• Title/Summary/Keyword: Execution time

Search Result 1,941, Processing Time 0.026 seconds

A Digital Twin Software Development Framework based on Computing Load Estimation DNN Model (컴퓨팅 부하 예측 DNN 모델 기반 디지털 트윈 소프트웨어 개발 프레임워크)

  • Kim, Dongyeon;Yun, Seongjin;Kim, Won-Tae
    • Journal of Broadcast Engineering
    • /
    • v.26 no.4
    • /
    • pp.368-376
    • /
    • 2021
  • Artificial intelligence clouds help to efficiently develop the autonomous things integrating artificial intelligence technologies and control technologies by sharing the learned models and providing the execution environments. The existing autonomous things development technologies only take into account for the accuracy of artificial intelligence models at the cost of the increment of the complexity of the models including the raise up of the number of the hidden layers and the kernels, and they consequently require a large amount of computation. Since resource-constrained computing environments, could not provide sufficient computing resources for the complex models, they make the autonomous things violate time criticality. In this paper, we propose a digital twin software development framework that selects artificial intelligence models optimized for the computing environments. The proposed framework uses a load estimation DNN model to select the optimal model for the specific computing environments by predicting the load of the artificial intelligence models with digital twin data so that the proposed framework develops the control software. The proposed load estimation DNN model shows up to 20% of error rate compared to the formula-based load estimation scheme by means of the representative CNN models based experiments.

Dimensionality Reduction of Feature Set for API Call based Android Malware Classification

  • Hwang, Hee-Jin;Lee, Soojin
    • Journal of the Korea Society of Computer and Information
    • /
    • v.26 no.11
    • /
    • pp.41-49
    • /
    • 2021
  • All application programs, including malware, call the Application Programming Interface (API) upon execution. Recently, using those characteristics, attempts to detect and classify malware based on API Call information have been actively studied. However, datasets containing API Call information require a large amount of computational cost and processing time. In addition, information that does not significantly affect the classification of malware may affect the classification accuracy of the learning model. Therefore, in this paper, we propose a method of extracting a essential feature set after reducing the dimensionality of API Call information by applying various feature selection methods. We used CICAndMal2020, a recently announced Android malware dataset, for the experiment. After extracting the essential feature set through various feature selection methods, Android malware classification was conducted using CNN (Convolutional Neural Network) and the results were analyzed. The results showed that the selected feature set or weight priority varies according to the feature selection methods. And, in the case of binary classification, malware was classified with 97% accuracy even if the feature set was reduced to 15% of the total size. In the case of multiclass classification, an average accuracy of 83% was achieved while reducing the feature set to 8% of the total size.

A Study on the Evolution of EU Regional Policies: Focusing on the Reform of Structural Fund (유럽연합(EU) 지역정책의 발전에 관한 일고(一考): 구조기금 개혁을 중심으로)

  • Jeong, Hong-Yul
    • International Area Studies Review
    • /
    • v.15 no.2
    • /
    • pp.351-381
    • /
    • 2011
  • When EU was formed in the late 1950s, the income gap or economic development between member nations was similar so that the interest in execution of regional policies at the level of union was relatively small, with just Italy showing some interest relatively. In 1975, however, ERDF was founded, and nations such as Spain or Portugal that were falling behind in economic development compared to existing member nations joined EU, and the regional policy of the union gradually gained attention. Accordingly, EU gradually increased the budget size for regional policies so that through 1980s and 1990s, the budget size grew over 4 times. In 2004 and 2007, 12 Central-Eastern European nations with great gaps in income level with existing member countries joined EU all at once, so that the resolution of regional inequality among member nations arose as an important assignment in the development of the community. Accordingly, EU has modified the overall goals and basis of regional policies to deal with this matter. From such perspectives, this report examined the development process of regional policies executed by EU for the last 50 years. In the conclusion parts, the issues that appeared in the process of executing EU's regional policies were also examined at the same time.

A Study on the Compositions and Applications of Video Solution for Small-sized Theater Performance:Focused on the Musical (소극장 공연에 적합한 영상 솔루션 구성과 활용방안 연구 : 뮤지컬 <트레이스 유(2018)>를 중심으로)

