초고층 주상복합 건축물 마감공사의 공종별 생산성 비교에 관한 연구 (A Study on the Productivity Analysis of Finishing Works on Super High-rise Mixed_use Building)

  • 홍보배;김용만;김주형;김재준
    • KIEAE Journal
    • /
    • 제10권5호
    • /
    • pp.165-170
    • /
    • 2010
  • Super high-rise mixed use buildings require a longer period for construction. Especially finishing work takes up about 40% of the whole construction period. Thus, finishing work is becoming an important factor in determining the construction period along with earth work and frame work. As the expected returns added by the reduction of the period and cost in constructing super high-rise mixed use buildings are huge, the expectations are now increasing for the possible gains. In this respect, as the period of finishing work is easier to be shortened than that of frame work, the efforts to acquire the technical knowledge to reduce the finishing work period are now being required. Accordingly, in this study, we aimed at suggesting the basic data for designing an economic plan for finishing-work procedure by analyzing the productivity of each work type of finishing work procedure on the basis of the execution and results of a construction method as a time-flexible finishing work plan. For this, we categorized the work types of finishing work procedure into each work unit and provided a work-system for each of them. Also, with case studies, we calculated the detailed amounts of the work-loads, required materials, productivity, and productivity index of the main work types of finishing work procedure and each of their separate work units as well as analyzed the relationship between the value results to suggest a better way to improve its productivity.

초고층건물 마감공사의 발주방식 선정요소에 대한 연구 (Analysing Decision Factors of Delivery System for Finishing Work in High-Rise Building Construction)

  • 이재일;안병주;김재준
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.345-348
    • /
    • 2003
  • 건축 프로젝트가 대형화 되어감에 따라 현장에서는 총체적인 관점에서 프로젝트를 관리할 수 있는 능력이 중요하게 인식되고 있다. 초고층건물공사는 그 규모로 인해 생산성 저하의 위험이 상존한다. 특히 관리대상 프로세스가 기타 공정에 비해 상대적으로 많은 마감공사는 생산성 유지 혹은 향상에 집중적인 관리가 요구된다. 즉, 골조공정의 생산성이 높더라도 마감공사의 생산성이 낮은 경우 전체 프로젝트의 생산성은 현저히 낮아지기 때문이다. 본 연구는 문헌고찰 및 인터뷰 둥을 통해서 초고층 건축공사의 마감공사 발주방식 선정요소를 도출하였으며, 이 요소들은 초고층건물 마감 공사의 발주방식에 어떻게 영향을 미치는가를 분석하기 위한 토대를 제공하고 있다.

  • PDF

마감공사 생산성 향상을 위한 리프트 카 최적배치 모델 (Optimum Layout Model of Lift Car for Improving Productivity in High-rise Building Exterior Finishing Work)

  • 이동민;임현수;김태훈;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.171-172
    • /
    • 2013
  • An operation planning of lift car is crucial in tall building construction especially it's arrangement plans, because it is related with transportation distance of finishing materials affecting construction productivity. Since tall building construction, composed of complicating and huge plane have complex traffic lines of finishing materials, to determine the position of lift car empirically or intuitively has limits. Therefore this paper suggest an optimum layout model of lift car minimizing the transportation distance both at site-level and floor-level using Graph theory and Dijkstra algorithm.

  • PDF

초고층주거건축의 가구공사 프로세스 분석 및 개선방안에 관한 연구 (A Study on Analysis and Improvement of the Process of Furniture Work for High-rise Residential Building)

  • 김현우;송영웅;최윤기
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.446-449
    • /
    • 2003
  • 우리나라의 최근의 건설공사의 형태를 보면 초고층 아파트, 대형 주상복합 건물 등 대형주거용 건축물들이 등장하고 입다. 이러한 건설공사의 대형차 추세에 따라 공사기간, 공사비용 등이 크게 증가하였다. 이에 공사기간 및 공사비용을 절약하고 프로젝트의 성공을 위한 건설관리 기법들의 연구가 활발히 진행되고 있다. 본 연구에서는 초고층 주거건축의 마감공사 중에서 공사규모, 자재의 양중 측면에서 많은 부분을 차지하고 있는 가구공사의 관리체계를 정립하기 위하여, 적시생산(Just-In-Time)방식과 린건설(Lean Construction)의 개념을 도입하였다. 생산성 향상을 위한 위의 두 가기 원리를 이용하여 가구공사의 프로세스를 분석하고 그에 따른 개선방안을 제시하고자 한다. 이러한 분석과 개선방안의 제시는 마감공사의 원활한 흐름을 유도할 수 있으며, 또한 공사기간 및 공사 비용을 절약함으로써 프로젝트의 성공에 기여할 수 있다.

