A Study on the Productivity Analysis of Finishing Works on Super High-rise Mixed_use Building (초고층 주상복합 건축물 마감공사의 공종별 생산성 비교에 관한 연구)

  • Hong, Bo-Bae;Kim, Yong-Man;Kim, Ju-Hyung;Kim, Jae-Jun
    • KIEAE Journal
    • /
    • v.10 no.5
    • /
    • pp.165-170
    • /
    • 2010
  • Super high-rise mixed use buildings require a longer period for construction. Especially finishing work takes up about 40% of the whole construction period. Thus, finishing work is becoming an important factor in determining the construction period along with earth work and frame work. As the expected returns added by the reduction of the period and cost in constructing super high-rise mixed use buildings are huge, the expectations are now increasing for the possible gains. In this respect, as the period of finishing work is easier to be shortened than that of frame work, the efforts to acquire the technical knowledge to reduce the finishing work period are now being required. Accordingly, in this study, we aimed at suggesting the basic data for designing an economic plan for finishing-work procedure by analyzing the productivity of each work type of finishing work procedure on the basis of the execution and results of a construction method as a time-flexible finishing work plan. For this, we categorized the work types of finishing work procedure into each work unit and provided a work-system for each of them. Also, with case studies, we calculated the detailed amounts of the work-loads, required materials, productivity, and productivity index of the main work types of finishing work procedure and each of their separate work units as well as analyzed the relationship between the value results to suggest a better way to improve its productivity.

Analysing Decision Factors of Delivery System for Finishing Work in High-Rise Building Construction (초고층건물 마감공사의 발주방식 선정요소에 대한 연구)

  • Lee Jae-Il;Ahn Byung-Ju;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.345-348
    • /
    • 2003
  • The overall ability to manage the construction projects from an integrated perspective is important due to the emerging of high-rise building constructions. Potential hazardous of low productivity exist in the finishing work of high rise building a distinct example of the projects. Especially, the number of activities that should be controlled during finishing work is more than during skeleton work. Thus field managers should attract more attention to manage finish work activities. The low productivity of these activities can diminish that of skeleton work. Decision factors of the delivery system for finishing works in the high-rise building project is established by means of literature review and questionnaire survey and a basis to analyze the effects of the criteria to the deli very system is presented.

  • PDF

Optimum Layout Model of Lift Car for Improving Productivity in High-rise Building Exterior Finishing Work (마감공사 생산성 향상을 위한 리프트 카 최적배치 모델)

  • Lee, Dongmin;Lim, Hyunsu;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.171-172
    • /
    • 2013
  • An operation planning of lift car is crucial in tall building construction especially it's arrangement plans, because it is related with transportation distance of finishing materials affecting construction productivity. Since tall building construction, composed of complicating and huge plane have complex traffic lines of finishing materials, to determine the position of lift car empirically or intuitively has limits. Therefore this paper suggest an optimum layout model of lift car minimizing the transportation distance both at site-level and floor-level using Graph theory and Dijkstra algorithm.

  • PDF

A Study on Analysis and Improvement of the Process of Furniture Work for High-rise Residential Building (초고층주거건축의 가구공사 프로세스 분석 및 개선방안에 관한 연구)

  • Kim Hyun-Woo;Song Young-Woong;Choi Yoon-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.446-449
    • /
    • 2003
  • Recently, large residental buildings including high-rise apartment and a multi-business and commercial-residential building are appearing in the form of Korean construction work. According to this large-size trend a tenn and cost of construction works was largely increased. Therefore, studies of techniques construction management for successful project are lively being progressed. This study introduced Just-In-Time form and Lean Construction concept in order to establish management system of a house construction work taking up much portion on aspects of work scale and materials transportation in finishing works of high-rise residental building architecture. The process of house construction works will be analyzed with these two principles for productivity improvement and then the improvement plan will be suggested. This analysis and proposal can induce the flow of finishing works smoothly and contribute to success of project through saving of a tenn and cost of construction works.

  • PDF

DEVELOPMENT OF MATERIAL TRACKING SYSTEM USING WIRELESS TECHNOLOGY IN HIGH-RISE BUILDING

  • Jae-Goo Han;Min-Woo Lee;Soon-Wook Kwon;Moon-Young Cho
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1017-1021
    • /
    • 2005
  • There is a need for effective tracking and control of material loading and delivery time especially during the finishing-work phases to eliminate the need for lay-down space on the site. Hence, it is essential to monitor the relevant information regarding material procurement in construction sites, and it is also the key factor for successful site control and the adoption of the Just-in-Time concept for high-rise building construction. The purpose of this study is to test RFID's readability in order to develop a finishing material monitoring system through the application of RFID technology.

  • PDF

Development and Application of Unit Table Form using Euro Form for High-rise Building Construction (초고층 건축공사를 위한 유로-유닛 테이블폼 공법 개발 및 적용에 관한 연구)

  • Yang, Sung-Woo;Cho, Hun-Hee;Kang, Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.2
    • /
    • pp.45-52
    • /
    • 2008
  • In today's construction, there has been an increase in the construction of high-rise buildings due to the need to maximize land usage. Framework affects not only the entire construction duration and cost, but also subsequency construction activities such as electrical, mechanical, and finishing works. Especially, proper formwork is a influential factor of productivity in the framwork of reinforced concrete construction. To that reason, a table form of system form is more frequently used than conventional form. However, an initial cost of the table form is high and a reused table form needs for workers to repair damaged table forms. Therefore, the goal of this study is to introduce euro-unit table form. The results from the application of euro-unit table form to high-rise residentia building construction are as follows : (1) The cost of producing table form reduced by 16%, and (2) The time of producing table form was slumped by 35%, and (3) The labor force needed for form work declined 21%.

