Development of Risk Evaluation Checklist for In-Situ Production of Precast Concrete Members  

Lim, Jeeyoung (Department of Architectural Engineering, Pusan National University)
Jeong, Hee Woong (Department of Architectural Design, Dongseo University)
Kim, Dae Young (Department of Architectural Engineering, Pusan National University)
Publication Information
Journal of the Korea Institute of Building Construction / v.21, no.5, 2021 , pp. 445-457 More about this Journal
Abstract
In previous studies, it was confirmed that through the in-situ production of precast concrete members, costs could be reduced by 14.5-39.4% compared to in-plant production. In particular, it was confirmed that the factory owner did not make a contract if it did not earn more than 20% of the production cost. If precast concrete members are produced in-situ under the same conditions, the quality equivalent to that of factory production can be secured. As it is advantageous in terms of cost and quality, precast concrete members must be produced in-situ. However, it is difficult to produce all quantities in-situ due to time and various other constraints. This is because in-situ production is avoided due to anticipated risks during the project management process. However, if the risk factors are analyzed before performing in-situ production of precast concrete members, it will increase the opportunity for in-situ production. Therefore, this study develops a checklist for evaluating the risk of in-situ production of precast concrete members. By applying the checklist to one case site, it was verified that risk factors can be evaluated easily and quickly. As a result, it was analyzed that sites with a high building coverage ratio are classified as high-risk sites because it is difficult to secure usable area for production and storage. The developed checklist efficiently evaluates the risk factors of in-site production, and makes it possible for the operator to determine the risk factors, which can change frequently during project execution, and respond according to the situation.
Keywords
in-situ production; precast concrete members; risk checklist development; risk evaluation; case project;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Kim SK, Hong WK, Kim JH, Kim JT. The development of modularized construction of enhanced precast composite structural systems (Smart Green frame) and its embedded energy efficiency. Energy and Building. 2013 Nov;66:16-21. https://doi.org/10.1016/j.enbuild.2013.07.023   DOI
2 Pan W, Gibb AGF, Dainty ARJ. Strategies for integrating the use of off-site production technologies in house building. Journal of Construction Engineering and Management. 2012 Nov;138(11):1331-40. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000544   DOI
3 Hong WK, Kim SK, Kim SI. Load carrying capacity of structural composite hybrid system (green frame). The International Journal of the Korea Institute of Ecological Architecture and Environment. 2010 Feb;10(1):25-31.
4 Kang SM, Kim OJ. Domestic and foreign present situation analysis of a PC method. Seoul (Korea): Daelim Technology Research Institute: Architecture(Spring); 2006. p. 28-37.
5 Park H, Park S, Hong K, Kim S. Development of residential PC prefabricated building structure system. Construction Engineering and Management. 2011 Feb;12(1):11-6.
6 Yoon D, Hong W, Yoon T. Half slab construction for eco-friendly composite frame system. Proceeding of the 2010 Autumn Annual Conference of the Korea Institute of Building Construction; 2010 Nov 18-19; Suwon, Korea. Seoul (Korea): the Korea Institute of Building Construction; 2010. p. 15-8.
7 Kang LS, Kim CH, Kwak JM. Analysis for the importance of risk factors through the project life cycle. Journal of the Architectural Institute of Korea(Structure & Construction). 2001 Aug;17(8):103-10.
8 Chung BH, Chung YS. Analysis and reduction for risk factors of construction projects. Korean Journal of Construction Engineering and Management. 2001 Aug;2(4);62-8.
9 Suh SW, Kim JJ, Kim KR. A decision making model for construction risks using optimized response method. Journal of The Architectural Institute of Korea(Structure & Construction). 2002 Oct;18(8):115-22.
10 Kang SK. A study on the risk management efficiency in the cost of apartment housing development [master's thesis]. [Seoul (Korea)]: Chung-Ang University; 2004. 86 p.
11 Lee JK, Lee JH. A study on the method of the risk management in the housing project. Journal of the Korea Institute of Ecological Architecture and Environment. 2008 Apr;8(2):79-86.
12 Lee GJ. A study of in-situ production management model of composite precast concrete members [Ph.D. Thesis]. [Seoul (Korea)]: Kyung Hee University; 2012. 77 p.
13 Na YJ, Kim SK. A process for the efficient in-situ production of precast concrete members. Journal of the Regional Association of Architectural Institute of Korea. 2017 Oct;19(4):153-61.
14 Won IW, Na YJ, Kim JT, Kim SK. Energy-efficient algorithms of the steam curing for the in situ production of precast concrete members. Energy and Building. 2013 Sep;64:275-84. https://doi.org/10.1016/j.enbuild.2013.05.019   DOI
15 Lim C. Construction planning model for in-situ production and installation of composite precast concrete frame [Ph.D. Thesis]. [Seoul (Korea)]: Kyung Hee University; 2016. 9 p.
16 Oh OJ. A model for production and erection integration management of large scale PC structures using system dynamics [Ph.D. Thesis]. [Seoul (Korea)]: Kyung Hee University; 2017. 42 p.
17 Jung KO, Chung YK. The pollution and economic growth based on the multi-country comparative analysis. Journal of Industrial Economics and Business. 2004 Oct;17(4):1077-98.