  • PDF

DEVELOPMENT OF MATERIAL TRACKING SYSTEM USING WIRELESS TECHNOLOGY IN HIGH-RISE BUILDING

  • Jae-Goo Han;Min-Woo Lee;Soon-Wook Kwon;Moon-Young Cho
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1017-1021
    • /
    • 2005
  • There is a need for effective tracking and control of material loading and delivery time especially during the finishing-work phases to eliminate the need for lay-down space on the site. Hence, it is essential to monitor the relevant information regarding material procurement in construction sites, and it is also the key factor for successful site control and the adoption of the Just-in-Time concept for high-rise building construction. The purpose of this study is to test RFID's readability in order to develop a finishing material monitoring system through the application of RFID technology.

  • PDF

초고층 건축공사를 위한 유로-유닛 테이블폼 공법 개발 및 적용에 관한 연구 (Development and Application of Unit Table Form using Euro Form for High-rise Building Construction)

  • 양성우;조훈희;강경인
    • 한국건축시공학회지
    • /
    • 제8권2호
    • /
    • pp.45-52
    • /
    • 2008
  • In today's construction, there has been an increase in the construction of high-rise buildings due to the need to maximize land usage. Framework affects not only the entire construction duration and cost, but also subsequency construction activities such as electrical, mechanical, and finishing works. Especially, proper formwork is a influential factor of productivity in the framwork of reinforced concrete construction. To that reason, a table form of system form is more frequently used than conventional form. However, an initial cost of the table form is high and a reused table form needs for workers to repair damaged table forms. Therefore, the goal of this study is to introduce euro-unit table form. The results from the application of euro-unit table form to high-rise residentia building construction are as follows : (1) The cost of producing table form reduced by 16%, and (2) The time of producing table form was slumped by 35%, and (3) The labor force needed for form work declined 21%.

초고층 주상복합 건물의 하자 발생 유형 및 분석 연구 (The analysis of defects types and patterns in high-rise residential buildings)

  • 서장우;강경인
    • 한국건축시공학회지
    • /
    • 제9권2호
    • /
    • pp.93-101
    • /
    • 2009
  • Recently, public interest in housing defects, such as construction errors, occupiers' complaints, faults in production, and so on, is increasing. In addition, the construction requirements of high-rise residential buildings have increased, due to the higher prices of urban areas, especially in metropolitan areas. While previous research has focused on the defects occurring in apartment housing complexes, research has not been carried out on the defects occurring in high-rise residential buildings. In this paper, the defects patterns and characteristics of high-rise residential buildings are examined and analyzed and a defect management plan is then suggested. In order to do this, we collected the defects data of high-rise residential buildings recorded by 2,299 of 2,327 occupants. The defect occurrence rate (DOR) in the residential area is 98.8%. The frequency rate of defect occurrence over the total defect occurrence since building completion is 63.28% during the first year, 24.63% (second year), 6.88% (third year), 2.27% (fourth year), and 2.53% (fifth year). The result of correlation analysis between work types showed that there is a relationship between the built-in furniture and electronics (F&E) and painting works, and the F&E and masonry works, such as marble finishing. We expect that this research will assist in the efforts to decrease the number of defects in high-rise buildings.

고층 공동주택 마감공사의 공정계획 프로세스 (Process Planning for Finishing Works of High-rise Residential Buildings Project)