The analysis of defects types and patterns in high-rise residential buildings (초고층 주상복합 건물의 하자 발생 유형 및 분석 연구)

  • Seo, Jang-Woo;Kang, Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.2
    • /
    • pp.93-101
    • /
    • 2009
  • Recently, public interest in housing defects, such as construction errors, occupiers' complaints, faults in production, and so on, is increasing. In addition, the construction requirements of high-rise residential buildings have increased, due to the higher prices of urban areas, especially in metropolitan areas. While previous research has focused on the defects occurring in apartment housing complexes, research has not been carried out on the defects occurring in high-rise residential buildings. In this paper, the defects patterns and characteristics of high-rise residential buildings are examined and analyzed and a defect management plan is then suggested. In order to do this, we collected the defects data of high-rise residential buildings recorded by 2,299 of 2,327 occupants. The defect occurrence rate (DOR) in the residential area is 98.8%. The frequency rate of defect occurrence over the total defect occurrence since building completion is 63.28% during the first year, 24.63% (second year), 6.88% (third year), 2.27% (fourth year), and 2.53% (fifth year). The result of correlation analysis between work types showed that there is a relationship between the built-in furniture and electronics (F&E) and painting works, and the F&E and masonry works, such as marble finishing. We expect that this research will assist in the efforts to decrease the number of defects in high-rise buildings.

Process Planning for Finishing Works of High-rise Residential Buildings Project (고층 공동주택 마감공사의 공정계획 프로세스)

  • Baek, Tae-Yong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.11
    • /
    • pp.110-117
    • /
    • 2017
  • In the construction of high-rise residential buildings in which the finishing works are done repetitively in each housing unit, the construction period and cost can be reduced, while maintaining the quality, if the work process is properly managed in order for the resources to be input continuously. Time management methods such as the Bar Chart, CPM and LOB are not appropriate, due to the difficulties involved in the diagraming of repetitive works and applying them to the project. The Tact method also has difficulties in maintaining a constant work flow and needs significant effort and cooperation from the subcontractors to allocate the resources consistently. Partitioning, base works for finishing, floor mortar plastering and the final finishing work are done sequentially in residential buildings projects, and there are many repetitive activities which differ in terms of the work method, work area and productivity. If these repetitive activities are synchronized or converged toward the last work area, the goal of process management can be achieved effectively. Therefore, a process planning method for the finishing works of residential building projects is proposed, which takes into consideration elements, such as the sequential relation between the activities in each housing unit and classification of repetitive works in terms of their management method, work area and production rate, for the continuous input of resources into the housing units.

Winter to replace the hydraulic test and pneumatic test comparative analysis of study on the optimal pressure (동절기 수압시험을 대체하는 공기압시험의 적정압력 비교분석에 관한 연구)

  • Kwoun, Young-Hee;Hwang, Dong-Hwan;Kim, Tae-Gil;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.16 no.2
    • /
    • pp.211-216
    • /
    • 2014
  • Using a high-rise building water piping after hydrostatic test of the reliability of the leak to be completed if the pressure is maintained until the leak is not commercially available considered. Due to the nature of high-rise buildings and the construction period will take several years from the lower levels of use of the water supply and fire fighting water pipe construction is in progress, the order of which I do most of the first pipe to the construction and more than three years. So kind of riser pipe is complete, install the valve in the basement by installing an automatic pump to maintain a constant pressure after hydrostatic test and after each floor plumbing piping is complete, the progress of the hydrostatic test without undergoing a separate branch pipe the valve is opened automatically when the number of the pressing pressure of the structure. I kind of do and keep working pressure of pipe until the completion of the construction work to keep the damage to human error when it is intended to prepare. In winter, the frost protection and an alternative to drainage water pipe is damaged or deformed, even if unaware of the finishing work to the building, the use of the damage caused by a leak in a after construction of finish work to be expected. Alternative to reduce this damage if the pressure test without fear of freezing to help maintain long-term commercial pressures may be considered.

Proposal of a Classification System of Checklists for Safety Management of On-Site Workers in Modular Construction (사례분석을 통한 모듈러 건축의 현장 작업자 안전관리 체크리스트의 분류 체계 제안)

  • Jun, Younghun;Kim, Kyoontai;Jeon, Eunbi
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.120-130
    • /
    • 2021
  • Recently, the government is reinforcing safety management at construction sites to prevent safety accidents in construction works, and the safety management plan of workers is an important situation. Meanwhile, modular construction is expected to be gradually expanded to middle and high-rise buildings, but active measures to ensure worker safety are insufficient. This study is a preliminary study of the development of a checklist for preventive worker safety management. The purpose of this study is to derive a checklist classification system for the safety management of workers in the field of modular construction by preceding studies, case analysis, and expert advisory opinions. The classification system consists of large categories of factory manufacturing, transportation, and on-site construction, and the sub-system consists of six sub-classes: foundation work, frame work, modular frame installation work, finishing work, and facility work. Among them, the sub-classification of modular frame installation work consists of 12 unit works, centering on module lifting and assembly module work, which are the main construction processes. And the classification system reflects the three main management factors and contents for defined safety management. It is expected that the research results of this study can contribute to efficient safety management at the modular construction site.