• 제목/요약/키워드: Execution Phase

검색결과 189건 처리시간 0.028초

건축물 시공단계에서의 온실가스 배출 관리 방안 -국내외 친환경 인증제도와 일본 현장의 대응 방안을 중심으로- (Greenhouse Gas Management Policy during Construction Execution Phase -Focused on Green Building Rating Systems and Japanese Case-)

  • 송상훈
    • KIEAE Journal
    • /
    • 제10권5호
    • /
    • pp.139-150
    • /
    • 2010
  • Until now, the eco-friendly construction (green construction) has been focused on reducing environmental impacts in use(operation and maintenance) phase. Considering the environmental influence along the life cycle of construction project, the impact in execution phase is rather lower than that in use phase. However, that impact is thought to be greatly decreased by well-organized activities. Based on its urgency and requirement for timely action, this study aimed to discuss the greenhouse gas (GHG) reduction plan in execution phase from a broad perspective. To achieve this purpose, the green building rating systems in domestic and foreign countries have been reviewed, and the practice in Japan was investigated. In order to improve current on-site greenhouse gas management, the integration among construction phases, participants, and environmental factors, and institutional supports are required as well as the contractor's efforts.

Improving Execution Models of Logic Programs by Two-phase Abstract Interpretation

  • Chang, Byeong-Mo;Choe, Kwang-Moo;Giacobazzi, Roberto
    • ETRI Journal
    • /
    • 제16권4호
    • /
    • pp.27-47
    • /
    • 1995
  • This paper improves top-down execution models of logic programs based on a two-phase abstract interpretation which consists of a bottom-up analysis followed by a top-down one. The two-phase analysis provides an approximation of all (possibly non-ground) success patterns of clauses relevant to a query. It is specialized by considering Sato and Tamaki’s depth k abstraction as abstract function. By the ability of the analysis to approximate possibly non-ground success patterns of clauses relevant to a query, it can be statically determined whether some subgoals will fail during execution and some succeeding subgoals do not participate in success patterns of program clauses relevant to a given query. These properties are utilized to improve execution models. This approach can be easily applied to any top-down (parallel) execution models. As instances, it is shown to be applicable to linear execution model and AND/OR Process Model.

  • PDF

국제기술협력 관계 프로세스 모형 개발에 관한 연구 (Research on International Technical Cooperation Relationship Process Model)

  • 김진숙
    • 한국산학기술학회논문지
    • /
    • 제12권11호
    • /
    • pp.4796-4800
    • /
    • 2011
  • 본 논문에서는 국제기술협력 관계 프로세스 모형이 개발되었다. 모델은 5단계로 구성되어있다: 시작단계 파트너 탐색단계, 계약단계, 실행단계 그리고 종료단계. 시작단계에서 산업체들은 자신이 필요한 것을 잘 인지하지 못하는 경향이 있었으며 파트너 탐색단계에서는 자신에게 필요한 파트너 탐색에 어려움을 가지고 있었다. 계약단계에서는 국제법에 대한 어려움과 실행단계에서는 문화적 어려움을 가지고 있었다. 따라서 정부는 각 단계별 지원책을 모색할 필요가 있다.

컴퓨터 게임 환경에서 에이전트들의 효율적인 협력을 위한 통신 프로토콜과 역할 배정 (Communication Protocol and Role Assignment for Efficient Agent Cooperation in Computer Game Environments)

  • 김인철
    • 인터넷정보학회논문지
    • /
    • 제7권2호
    • /
    • pp.137-149
    • /
    • 2006
  • 본 논문에서는 컴퓨터 게임 환경에서 에이전트들의 효율적인 협력과 팀워크를 위한 메시지 기반의 통신 프로토콜과 동적 역할 배정 방법을 제시한다. 본 논문에서 제시하는 동적 역할 배정 방식은 설계단계 혹은 실행단계에서 역할 배정에 필요한 모든 사항을 결정하는 기존의 정적 역할 배정 방식이나 동적 역할 배정 방식과는 다른 새로운 역할 배정 방식이다. 이 역할 배정 방식에 따르면, 설계단계에서 가능한 역할집합들을 미리 결정하지만, 이 역할집합에 명시된 각각의 역할을 어느 에이전트가 맡아 수행할 것인가는 실행단계에 가서 결정한다. 이 방법은 역할배정에 필요한 실행단계의 협상을 최소화할 수 있는 방법으로서, 실시간 멀티 에이전트 환경에 매우 효과적인 방법이다. 본 본문에서는 실험을 통해 새로운 동적 역할 배정 방식의 우수성을 보인다.

  • PDF

XScale 프로세서 기반의 임베디드 소프트웨어를 위한 최악실행시간 분석도구의 구현 (Implementation of Worst Case Execution Time Analysis Tool For Embedded Software based on XScale Processor)

  • 박현희;최명수;양승민;최용훈;임형택
    • 정보처리학회논문지A
    • /
    • 제12A권5호
    • /
    • pp.365-374
    • /
    • 2005
  • 신뢰성 있는 내장 실시간 시스템을 구축하기 위해서는 프로그램의 스케줄링 가능성 여부를 검증해야 한다 스케줄링 가능성 분석을 위해서 는 프로그램의 최악실행시간 정보가 필수적인 요소이다. 최악실행시간 분석은 두 단계로 나된다. 첫 번째 단계에서는 프로그램 언어 구문상의 흐름을 분석하고, 두 번째 단계에서는 수행되는 흐름 경로상의 하드웨어적인 요소를 고려하여 수행시간을 분석한다. 본 논문에서는 XScale 프로세서를 대상으로 하는 최악실행시간 통합 분석 도구인 WATER(WCET Analysis Tool for Embedded Real-time system)를 설계하고 구현한다. 상위 수준의 흐름 분석기와 하위 수준의 실행시간 분석기로 이루어진 WATER의 구조를 소개하고 소프트웨어의 실제 측정과 WATER의 분석 결과를 비교한다.

