• Title/Summary/Keyword: Fabrication Factory

Search Result 47, Processing Time 0.025 seconds

Work Time Analysis of Rebar Fabrication Method in Beam Construction. (보 철근공사 조립공법별 작업시간분석)

  • Kim, Ju-Yong;Kim, Min-Ku;Kim, Young-Kil;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.8-9
    • /
    • 2019
  • The rebar work is a labor intensive construction work with a high labor cost ratio. It is difficult to manage the productivity, construction time, and safety of rebar work. The problem of productivity decreased in rebar construction is due to a lack of workers according to the aged workers. Partial prefabrication rebar can be an alternative solution to productivity decreased in rebar work. The characteristic of partial prefabrication method is that time consuming component such as stirrup of beam assemble in factory and others assemble in site. Therefore, in this study, the time required for each rebar assembly method is measured and analyzed to confirm the possibility of productivity improvement.

  • PDF

Evaluating shrinkage and mechanical performances of polypropylene hybrid fibers reinforced mortar

  • Bendjillali, Khadra;Bendjilali, Fatiha;Krobba, Benharzallah
    • Advances in materials Research
    • /
    • v.11 no.3
    • /
    • pp.211-224
    • /
    • 2022
  • The shrinkage and the mechanical properties of polypropylene hybrid fiber reinforced mortar PHFRM were investigated in this study. Mortars were prepared with limestone crushing sand, Portland cement and polypropylene hybrid fibers PHF. Two types of virgin fibers, having the same length (30 mm) were used for reinforcing test mortars, fibers in diameter of 0.45 mm, used by PLAST BROS factory of Bordj Bou Arreridj (Algeria) for the fabrication of brooms (for household cleaning) and fibers in diameter of 0.25 mm, available on the market, having multiple applications. In this investigation, it was aimed to study the total and autogenous shrinkage, the flexural and compressive strength of mortars based on hybrid fibers. As a result, PHF have negatively affected the mortar workability. However, shrinkage risk was reduced and coarser fibers (PF45) were most effective for reducing shrinkage risk. The mechanical performances and the ductility of PHFRM were also enhanced.

Evaluation of 2 Part Curtainwall Structural Silicone Sealant (커튼월용 2액형 구조용 실란트 혼합비별 물성 평가 연구)

  • Kim, Sung Hyun;Jung, Jin-young;Ahn, Myung-Su;Seo, YeonWon;Bae, Keesun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.78-80
    • /
    • 2014
  • Silicone structural glazing (SSG) is a method utilizing a silicone adhesive to attach glass, metal, or other panel material to the structure of a building. Windload and other impact loads on the facade are transferred from the glass or panel through the silicone structural sealant to the systems' framework. Silicone structural glazing systems are currently a very common method of glazing throughout the world. Locally, structural silicone glazing has become very common to achieve aesthetically pleasing and high utilization of small land for both residential and commercial building. Although structural silicone glazing has been utilized for approximately thirty years in Korea, the understanding of its technology was low and limited. Consequently, Korean projects experienced many quality issues during assembly and construction, even in very recently finished buildings. Adhesion loss and water infiltration occurred on more than one project, and the time and cost to repair these issues were substantial. In general, there are two kinds of structural silicones depending on fabrication methods. 1part structural silicone is for site glazing system and 2part structural silicone is for unitized factory glazing system. In this paper, 2part structural silicone which is very common for factory fabricating curtainwall systems was evaluated with regards to various mixing ratio. Since the structural performance of 2part sealant can be affected by mixing ratios, some extra ranges of recommended mixing ratio were evaluated to see any performance differences. Besides on cure profile, comparative evaluations for mechanical properties and adhesion develop on common building substrates were conducted.

  • PDF

Productivity and Economic Analysis of Sandwich Panel Construction Work by Shop Fabrication (공장가공에 따른 샌드위치 패널공사의 생산성 및 경제성 분석)

  • Cho, Dong-Ryul;Son, Jae-Ho;Lee, Seung-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.113-122
    • /
    • 2009
  • The domestic construction market started to expand steadily since 1970s. The building market which utilizes a sandwich panel with advantages of economical construction expenses and convenient construction has grown rapidly in recent years. However, the companies which specialize in constructing sandwich panels are relatively small or medium size, compared with other construction companies. As a result, studies on the improvement of productivity have not been conducted sufficiently. In this study, the construction sites of sandwich panel are investigated, and the work processes by each team are analyzed. Additionally, the productivity and the construction cost of each work group are analyzed by constructing a model using the Web-Cyclone. It analyzed sensitivities about change of productivity and work costs following in processing place of the panel which is one of the productivity effect factors, so it assayed the optimized productivity by each work group and work costs. Analysis showed that 30% of productivity has improved compared with the factory processing work group, and analysis of work costs showed that about 15% of work costs was increased. Also sensitivity analysis of opening ratio showed that the work costs optimization will be accomplished when about 20% of opening was processed from the factory.

