Among large developmental projects, those of the government and public institutions with the total budget of more than 50billion wons can be executed only when the feasibility of the project has been testified through the procedure of preliminary feasibility study. Multi-purpose dams are public structures that can supply water, produce electricity, and control flood, they belong to large national projects that require legal evaluation procedures such as preliminary feasibility study and environmental impact assessment(EIA). The index that should be considered to be important in dam plan is the migration of residents in submerged district. The importance in the preliminary feasibility study is 4.93 points(98.6 in the scale of 100 at maximum). Among the 12 assessment elements of the policy and economy in the preliminary feasibility study, the element of environment assessment is turned out to be 4.68 points in the assessment importance (93.5 in the scale of 100 at maximum), which is the second in the total ranking and the first in the field of policy, indicating that the element is very important in dam construction planning.
The solid waste incineration facilities which cause environmental pollution. And those are some kind of loathing facilities for residents who do not want it. This problem could be solved by location feasibility study. The purpose of location feasibility study was to determine one site out of three candidate sites. This study which was done by the law, environmental and economic factor was considered for optimum site selection. Comparative evaluation among the candidate sites was done by ordinal scale and thus the optimum site was selected.
Korean Journal of Construction Engineering and Management
/
v.8
no.3
/
pp.76-86
/
2007
Construction development work invents profit as those finalize object, and a make or break success of project depends on correct analysis and forecast business feasibility at project early. Business feasibility study would be decision-making under precarious situation because is connoting uncertainty that is future. estimate at present visual point essentially. Under uncertainty, a decision-making method is based on probability theory of statistics, but business feasibility study had applied with not feasibility study by probabilistic decision method but it by determinism derision method so far. Therefore in this study doing decision-making by a probability theory method for successful project at early business feasibility study, it present a probabilistic study method that use simulation that can supply a little more correct and reliable data to decision-maker As result, a probabilistic study method is more suitable than deterministic study method as technique for a financial feasibility study of construction development work. Making good use of this probabilistic study method at important business or careful decision-making, because efficient Judgment that is based accuracy and authoritativeness may become available.
Journal of Korean Library and Information Science Society
/
v.48
no.2
/
pp.99-119
/
2017
As a part of feasibility study of constructing Geumsaem library, the purpose of this study is to examine the result of economic feasibility analysis on constructing the library. In order to achieve the purpose, we evaluated policy relevance, investigated people's demand for constructing the library, and examined the result of economic feasibility analysis. As the tools of economical efficiency analysis, we used the techniques like cost-benefit ratio, net present value and internal rate of return to analyse the economic feasibility, and we estimated the amount of benefit by contingent valuation method. As the result of this study, cost-benefit ratio for constructing Geumsaem library was turned out as 1.28, and we could get an assessment of positive economic feasibility about constructing the library.
Journal of The Korea Institute of Healthcare Architecture
/
v.30
no.1
/
pp.37-44
/
2024
Purpose: The planning of medical facilities involves formulating a comprehensive medical basic plan, translating it into spatial dimensions through a space program. Feasibility assessment often relies on empirical methods like floor area per bed. However, with the shift towards specialized medical concepts, proportional scaling to bed numbers is challenging. This study proposes scale planning improvements during the feasibility assessment stage for comprehensive hospitals, analyzing cases using area determination factors and standard areas based on medical resources. Methods: The Korean Development Institute's Public Investment Management Center (KDI) identified issues in the scale determination of medical facilities in the Preliminary Feasibility Study Guidelines and investigated alternative approaches for determining the scale of a case that passed the preliminary feasibility study in 2019. The study assessed the feasibility of applying individual factors to determine not only the number of beds but also the scale at the sector and department levels. Additionally, a statistical analysis was conducted to examine the correlation between the total number of beds and various area determination factors. Results: Results suggest a strong correlation between total beds and major equipment needs, but in hospitals with <500 beds, this correlation weakens. Ward section scale is better calculated per ward type, not just total beds. Outpatient department scale depends on specialists, influencing treatment room numbers. Medical personnel play a crucial role in determining the scale of sections like rehabilitation therapy rooms, operating rooms, dialysis rooms, and overall facility scale.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2006.11a