  • Kim, Kyu-Jong
    • The Journal of the Korea Contents Association
    • /
    • v.19 no.8
    • /
    • pp.359-369
    • /
    • 2019
  • This research suggests video solutions and efficient implementations for low-budget performances. This study adopts Millumin as a mapping server, which reflects the character of small theatres with a lower budget that doesn't use more than four projectors in a show. By comparing pros and cons of media servers, the study discovers how to employ an appropriate server as well as to participate in a pre-video production stage, which increases the artistry of directing and reduces unnecessary graphics. Meanwhile, with the participation of an interpretive programmer, this study suggests a way to manage the rehearsal time and to increase the artistry of directing. In addition, this study analyses the relationship between the video's visual motive source in the story's development, crisis, climax, twist and the provided narrative based on "Trace U the musical (2018)", by this analyzation, the relationship between storytelling and the video is fully shown. A visual motive is related to the action of actors, the movement of dancers, the music, the lyrics and the lines. Furthermore, the provided narrative confirms that the existence of an actual relationship with the turning point of the plots, characters' emotion, suggestions of sub-plot and the twists of own story. In conclusion, it implies a video of small theatres can not be separated from the probability of the narrative.sh an efficient ad execution strategy that reflected the characteristics of mobile devices.

The Establishment of the scaffolding type and the execution on experimental instruction (비계설정 유형 선정 및 이에 근거한 수업 실행과 분석)

  • Byun, Won Il;Hwang, Hye Jeang
    • Communications of Mathematical Education
    • /
    • v.32 no.4
    • /
    • pp.495-517
    • /
    • 2018
  • This paper is based on the effects of Zone of Proximal Development and scaffolding theory of social constructivist, Russian psychologist Vygotsky. He insisted that a social interaction play a fundamental role in the development of cognition. This study is to examine the efficient of the scaffolding types in Math class. The ZPD is the distance between a student's ability to perform a task under adult guidances or with peer collaboration and the student's ability solving the problem independently. To conduct the research was grouped into an experimental first grader five students in H high school in Y county. After class, students were questioned through Semi-structured interviews. The results of this study are below. First, Students were satisfied with the class mixed micro-scaffolding types and Macro-scaffolding types and improved their math thinking ability and the ways of solving problems. Second, The results of the class showed that students' ability to perform a task was transferred to the higher level through the help of a teacher or peers. Students could have more time to listen to peers' opinions and to say their own thoughts freely than they were under the lecture method instruction. Third, Students were interested in math through the experimental class. That's because the appropriate help of the scaffolding type, a cooperate study, relative with real life, using an engineering tools. They made a change of perception.

A Preliminary Study on Energy Consumption Analysis in Storage Space for Exhibition Facility by using Absorption Material (조습재 사용에 따른 전시시설 수장고의 에너지 사용량 분석에 대한 기초연구)

  • Kim, Jinhwan;Hong, Taehoon;Jeong, Kwangbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.53-59
    • /
    • 2019
  • As solve the shortage problems of storage space for exhibition facilities, the South Korean government is establishing plans to expand storage space for exhibition facilities. From a medium- to long-term perspective, an energy-efficient storage space for exhibition facility is needed to implement efficient state budget execution and achieve national greenhouse gas reduction goals. In this regard, this study analyzed the energy consumption of storage space for exhibition facilities according to the use of absorption materials. To this end, a case study was conducted on 12 storage spaces for exhibition facilities in South Korea. Compared to the storage space using the absorption material, the storage space without using the absorption material showed an increase in HVAC system operation time by 47.50% during summer periods and 58.85% in non-summer periods. In particular, the analysis found that in the case of storage for 'H' exhibition facility, the energy cost was reduced by 2,721,700 won/year after remodeling work using the absorption material. It is expected that the findings of this study can help the government and the person in charge from construction companies to construct energy-efficient storage space room for exhibition facilities.

The Problems and its Improvement of Sea Area Utilization Consultation and Impact Assessment for Projects Related to Marine Environment Restoration (해양환경복원관련 사업에 따른 해역이용협의·영향평가의 문제점 및 개선방안)

  • Yi, Yong Min;Jun, Eun Ju;Lee, Dae In;Kim, Gui Young
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.25 no.1
    • /
    • pp.34-44
    • /
    • 2019
  • Marine activities are becoming more diverse and extensive due to recent social developments, exceeding the environmental capacity of the marine ecosystem. The resilience, resistance, and constancy of marine ecosystems are being damaged or degraded. This prevents the ecosystem from functioning properly, leading to a decline in ecosystem services and value. As a means of returning the damaged ecosystem to health, more and more people are interested in restoration. At a time when restoration projects are gradually expanding, various problems that may arise when implementing the Sea Area Utilization Consultation and Impact Assessment for restoration projects need to be checked, in addition to confirming the direction to be pursued. Therefore, in this study terms related to restoration from research papers and reports were summarized, and the status of the Sea Area Utilization Consultation related to restoration projects and the status of the restoration project were reviewed. In addition, problems with Sea Area Utilization Consultations were considered through a case study to ensure the successful execution of restoration projects. Based on this, we intend to present improvement measures for Sea Area Utilization Consultations and Impact Assessments for restoration projects. This will provide effective information for future policies and plans.