Development of Time-Cost Trade-Off Algorithm for JIT System of Prefabricated Girder Bridges (Nodular GIrder) (프리팹 교량 거더 (노듈러 거더)의 적시 시공을 위한 공기-비용 알고리즘 개발)

  • Kim, Dae-Young;Chung, Taewon;Kim, Rang-Gyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.3
    • /
    • pp.12-19
    • /
    • 2023
  • In the case of the construction industry, the relationship between process and cost should be appropriately distributed so that the finished product can be delivered at the minimum fee within the construction period. At that time, it should be considered the size of the bridge, the construction method, the environment and production capacity of the factory, and the transport distance. However, due to various reasons that occur during the construction period, problems such as construction delay, construction cost increase, and quality and reliability degradation occur. Therefore, a systematic and scientific construction technique and process management technology are needed to break away from the conventional method. The prefab(Pre-Fabrication) is a representative OSC (Off-Site Construction) method manufactured in a factory and constructed onsite. This study develops a resource and process plan optimization system for the process management of the Nodular girder, a prefab bridge girder. A simulation algorithm develops to automatically test various variables in the personnel equipment mobilization plan to derive the optimal value. And, the algorithm was applied to the Paju-Pocheon Expressway Construction (Section 3) Dohwa 4 Bridge under construction, and the results compare. Based on construction work standard product calculation, actual input manpower, equipment type, and quantity were applied to the Activity Card, and the amount of work by quantity counting, resource planning, and resource requirements was reflected. In the future, we plan to improve the accuracy of the program by applying forecasting techniques including various field data.

The Study on the Developing Process of BIM Modeling for Urban-life-housing Based on Unit Modular (유닛모듈러 기반 도시형 생활주택의 BIM 모델링 프로세스 개발 연구)

  • Lee, Chang-Jae;Lim, Seok-Ho
    • KIEAE Journal
    • /
    • v.12 no.6
    • /
    • pp.77-84
    • /
    • 2012
  • The current architectural design of unit modular has been based on 2D of CAD program, so unit modular character which needs unit information management, as a dried-member system, has no effect on design process. The purpose of this study is We have developed a suitable BIM design process, according to various works of construction, then tried to contribute to supply and activation of the urban-life-housing based on unit modular. The BIM modeling process based on unit modular has been in order of unit combination with preparing manual classification, and, it has been constructed, at construction site, from housing foundation to roof finish by Bottom-up method. At a manufacturing factory, it has been produced in order of 1) grouping materials and parts, 2) fabricating unit boxes, and 3) interference examination of unit boxes, and each order has been classified as housing structure, architecture, plumbing process separately. At a construction site, the fabrication has been done in order of, like as a real housing construction scenario, 1) RC foundation work 2) unit module job-site-fabrication work, 3) roof truss work, 4) plumbing and HVAC work, and 5) housing interior finish work. After modeling process, the interference examination on each work of construction has finally completed modeling. The Unit modular utilizing BIM modeling can make easy housing maintenance through systematic control with preparing manual of unit module information, and securing accurate and speedy construction information. And it will promote design credibility and create maximum effect of unit modular construction method, such as construction period reduction and upgrade of construction quality, etc., through the computer simulation as real as construction environment in cyber space, and with the interfering examination.

A Study on Outsourcing Application of M.E.P. System for Manufacturing Process Improvement of the Modular Construction Method (모듈러건축 공법의 공장제작과정 개선을 위한 M.E.P.시스템 외주제작 적용에 관한 연구)

  • Choi, Jun-Sok;Lee, Jae-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.3
    • /
    • pp.277-283
    • /
    • 2018
  • This study is conducted to improve the manufacturing process of the modular construction method, which is a pre-fabricated construction method recognized for its advantage on the shortening of construction time. This study first identified the factors that result in shortening of pre-fabrication processes in the current module-processing factory. In addition, those identified factors were further considered for installing the M.E.P. system that is being outsourced on the main module in the production line. A manufacturing process of the construction modules, which considers installation of a M.E.P. system most suitable for shortening the time on the outsourcing of modular construction, is introduced throughout the research. Furthermore, this study suggests the factors in need of improvement during design phase of modular construction and improvement measures to consider the quality of unit modules by focusing on the module parts that are most exposed to defects.