/
pp.462-466
/
2006
The startingpoint of successful buildingproduction process is the feasibility study of the project. If the feasibility study is poor which is affected in direct production processes such as designing and engineering, it incurs a great unrecoverable loss to the company. The governmentinstitutionalized the feasibility study for projects that budgets over 50billion won in an effort to ensure competitiveness of the construction industry after IMF; however, the system and effort to created systematic studies or guidance preparation for private construction development projects are lacking in great deal. Therefore, the objective of this study is to establish the analysis factors of feasibility study and evaluation standard by systematic analysis in consideration of the changes of various variables and mutual relationships using system dynamics technique for office buildings among commercial buildings.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.577-580
/
2003
The purpose of this study was to make a database model for financial feasibility study of buildings offered for sale which is helpful for improvement of business ability in construction and confidence of a project from a related participant. At first, we studied several thesis and met some professionalist which work for construction and did a first survey for examining latest situation of a feasibility study in construction. As a result, even though feasibility study is important, factors for information management wasn't systemized. So we did a second survey for fixing Factors of the database model. The database model was composed of the factors that we got from the second survey. ER(Entity-Relationship) analysis was used to making it. We expect thar we can get more reasonable information to study financial feasibility study and can diminish risks of project through the database model. So the result of this study was to make a database model for more reasonable financial feasibility study of building offered for sale.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.379-384
/
2002
A road construction project needs a large scale of investment and tine. In this study, we will review some elements of feasibility analysis and derive points of the existing analyses. And we make some suggestions to improve the existing methods. We propose a 'A Feasibility Information System' for road construction projects. The system will be useful to make a feasibility study for road construction project and help us to predict risks in process of the projects.
Feasibility which is complimented before Social Overhead Capital Project and National Policy Project is analyzed by economic and political benefits. The projects will be performed if the benefits are bigger than the project cost. In this study, feasibility was examined at various viewpoints on sewer rehabilitation projects implemented with private capitals. To achieve the feasibility analysis, the B/C (Benefit/Cost Ratio), IRR (Internal Rate of Return) and the returns ratio of the Build Transfer Lease project implemented in 2007 at W city were estimated. At the same time, the correlation with B/C and benefit sensitivity of concessionary rate fluctuation were analyzed to evaluate the efficiency and feasibility of the seven sewer rehabilitation projects promoted by a local autonomous entity.
This study sought to contribute to the revitalization of local economy by developing a natural recreation forest, which is the base of ecotourism recreation, through utilizing forest resources and the natural environment of Gwangju-si. The study conducted a feasibility assessment through on-site surveys such as the suitability of the candidate sites, location analysis, and possibility of damage to the forest, before developing recreation forest sites in Gwangju-si and, based on the result, selected appropriate subject sites. The candidates for this study were 5 forest sites such as one site in the Mokheon-dong area, two in the Docheok-myeon area, and one in the Toechon-myeon area. For this study, the current status of the natural recreation forest was surveyed, its feasibility index and assessment process were investigated, and the local status and related regulations of Gyeonggi-do and Gwangju-si were reviewed. The final subject sites were selected after feasibility assessment utilizing assessment index in order to evaluate the candidate sites. The feasibility assessment was conducted after three separate on-site surveys for each candidate site between October 2018 and January 2019 utilizing "The Feasibility Assessment Criteria for Natural Recreation Forest (Notification 2018-71)" of the Korean Forest Service. The items instrumental to the feasibility assessment were classified into landscape, location, water system, induction of recreation, and development condition; the assessment was made after redefining each item into detailed items. Through this process, the Usan-ri area was selected as the final site for developing natural recreation forest, having obtained more than 100 points according to "The Feasibility Assessment Criteria for Natural Recreation Forest" of the Korean Forest Service. In order to develop natural recreation forest in the Usan-ri area in the future, further discussion is necessary with the relevant departments in consideration of the degree of ecological zoning map.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.