CM at Risk Case Study on Guaranteed Maximum Price Contract - Focused on Cases for USA - (책임형 CM 발주방식의 최대공사비보증계약 사례연구 - 미국 공공발주 프로젝트 사례 중심 -)

  • Jeong, Jinhak;Han, Jonghoon;Lee, Joosung;Ahn, Yonghan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.22-30
    • /
    • 2019
  • The purpose of this study is to derive basic data of the Guaranteed Maximum Price(GMP) process and to present specimens that can be used at the time of execution of CM at Risk project in South Korea. CM at Risk project is issued in South Korea, but the actual data is lack. On the other hand, CM at Risk project is universalized and the market of the CM at Risk is steadily growing. Because of that, in this study, The United States cases was selected as a sample. GMP consists of CM's fee, CM contingency, project direct cost, project indirect cost, allowance. GMP negotiations are performed before the end of design completion, and after 3 rounds of estimation comparison, preliminary GMP is confirmed. GMP can be multiple contract and it is useful for Procurement of long lead materials and early construction. If the actual cost is lower than expected GMP, sharing of the saving is an option since the conflict of interests between the client and the contractor can occur.

Dredging Material Application Lightweight Foamed Soil Full Scale Test Bed Verification (준설토 활용 경량기포혼합토 실규모 현장 실증 연구)

  • Kim, Dong-Chule;Yea, Gue-Guwen;Kim, Hong-Yeon;Kim, Sun-Bin;Choi, Han-Lim
    • Journal of Coastal Disaster Prevention
    • /
    • v.5 no.4
    • /
    • pp.163-172
    • /
    • 2018
  • To propose the design technique and the execution manual of the LWFS(Lightweight Foamed Soil) method using dredged soil, the operation system for the test-bed integrated management, and to establish an amendment for the domestic quantity per unit and specifications, and a strategy for its internationalization. In order to utilize the dredged soil from the coastal area as a construction material, we constructed the embankment with LWFS on soft ground and monitored its behavior. As a result, it can be expected that the use of LWFS as an embankment material on the soft ground can improve the economic efficiency by reducing the depth and period of soil improvement as well as the uses of nearby dredged soil. To verify the utilization of the dredged soil as a material for light-weighted roadbed, soft ground and foundation ground, and surface processing, perform an experimental construction for practical structures and analyze the behavior. It is expected to be able to improve the soft ground with dredged soil and develop technique codes and manuals of the dredged soil reclamation by constructing a test-bed in the same size of the fields, and establish the criteria and manual of effective dredged soil reclamation for practical use. The application technology of the dredged soil reclamation during harbor constructions and dredged soil reclamation constructions can be reflected during the working design stage. By using the materials immediately that occur from the reclamation during harbor and background land developments, the development time will decrease and an increase of economic feasibility will happen. It is expected to be able to apply the improved soil at dredged soil reclamation, harbor and shore protection construction, dredged soil purification projects etc. Future-work for develop the design criteria and guideline for the technology of field application of dredged soil reclamation is that review the proposed test-bed sites, consult with the institutions relevant with the test-bed, establish the space planning of the test-bed, licensing from the institutions relevant with the test-bed, select a test-bed for the dredged soil disposal area.

Development of Risk Evaluation Checklist for In-Situ Production of Precast Concrete Members (기성콘크리트 부재의 현장생산 리스크 평가를 위한 체크리스트 개발)

  • Lim, Jeeyoung;Jeong, Hee Woong;Kim, Dae Young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.5
    • /
    • pp.445-457
    • /
    • 2021
  • In previous studies, it was confirmed that through the in-situ production of precast concrete members, costs could be reduced by 14.5-39.4% compared to in-plant production. In particular, it was confirmed that the factory owner did not make a contract if it did not earn more than 20% of the production cost. If precast concrete members are produced in-situ under the same conditions, the quality equivalent to that of factory production can be secured. As it is advantageous in terms of cost and quality, precast concrete members must be produced in-situ. However, it is difficult to produce all quantities in-situ due to time and various other constraints. This is because in-situ production is avoided due to anticipated risks during the project management process. However, if the risk factors are analyzed before performing in-situ production of precast concrete members, it will increase the opportunity for in-situ production. Therefore, this study develops a checklist for evaluating the risk of in-situ production of precast concrete members. By applying the checklist to one case site, it was verified that risk factors can be evaluated easily and quickly. As a result, it was analyzed that sites with a high building coverage ratio are classified as high-risk sites because it is difficult to secure usable area for production and storage. The developed checklist efficiently evaluates the risk factors of in-site production, and makes it possible for the operator to determine the risk factors, which can change frequently during project execution, and respond according to the situation.