  • 백태용
    • 한국산학기술학회논문지
    • /
    • 제18권11호
    • /
    • pp.110-117
    • /
    • 2017
  • 다수의 고층 주거 건물을 건설하는 공동주택 프로젝트에서 마감 공종은 단위세대마다 반복적으로 시공되므로 자원이 연속적으로 투입되도록 공정관리가 이루어지면 품질을 확보하면서 공기를 단축하고 공사비를 절감할 수 있다. Bar Chart, CPM, LOB와 같은 공정관리 기법은 반복 작업에 대한 표현과 적용의 한계점으로 인하여 공동주택 마감공사에 사용하기에는 적합하지 않다. 또한 택트 기반 공정관리 기법은 반복 공종의 작업 흐름을 일정하게 유지하기 어려울 뿐만 아니라 지속적으로 필요한 자원을 할당하기 위해서는 상당한 노력과 전문 시공업체의 협조를 필요로 한다. 공동주택의 마감공사는 벽체조성공사, 마감바탕공사, 바닥미장공사, 최종마감공사 순으로 진행되고, 각 공사에는 작업 방법, 작업 공간, 자원 생산성 등과 관련하여 다양한 특성을 가지는 하위 개념의 반복 공종들이 존재한다. 이 반복 공종들의 작업이 동기화되거나 마지막 작업구역에서 수렴되도록 하면 공정관리의 목표가 유효하게 달성될 수 있다. 따라서 본 연구는 공동주택의 단위세대에서 시공되는 작업들의 순서 관계, 작업 유형 분류 및 관리 방법, 자원의 연속적인 투입을 위한 시공속도와 작업구역 등의 요소들을 고려하여 마감공사를 위한 공정 계획 프로세스를 제시하고자 한다.

동절기 수압시험을 대체하는 공기압시험의 적정압력 비교분석에 관한 연구 (Winter to replace the hydraulic test and pneumatic test comparative analysis of study on the optimal pressure)

  • 권영희;황동환;김태길;강경식
    • 대한안전경영과학회지
    • /
    • 제16권2호
    • /
    • pp.211-216
    • /
    • 2014
  • Using a high-rise building water piping after hydrostatic test of the reliability of the leak to be completed if the pressure is maintained until the leak is not commercially available considered. Due to the nature of high-rise buildings and the construction period will take several years from the lower levels of use of the water supply and fire fighting water pipe construction is in progress, the order of which I do most of the first pipe to the construction and more than three years. So kind of riser pipe is complete, install the valve in the basement by installing an automatic pump to maintain a constant pressure after hydrostatic test and after each floor plumbing piping is complete, the progress of the hydrostatic test without undergoing a separate branch pipe the valve is opened automatically when the number of the pressing pressure of the structure. I kind of do and keep working pressure of pipe until the completion of the construction work to keep the damage to human error when it is intended to prepare. In winter, the frost protection and an alternative to drainage water pipe is damaged or deformed, even if unaware of the finishing work to the building, the use of the damage caused by a leak in a after construction of finish work to be expected. Alternative to reduce this damage if the pressure test without fear of freezing to help maintain long-term commercial pressures may be considered.

사례분석을 통한 모듈러 건축의 현장 작업자 안전관리 체크리스트의 분류 체계 제안 (Proposal of a Classification System of Checklists for Safety Management of On-Site Workers in Modular Construction)

  • 전영훈;김균태;전은비
    • 한국건설관리학회논문집
    • /
    • 제22권6호
    • /
    • pp.120-130
    • /
    • 2021
  • 최근 정부는 건설재해 예방을 위하여 건설공사 안전관리를 강화하고 있으며, 예방적 차원의 작업자 안전관리 방안이 중요한 실정이다. 한편 모듈러 건축은 중고층 건축물 등으로 점차 확대 적용될 예정이나, 작업환경이 열악하고 안전관리가 미흡한 중소규모 건설현장이 많아 재해예방을 위한 안전관리가 미흡한 실정이다. 또한 국내 모듈러 건축의 안전관리 방안은 작업자의 안전사고에 영향을 미치나 시공오차, 하자 등 구조안전과 관련한 요소를 관리하는 품질관리에 집중되어 있어, 작업자의 안전보건을 관리하여 재해를 예방하는 작업자 안전관리는 부족한 실정이다. 따라서 본 논문에서는 국내 연구 개발된 사례들을 분석하고 전문가 자문을 통하여 도출된 모듈러 건축의 작업자 안전관리를 위한 체크리스트의 분류체계를 제안하였다. 분류체계는 공장제작, 운송, 현장시공을 대분류로 구성하였으며, 하위체계는 현장시공의 6가지의 중분류 중 모듈러 골조설치 공사의 세부작업인 양중작업과 조립작업을 중심으로, 12가지의 단위작업을 구분하였다. 그리고 안전관리를 위한 관리요소에 따른 단위작업별 작업내용을 정의하고 분류체계에 최종적으로 반영하였다. 본 연구의 결과가 모듈러 건축의 건설현장에서 효율적인 안전관리를 수행하는데 기여할 수 있기를 기대한다.