement performance, this trapeze support system is expected to control the seismic movement of piping during an earthquake.

The CFD Analysis Comparison of Several Snubbers with different Buffer Width (버퍼의 넓이가 다른 스너버의 수치해석 비교)

  • Lee, G.H.;Shim, K.J.;Lee, Y.H.;Chung, H.S.;Jeong, H.M.
    • Journal of Power System Engineering
    • /
    • v.11 no.4
    • /
    • pp.38-43
    • /
    • 2007
  • Pulsation is an inherent phenomenon in reciprocating compressors. It interacts with piping to cause vibrations and performance problems. Indiscriminately connecting to a compressor can be dangerous and cost money in the form of broken equipment and piping, poor performance, inaccurate metering, unwanted vibration, and sometimes noise. Piping connected to a compressor can materially affect the performance and response. To minimize these detrimental effects, reciprocating compressor system should be equipped by pulsation suppression system. The system usually comprises bottle volume, called snubber. Snubber is one of the most important parts in hydrogen compressing system. It has installed reciprocating hydrogen compressor. One of these components is snubber which has function to reduce pulsation waveform and to remove the impurities in the hydrogen gas. A snubber has an inclined plate as a buffer, which is installed inside snubber. When the pressure loss and the pulsation of pressure within a snubber is minimized, the snubber could get more applicability. Therefore, a study to find an optimum geometric size on a several snubbers which have different buffer width, has been conducted using a numerical analysis.

  • PDF