18 Lim JY, Kim SK. Evaluation of CO2 emission reduction effect using in-situ production of precast concrete components. Journal of Asian Architecture and Building Engineering. 2020 Feb;19(2):176-86. https://doi.org/10.1080/13467581.2020.1726763   DOI
19 Lim JY, Kim SK, Kim JJ. Dynamic simulation model for estimating in-situ production quantity of PC members. International Journal of Civil Engineering. 2020 Apr;18:935-50. https://doi.org/10.1007/s40999-020-00509-4   DOI
20 Pan M, Pan W. Advancing formwork systems for the production of precast concrete building elements: from manual to robotic. Proceedings of 2016 Modular and Offsite Construction (MOC) Summit; 2016 Sep 29-Oct 01; Edmonton, Canada. Alberta (Canada): Modular and Offsite Construction Summit; 2016. p. 2-9. https://doi.org/10.29173/mocs1   DOI
21 Pan M, Pan W. Determinants of adoption of robotics in precast concrete production for buildings. Journal of Management in Engineering. 2019 Sep;35(5):05019007. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000706   DOI
22 Mao C, Shen Q, Pan W, Ye K. Major barriers to off-site construction: The developer's perspective in China. Journal of Management in Engineering. 2015 May;31(3):04014043. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000246   DOI
23 Arashpour M, Wakefield R, Abbasi B, Lee EWM, Minas J. Off-site construction optimization: Sequencing multiple job classes with time constraints. Automation in Construction. 2016 Nov;71:262-70. https://doi.org/10.1016/j.autcon.2016.08.001   DOI
24 Lim J, Kim JJ. Dynamic optimization model for estimating in-situ production quantity of PC members to minimize environmental loads. Sustainability. 2020 Oct;12(19):8202. https://doi.org/10.3390/su12198202   DOI
25 Lim J, Park K, Son S, Kim S. Cost reduction effects of in-situ PC production for heavily loaded long-span buildings. Journal of Asian Architecture and Building Engineering. 2020 Mar;19:242-53. https://doi.org/10.1080/13467581.2020.1740095   DOI
26 Song KJ, Lee UK, An SH, Kang KI. PC production schedule optimization model using a genetic algorithms and random keys. Proceeding of the 2005 Autumn Annual Conference of the Architectural Institute of Korea; 2005 Oct 24-25; Seoul, Korea. Seoul (Korea): the Architectural Institute of Korea; 2005. p. 487-90.
27 Lim J, Son S, Kim JT, Kim S. Experimental study of in-situ production of precast concrete members, Proceeding of the 7th International Conference on Construction Engineering and Project Management(ICCEPM); 2017 Oct 27-30; Chengdu, China. Seoul (Korea): Korea Institute of Construction Engineering and Management; 2017. p. 98.
28 Park SH, Lim CY, Lee WJ, Kim DS, Jung, YS. The experimental study on concrete manufacturing technologies for ultra high strength concrete pile. Proceeding of the 2013 Spring Annual Conference of the Korea Concrete Institute; 2013 May 8-10; Seoul, Korea. Seoul (Korea): the Korea Concrete Institute; 2013. p. 67-8.
29 Hong WK, Lee GJ, Lee S, Kim SH. Algorithms for in-situ production layout of composite precast concrete members. Automation in Construction. 2014 May;41:50-9. https://doi.org/10.1016/j.autcon.2014.02.005   DOI
30 Lim J. A risk management model for in-situ production of precast concrete members focused on time and cost using system dynamics [Ph.D. Thesis]. [Seoul (Korea)]: Kyung Hee University; 2018. 54 p.
31 Hwang BG, Shan M, Looi KY. Key constraints and mitigation strategies for prefabricated prefinished volumetric construction. Journal of Cleaner Production. 2018 May;183:183-93. https://doi.org/10.1016/j.jclepro.2018.02.136   DOI
32 Pan M, Linner T, Pan W, Cheng H, Bock T. A framework of indicators for assessing construction automation and robotics in the sustainability context. Journal of Cleaner Production. 2018 May;182:82-95. https://doi.org/10.1016/j.jclepro.2018.02.053   DOI
33 Park JH, Kim SJ, Paik MS, Lee SH, Park B K, Jung SJ. An experimental study on strength characteristics of mass concrete cast with high-strength concrete for precast application. Proceeding of the 2007 Autumn Annual Conference of the Korea Concrete Institute; 2007 Nov 7-9; Seoul, Korea. Seoul (Korea): the Korea Concrete Institute; 2007. p. 585-8.
34 Kim MH. A study on the method of the risk management in the real estate development project. Seoul (Korea): Construction and Economy Research Institute of Korea; 2005. 97 p.
35 You YC, Choi KD, Kim KH, Lee LH. Mechanical bar anchorage of the PC in beam-column joint. Journal of the Architectural Institute of Korea. 2001 May;17(5):35-42.
36 Son SH, Lim JY, Kim SK. Planning algorithms for in-situ production of free-form concrete panels. Automation in Construction. 2018 Jul;91:83-91. https://doi.org/10.1016/j.autcon.2018.03.006   DOI
37 Shin KH, Kim JJ. A Study on the importance of risk factors for effective risk management in the pre-project planning phase of the development projects. Korean Journal of Construction Engineering and Management. 2002 Mar;3(2):75-86.