Browse > Article
http://dx.doi.org/10.6110/KJACR.2017.29.4.185

Calculation of the Attached-Piping-Material Rate for the Building Mechanical-Service System in Office Buildings  

Park, Yool (Department of Building Systems Engineering, Dongeui University)
Publication Information
Korean Journal of Air-Conditioning and Refrigeration Engineering / v.29, no.4, 2017 , pp. 185-194 More about this Journal
Abstract
Currently, in comparison with other architectural estimations, the estimation work regarding building mechanical-service systems is time-consuming, and the process is continuously becoming more difficult because of the increased usage of the attached piping materials such as fittings and hangings in addition to their complicated construction processes. To improve this problem, the Korean authority provides a simple estimation method for the attached-material rate regarding the main piping material, which is the most time-consuming work in the architectural-mechanical estimation. However, to be an applicable method on construction sites, a proper conversion rate of the attached-piping material is still required for the proposed method regarding building usage and working types. Therefore, the purpose of this research is the calculation of the rate of the attached-piping materials such as the fittings and supports through the building of the mechanical-service work types of mechanical rooms, air conditioning, domestic water and hot-water supplies, and the drain-, vent-, and gas-piping work in office buildings that have been designed after 2010.
Keywords
Attached piping materials; Fittings; Supports; Rate; Construction types;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Yoo, S. Y., 2004, A study of methods for standardization and simplification of construction material bill, Public Procurement Service.
2 Yoo, S. Y., Lee, J. M., Park, J. T., Han, S. B., and Kim, J. G., 2005, Methods for standardization and simplification of construction material bill, Proceeding of SAREK, pp. 959-964.
3 Korea Institute of Civil Engineering and Building Technology, 2016 standard of construction estimate, pp. 948-952.
4 Kwak, S. H. and Park, Y., 2005, A study of the simplified method of estimate work in building equipment field, Proceeding of AIK-PK, pp. 731-734.
5 Park, Y. and Lee, K. H., Calculation of the attached pipimg material rate for simplification of estimation work in apartment with individual heating system, Journal of the Regional Association of Architectural Institute of Korea, Vol. 53, pp. 107-114.