• Title/Summary/Keyword: Gas & Oil Plant Project

Search Result 13, Processing Time 0.025 seconds

THE INTRODUCTION METHOD OF TECHNOLOGY MANAGEMENT IN THE OIL AND GAS PLANT INDUSTRY

  • Doo Hee Lee;Young Woong Song;Hyoung Chul Lim;Yoon Ki Choi
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.249-258
    • /
    • 2007
  • Recently orders of projects in the field of oil and gas plants have increased due to rising oil prices and consumption. The markets of oil and gas plants are expanding into the Middle East area and all over the world. Because the oil and gas markets have a lot of overseas construction operations, competition among advanced companies is more important. However, companies in the period of growth have not had enough competitive powers of license in the design phase. Therefore, they are faced with difficulty of adopting the technology which is maximizing the effect of investments, and scheduling of a long-range plan. In order to achieve adequate technology management and competitive power, this study considers a long-range plan through an analysis of an appropriate introduction and the strategic planning process of technology management.

  • PDF

Analysis of the Procurement Management Process for the Gas & Oil Plant projects (Gas & Oil 플랜트 조달관리 프로세스 분석)

  • Won, Seo-Kyung;Kang, Min-Woo;Lee, Jun-Bok;Kim, Sun-Kuk;Han, Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.491-494
    • /
    • 2007
  • Recently Gas & Oil plant construction projects are increasing in the world. The EPC (Engineering, Procurement and Construction) company, which participate in the plant projects, should possess the pertinent engineering license and procurement skill to create high added-value. It is because the procurement is very substantial to cover 70% of the total project cost. Nonetheless, there exist various risks involved in the procurement process due to the characteristics of the construction projects with long duration and complicated process as well as the procured goods or services subjected to various logistics. The objective of this paper is to analyze proper process in the procurement and to identify various information and document. Also to analyze procurement process, the principal data are derived from the interview with experts and specialty contractors of plant project. The result of this study would widely be used as a guide to the procurement personnel in forecasting the risks in advance.

  • PDF

The Application Scheme of Management of Technology for Strengthen the Competitiveness in Oil and Gas Plant Industry (오일.가스 플랜트 산업의 경쟁력 강화를 위한 기술경영 도입방안)

  • Song, Young-Woong;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.116-123
    • /
    • 2007
  • Recently orders of project in the field of oil & gas plant have been increased due to raising oil prices and consumptions. Domestic oil & gas companies are expanding into the Middle East area and all over the world. In the field of oil & gas plant, it is important to manage a technical control and a license that is occurred when developing the manufacturing processes and technologies. Because the oil & gas market has a lot of executions of the oversea construction, competitions between the advanced companies is more important. Therefore, we have to adopt systematic management style for achievements of the technical competitive power and the higher position. However, domestic oil & gas plant companies have not enough competitive powers of the license and the design phase. So, they are faced with difficulties of adopting the technology which is maximizing the effect of investments and scheduling a long-range plan. To achieve the technology management and the competitive power, this study proposes a long-range plan through the analysis of execution methods for technology management.

Experimental Study on Wear Characteristics of Metallic Materials used in Oil Sands Plants (오일샌드 플랜트용 금속소재의 마모 특성에 대한 실험적 연구)

  • Won, Sung-Jae;Cho, Seung-Hyun;Kang, Dae-Kyung;Heo, Joong-Sik
    • Tribology and Lubricants
    • /
    • v.33 no.1
    • /
    • pp.31-35
    • /
    • 2017
  • Recently, international attention has been focused on the development of non-traditional energy resources such as shale gas and oil sands, due to the steep increase in the demand for natural resources. The materials incorporated in an oil gas plant module experience extreme environments, and are prone to various problem such as fracture, corrosion and abrasion due to low-temperature brittleness. In order to improve the plant life, it is necessary to perform characteristics study and performance evaluation of the materials. In particular, this paper explains the main set of materials which are most frequently used in oil sands plant project. In order to investigate wear characteristics, the authors carried out abrasive wear tests of TP 316, stainless steel and SS 400, structural rolled steel. For the analysis of the abrasive wear resistance of an oil sands plant, the authors carried out the test according to ASTM G 105 "Standard Test Method for Conducting Wet Sand/Rubber Wheel Abrasion Test" standard guidelines. The authors have derived the results from the data associated with the loss of mass with respect to wear rate. During the test, for a given wear length for 10,000 revolutions, the rotational speed and applied force of the rubber wheel were varied.

Fundamental Investigation of Knowledge Management System for a Plant

  • Seo-kyung Won;Ji-Yune Soh;Junbok Lee ;Choong-hee Han
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.375-380
    • /
    • 2009
  • Gas & Oil plant construction projects are increasing recently all over oil-producing countries. An EPC (Engineering, Procurement and Construction) company, which participates in the plant projects, should possess pertinent engineering licenses and EPC management skills to create high added-value. Nonetheless, there exist various risks involved in the EPC life cycle process due to such characteristics of construction projects as long duration of construction time and complicated processes along with the procured goods or services subjected to various logistics. The objective of this paper is to analyze the overall EPC life cycle for proper process and to examine various information and document. Additionally, the principal data for the analysis of the EPC process are derived from personal interviews with experts and specialty contractors of the plant projects. The results of this study would be widely used as a guide for efficient and effective management of overseas gas plant projects.

