1 |
Lee DH, Ock JH. A study on the application of the in-fill construction method to high-rise unit modular buildings. Journal of the Architectural Institute of Korea Structure & Construction. 2014 Mar;30(3):105-14.
DOI
|
2 |
Lee CJ, Wang WC, Lee WH, Lim SH. Study on modular construction of economic analysis. Journal of the Architectural Institute of Korea. 2012 Oct;32(2):99-100.
|
3 |
Yu M, Oh JW, Lee MH, Yu YD, Park TK. A Study on analyzing the duration of modular construction method. Journal of the Regional Association of Architectural Institute of Korea Structure & Construction. 2005 Oct;25(1):201-4.
|
4 |
Jang GS, Lee CJ, Lim SH. Research on manufacture process of modular construction. Journal of the Architectural Institute of Korea. 2012 Oct;32(2):125-6.
|
5 |
Lee KB, Kim KR, Shin DW, Cha HS. A Proposal for optimizing unit modular system process to improve efficiency in off-site manufacture, transportation and on-site installation. Korea Journal of Construction Engineering and Management. 2011 Nov;12(6):14-21.
DOI
|
6 |
Korea Institute of Civil Engineering and Building Technology. First year annual report of Technical Development of Modular Construction in Mid-high Rise Building and Higher Productivity. Goyang(Korea): Korea Institute of Civil Engineering and Building Technology; 2015 Feb 23; 293 p. Report No.: 14RERPB082884-01.
|
7 |
JOINTOP CO..LTD. Connection part for water supply Non welded joint [Internet]. Korea: JOINTOP CO..LTD; 2011. Avaliable from: http://www.jointop.co.kr/Board/html/tech_opr.asp.
|