The majority of development projects fail to meet their target schedule and cost, with the overrun typically between 40 and 200 percent. These overruns happen because the planners underestimate the work or do not consider the need to rework at project planning. Representative schedule planning/management techniques such as Gantt Chart, PERT/CPM etc. that are used in domestic project planning are unable to reflect rework. This paper proposes a method to consider rework to provide more realistic estimates at schedule planning. Additionally, to prevent the underestimation of the work this paper proposes a simulation method that calculates a probabilistic estimated schedule and the associated variance based on the random variable modeling of individual task completion dates.
Korean Journal of Construction Engineering and Management
/
v.24
no.2
/
pp.13-23
/
2023
Unlike building construction projects, where the activity is repeatedly carried out in a limited area, civil engineering projects such as roads and railroads are carried out in a linear type in a horizontal working space over several tens of kilometers. Each activity is managed with a station number that has a unit of distance from the starting point to the end point. For this reason, since the work location information of the activity is a major management factor, the Gantt chart system that expresses only schedule information may have limitations. In this study, authors propose a method for constructing a linear schedule chart that can simultaneously express schedule information indicating the start and finish dates and location information indicating the start and end positions of each activity, and develop a system for generating a linear schedule chart. In the study, the coordinate axes of the linear schedule chart consisted of distance and date values on the X and Y axes, respectively, and each activity was expressed as a symbol that can infer the type of work to increase the visibility of the linear schedule chart compared to the simple bar chart method. The linear schedule chart generation system was reviewed for practical applicability by utilizing the actual schedule data of bridge structures in a railroad project.
Proceedings of the Korean Operations and Management Science Society Conference
/
1993.10a
/
pp.165-173
/
1993
생산일정계획 수립 시스템을 통하여 수립된 생산계획을 현장에서 실천하고자 할 때, 일반적으로 계획수립 후 얼마 지나지 않아 계획수립시 고려할 수 없었던 기계고장 또는 자재조달 지연, 작업 지체, 주문 취소 등과 같은 요인으로 생산일정을 계획대로 실천할 수 없는 경우가 발생한다. 이런 상황에서는 기존의 생산계획을 계속 실행할 수 없으므로 손쉽게 대처할 수 있는 방안이 필요하다. 본 연구에서는 일정계획편집기를 이러한 문제점을 해결할 수 있는 대안으로 제시한다. 일정계획편집기를 GUI, 객체지향적 설계를 통해 구현하므로서 이상상황과 일정변동에 효과적으로 대처할 수 있다. GUI환경을 통해, 수립된 생산일정과 이상상황, 작업진척, 수행도 등을 화면에 Gantt 도표로 표시해 주어 현장 파악을 용이하게 하고 작업추가, 삭제, 작업시간 변경, 대체공정으로의 이동 등의 편집을 mouse와 icon을 이용, 편리하게 수행할 수 있다. 편집작업시 자동으로 생산일정의 타당성을 만족시켜 줄 수 있는 지능화를 위한 기초 단계로서 객체지향설계를 이용한 규칙기반 일정계획 편집기를 설계한다.
Journal of Korean Institute of Industrial Engineers
/
v.12
no.1
/
pp.13-18
/
1986
This paper is concerned with flow-shop permutation scheduling problem. This paper presents an algorithm for the minimum makespan sequence. The efficiency of proposed algorithm is demonstrated by comparisons with the existing algorithms: Johnson's, branch & bound method, and heuristic algorithms. The proposed algorithm is more effective than the other algorithms. A numerical example is given to illustrate the procedure.
Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
/
v.21
no.1
/
pp.89-97
/
2003
This study is aimed at standardizing the process of spatial database construction and developing a software tool for process management. Knowhow of five GIS firms and provisions of NGI(National Geography Institute) was analyzed. In this study, the process of spatial database construction was standardized. The system from this study has the capability to manage the process of construction database using GIS and to deal with the metadata of unit map, generated from the process, systematically and continuously. The process was also shown by using either Gantt chart or PERT chart after developing an interface for "MS Project". A software "Visual Basic for Application" was used for this study.
Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
/
2003.04a
/
pp.285-290
/
2003
This study is aimed at standardizing the process of spatial database construction and developing a software tool for process management. Knowhow of five GIS firms and provisions of NGI(National Geography Institute) were analyzed. In this study, the process of spatial database construction was standardize. The system from this study has the capability to manage the process of construction database using GIS and to deal with the metadata of unit map, generated from the process, systematically and continuously The process was also shown by using either Gantt chart or PERT chart after developing an interface for "MS Project". A software "Visual Basic for Application" was used for this study.
Resource Constrained Dynamic Multi-Projects Scheduling (RCDMPS) is intended to schedule activities of two or more projects sequentially arriving at die shop under restricted resources. The aim of this paper is to develop a new problem solving method for RCDMPS to make an effect schedule based by constraint programming. The constraint-based scheduling method employs ILOG Solver which is C++ constraint reasoning library for solving complex resource management problems and ILOG Schedule which is a add-on library to ILOG Solver dedicated to solving scheduling problems. And this method interfaces with ILOG Views so that the result of scheduling displays with Gantt chart. The scheduling method suggested in this paper was applied to a company scheduling problem and compared with the other heuristic methods, and then it shows that the new scheduling system has more preference.
생산계획이 수립되어 있는 상태에서 각 공정에 대한 구체적인 일정계획을 수립하였다. Group Technology를 이용하여 부품그룹을 형성하고, 흐름 생산형태의 GT라인으로 가공공정을 배치한 상태에서, Group Scheduling 기법을 활용하였다. 가공순서 결정 규칙으로 Petrov의 방법을 이용하였으며, 부품의 생산량을 고려하여 그룹간 가공순서와 그룹내 각 부품의 가공순서를 결정하였다. 이 과정을 전산화하여 실제로 이용할 수 있도록 하였다. 또한, Gantt Chart를 작성하여 각 공정의 부품별 가공 시작시간과 가공 완료시간을 계산하여, 작업지시는 물론 공정관리에 효과적으로 활용할 수 있도록 하였다. 컴퓨터 프로그램은 쉽게 실용적으로 활용할 수 있도록 하는데 중점을 두었다. 준비시간 및 가공시간에 대한 데이타는 업체에서 이미 사용하고 있는 생산정보 파일을 그대로 이용하거나, 그렇지 않는 경우 여러 용도에 맞도록 이 데이타를 파일로 작성하면 프로그램을 더욱 효율적으로 사용할 수 있으리라 기대된다.
Transactions of the Korean Society of Mechanical Engineers A
/
v.25
no.3
/
pp.443-451
/
2001
This paper addresses an on-line scheduling method for track systems in semiconductor fabrication. A track system is a clustered equipment performing photolithography process in semiconductor fabrication. Trends toward high automation and flexibility in the track systems accelerate the necessity of the intelligent controller that can guarantee reliability and optimize productivity of the track systems. This paper proposes an-efficient on-line scheduling method that can avoid deadlock inherent to track systems and optimize the productivity. We employ two procedures for the on-line scheduling. First, we define potential deadlock set to apply deadlock avoidance policy efficiently. After introducing the potential deadlock set, we propose a deadlock avoidance policy using an on-line Gantt chart, which can generate optimal near-optimal schedule without deadlock. The proposed on-line scheduling method is shown to be efficient in handling deadlock inherent to the track systems through simulation.
Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
/
2004.11a
/
pp.355-360
/
2004
This study is aimed at developing the system to manage the process and metadata of spatial data construction. The process of spatial data construction is standardized by analyzing knowhow of major firms and the provisions of MOCT(Ministry of the Construction and Transportation), and by appling the development methodology of information system. The system from this study has the capability to manage efficiently the process and metadata of spatial data construction. The process is shown by using index map. Also, it is shown by using Gantt chart and PERT chat after developing the interface for MS Project. The metadata is generated from the process, and managed systematically.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.