Development of Charge Indicator Inspection System for Plug-in Hybrid Electric Vehicle (PHEV용 Charge Indicator 시험기 개발)

  • Kim, Jin Young;Kang, Joonhee
    • Journal of Sensor Science and Technology
    • /
    • v.25 no.2
    • /
    • pp.155-159
    • /
    • 2016
  • In this work, we have developed a test system to examine whether the charge indicator of the plug-in hybrid electric vehicle (PHEV) works properly or not. In PHEV, the driver should charge the necessary electricity by plugging in manually and be able to know the charging status through the charge indicator conveniently located for the charging individual. Our system used the CAN bus to transmit the same commands from ECU to the indicator to test the proper operation of the indicator lights. It measured the electric current values during operation and analyzed to determine the quality of the indicators. The inspection items included the proper packaging, the electrical shorts, the LED lighting during charging, the LED lighting for charging failure, and the LED lighting when errors occur. We developed the system for the operators in the factory allowing them to approve the test results at the site. We developed the hardware, the control software, and the software to store the test results and the history of the products in the database. Serial numbers were given to the good quality products and the bar code labels were printed to trace the products afterwards. Through this work, we developed a system to inspect the electric parts in real time upon fabrication. We are planning to further improve our system to inspect the brightness of the indicator by adding the vision inspection in future.

Object oriented simulation in a CIM environment

  • 김종수
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1991.10a
    • /
    • pp.67-76
    • /
    • 1991
  • For several years, graduate students and faculty of the Engineering Systems Research Center at U.C., Berkeley have been studying new methods of planning and scheduling in a computer integrated manufacturing environment, with particular emphasis on large scale integrated circuit fabrication. One part of this work, focusing on short interval scheduling, uses simulation models as a primary research tool. We have built two versions of the same basic model (programmed in C) to study two different problems (one deals with machine down time and the other with setup times). These have proven to be efficient for studying particular problems, but are difficult and time consuming to modify. We are convinced that our research will be more effective: (1) if it were easier to build special purpose models tailored to the research question at hand; and (2) if we had better interfaces to graphics output. Commercially available factory simulators are inadequate for this research for a variety of reasons. Existing packages such as SIMKIT, SLAM, SIMAN and EXCELL have their own weaknesses. Typically, they are hard to develop and to modify. They do not allow for adding new dispatching decisions or release decision. Also, it is hard to add more machines to existing environment or change the route the product flows. For these various reasons, we had developed a new simulation package having flexibility and modularity. In this paper, based on experiences gained in the application of object oriented programming, we discuss unique features of the simulator developed in OOPS and ways to take advantage of features in developing and using manufacturing simulation software written in the OOPS

  • PDF

A Milestone Generation Algorithm for Efficient Control of FAB Process in a Semiconductor Factory (반도체 FAB 공정의 효율적인 통제를 위한 생산 기준점 산출 알고리듬)

  • Baek, Jong-Kwan;Baek, Jun-Geol;Kim, Sung-Shick
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.28 no.4
    • /
    • pp.415-424
    • /
    • 2002
  • Semiconductor manufacturing has been emerged as a highly competitive but profitable business. Accordingly it becomes very important for semiconductor manufacturing companies to meet customer demands at the right time, in order to keep the leading edge in the world market. However, due-date oriented production is very difficult task because of the complex job flows with highly resource conflicts in fabrication shop called FAB. Due to its cyclic manufacturing feature of products, to be completed, a semiconductor product is processed repeatedly as many times as the number of the product manufacturing cycles in FAB, and FAB processes of individual manufacturing cycles are composed with similar but not identical unit processes. In this paper, we propose a production scheduling and control scheme that is designed specifically for semiconductor scheduling environment (FAB). The proposed scheme consists of three modules: simulation module, cycle due-date estimation module, and dispatching module. The fundamental idea of the scheduler is to introduce the due-date for each cycle of job, with which the complex job flows in FAB can be controlled through a simple scheduling rule such as the minimum slack rule, such that the customer due-dates are maximally satisfied. Through detailed simulation, the performance of a cycle due-date based scheduler has been verified.