  • PDF

Review on the water-gas shift process for a coal SNG project (석탄 SNG 생산설비의 수성가스전환 공정 분석)

  • Kim, Youngdo;Shin, Yongseung
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.11a
    • /
    • pp.75.1-75.1
    • /
    • 2011
  • Coal gasification is considered as one of the most prospective technologies in energy field since it can be utilized for various products such as electricity, SNG (Synthetic Natural Gas or Substitute Natural Gas) and other chemical products. Among those products from coal gasification, SNG is emerging as a very lucrative product due to the rising prices of oil and natural gas, especially in Asian countries. The process of SNG production is very similar to the conventional IGCC in that the overall process is highly dependent on the type of gasifier and coal rank. However, there are some differences between SNG production and IGCC, which is that SNG plant requires higher oxygen purity from oxygen plant and more complex gas cleanup processes including water-gas shift reaction and methanation. Water-gas shift reaction is one of the main process in SNG plant because it is a starting point for the latter gas cleanup processes. For the methanation process, syngas is required to have a composition of $H_2$/CO = 3. This study reviewed various considerations for water-gas shift process in a conceptual design on an early stage like a feasibility study for a real project. The factors that affect the design parameters of water-gas shift reaction include the coal properties, the type of gasifier, the overall thermal efficiency of the plant and so on. Water-gas shift reaction is a relatively proven technology compared to the other processes in SNG plant so that it can reduce technological variability when designing a SNG project.

  • PDF

PROGRAMMATIC AND PROJECT-LEVEL RISKS: ESTABLISHING A RISK MANAGEMENT PROCESS FOR MIDDLE EAST PLANT PROJECTS

  • G. Edward Gibson Jr.;John Walewski;SangBum Kim;Clayton Ingam;Hamid Hajian
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1000-1014
    • /
    • 2009
  • Research sponsored by the Korean Government investigated the establishment of a risk management process by Korean contractors involved with plant projects in the Middle East. This research effort builds upon the work completed by the Construction Industry Institute (CII), called the International Project Risk Assessment (IPRA) tool and method, and also explored how CII's Project Definition Rating Index (PDRI) could be incorporated to improve project planning by addressing risks and scope development issues. Specific findings and recommendations were developed including the creation of the Contractor Critical Areas of Concern (CCAC) risk screening tool for Korean contractors pursuing Middle East oil and gas projects.

  • PDF

On the Analysis of Risk Management for a Utility Construction Work in Plant Projects (플랜트 유틸리티 시공에서 리스크 관리에 관한 연구)

  • Han, Ki-Don;Hur, Jin-Huek;Moon, Seung-Jae;Yoo, Hoseon
    • Plant Journal
    • /
    • v.6 no.1
    • /
    • pp.64-70
    • /
    • 2010
  • From 2000, the world plant market, especially plant developing business related to oil and gas, has been increasing. Domestic construction companies advance to overseas plant construction market actively, and proportioning to this, an importance of utility construction is increasing. However, the project becomes large and high-tech, and many companies experience difficulty of project management due to relatively high risk of overseas construction. In this study, we built the standard process with which domestic company can evaluate the risk of overseas plant utility construction. Primary factors for risk evaluation is derived, classification system is made out, primary factor is analyzed, and counter plan is suggested. And thorough management of risk is performed by risk management organization that manages the risks, risk control methods, reports and monitors through risk sheet and risk action log from the start of project to the end.

  • PDF

Risk-sharing Strategies on EPC Contracts: Lessons-learned from Sabine Pass Liquefaction Project

  • Yoon, Sang-Moon;Lee, Jung-Heon;Lee, Eul-Bum
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.629-630
    • /
    • 2015
  • 'Sabine Pass Liquefaction Project (SPL Project)', a case study in this report, is the first construction project of a U.S. liquefaction facility for shale gas export overseas. This study analyzes the SPL Project to give understanding and a guideline to Korean EPC companies by benchmarking about effective risk-sharing strategies on EPC contracts. This study consists of three parts. The first summarizes the liquefaction process adopted on the SPL Project, named the 'ConocoPhillips Optimized Cascade Process', and compares it with other competitive liquefaction processes. The second introduces the unique features of the SPL EPC contract by comparing it with two other EPC forms of contracts: a FIDIC Silver Book for onshore plant projects and a contract of an offshore oil production (FPSO) project. The third focuses on the complexity of project financing (PF), especially lenders control and impact on the EPC contract such as covenant provisions to constrain variations and changes on the EPC Contract. From these conclusions, it is anticipated that this case study can provide a guideline for successful performance of Korean EPC contractors overseas.

  • PDF

A Study on Information Breakdown through the Analysis of Industrial Engineering EPC Business Process (산업설비 EPC 업무 분석을 통한 정보 분류 내역에 관한 연구)

  • Cho, Hang-Min;Song, Young-Woong;Choi, Yoon-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.167-172
    • /
    • 2006
  • It follows recently in an order augmentation of overseas construction market plant field and the project of oil gas field is increasing. Consequently, the hazard which secures the competitive power of the overseas plant enterprise of the domestic building industry enterprises the technical competitiveness security which stands, productivity improvement and strategy management propulsion back positive disposal plan establishment are demanded. Even from in that oil gas field of overseas plant enterprise for an industrial competitive power improvement the application of EPC circulation information which relates with a project accomplishment is more demanded, the EPC phased star efficiently it manages the circulation information contents which occurs from the business which is various it is not presented it cannot there is a contents classification system for. If with him about lower the draft the problem point of information omission back of occurrence and business subject for of the fringe land and duplication business occurs, about lower the productivity decrease actual condition is appearing with such problem point. The research which it sees consequently in order to improve the use characteristic of the augmentation of practical application of the contents management system of oil gas field and building industry information civil official establishhes the contents management system the BPM for (Business Process Management) to present the contents classification system of base, it does to sleep. The part of Business Process materiality the knowledge which is demanded, contents information and system anger it analyzes system anger of industrial equipment circulation information it takes a triangular position and to sleep it does.

  • PDF