이승만 대통령의 전쟁지도 (President Syngman Rhee and the Conduct of the Korean War)

  • 김행복
    • 안보군사학연구
    • /
    • 통권1호
    • /
    • pp.35-70
    • /
    • 2003
  • President Lee, Syngman was ROK supreme commander at the Korean war. But, it is doubt that he executed his authority and responsibility by the ROK constitution and law. At the phase of the Korean War conduct, his role may be divided into 'military operation execution one' and 'political-diplomacy one'. He appointed unqualified person to the important position of the national defence, didn't make war execution system, and was not make to meet the war. And, after transferring the ROK force operation commanding authority to the Commander in Chief, UN Command, his role was extremely trivial at the military operation execution phase. Any way, he intended to recover the inferior national strength and military capacity with USA aid, and concentrated his effort toward diplomacy with USA. At last, he succeeded in making a mutual defence treaty and gained a big result to harden Korea national security after war. In sum, president Lee was shrewd politician and diplomat than military leader. And, it can be evaluated that he supplemented the lost part of military affairs side with diplomat one.

  • PDF

A Geometric Constraint Solver for Parametric Modeling

  • Jae Yeol Lee;Kwangsoo Kim
    • 한국CDE학회논문집
    • /
    • 제3권4호
    • /
    • pp.211-222
    • /
    • 1998
  • Parametric design is an important modeling paradigm in CAD/CAM applications, enabling efficient design modifications and variations. One of the major issues in parametric design is to develop a geometric constraint solver that can handle a large set of geometric configurations efficiently and robustly. In this appear, we propose a new approach to geometric constraint solving that employs a graph-based method to solve the ruler-and-compass constructible configurations and a numerical method to solve the ruler-and-compass non-constructible configurations, in a way that combines the advantages of both methods. The geometric constraint solving process consists of two phases: 1) planning phase and 2) execution phase. In the planning phase, a sequence of construction steps is generated by clustering the constrained geometric entities and reducing the constraint graph in sequence. in the execution phase, each construction step is evaluated to determine the geometric entities, using both approaches. By combining the advantages of the graph-based constructive approach with the universality of the numerical approach, the proposed approach can maximize the efficiency, robustness, and extensibility of geometric constraint solver.

  • PDF

공기업에서의 BPR 실행 성공요인에 관한 단계적 모형 (The Phased Model of Success Factors in BPR Implementation for Public Corporations)

  • 김상훈;김창렬;최점기
    • 한국IT서비스학회지
    • /
    • 제4권2호
    • /
    • pp.1-22
    • /
    • 2005
  • The object of this study is to elicit major success factors along with the phases of implementing the BPR in case of public corporations. To obtain the goal of this research, (1) this study reviews and integrates the major previous BPR studies and shows critical success factors of implementing BPR projects coincided with the characteristics of the public organizations. (2) This study has analyzed and arranged the details of BPR projects of public corporations in South Korea through the literature survey, the questionnaire and the interview. (3) This study classifies 40 critical success factors which were identified in existing studies into ones belonging to 3 phases of BPR projects implementation: Introduction Phase, Execution Phase and Stabilization Phase. (4) This study has tested the relation between critical success factors on each stage of BPR projects implementation and the performance variables. It has proven that there is the statistically significant correlation between the success factors and the performance. The findings of this study are thought not only to be useful as a practical guideline in carrying out BPR project Implementation but also to provide significant basis for constructing the theoretical framework of effective BPR project implementation strategy.

PDA를 위한 32비트 RISC 코어의 설계 (A design of 32-bit RISC core for PDA)

  • 곽승호;최병윤;이문기
    • 한국통신학회논문지
    • /
    • 제22권10호
    • /
    • pp.2136-2149
    • /
    • 1997
  • 본 논문에서는 PDA나 PCS와 같은 내장형 응용을 위한 RISC 코어를 설계하였다. 이 RISC 프로세서는 내장형 응용의 중요한 특성인 빠른 인터럽트 핸들링, 빠른 컨텍스트 스위칭과 저전력 소모를 지원한다. 또한 조건부로 수행 가능한 명령어 군과 블럭 전송 명령 그리고 곱셈 명령을 이용하여 프로세서의 성능을 향상시켰다. 3단 파이프라인을 이용하였으며 2-phase 클럭을 사용한 단일 사이클 명령어 수행이 가능하다. 이 프로세서는 $5.0{\times}5.0mm^2$의 면적에 약 88,000개의 트랜지스터가 집적되었으며 $0.6{\mu}\textrm{m}$ 삼중 금속 단일 폴리 공정을 이용하여 레이아웃 되었다. 최대 동작 주파수는 40MHz이며 예상 전력 소비는 179mW이다.

  • PDF

에너지절약 민간단체 협력사업의 성과분석 평가지표 개발 (A Study on Development of Evaluation Indicators to Collaborative Energy Saving Projects with NGO)

  • 임기추
    • 에너지공학
    • /
    • 제24권3호
    • /
    • pp.142-149
    • /
    • 2015
  • 본고에서는 에너지절약 협력사업의 성과분석을 위한 평가지표를 개발하였다. 전문가 자문을 통해 사업계획, 사업집행 및 사업성과 등 단계별 성과분석을 위해서 평가지표를 제시하였다. 성과분석을 위한 주요 평가지표로 1) 계획단계의 사업 선정 및 평가기준, 목표와 계획의 구체성, 2) 프로그램 운영상 사업 추진방식의 체계화, 사업관리와 사후관리 내용 및 참여주체 선정내용, 3) 프로그램 추진성과의 목표달성여부, 참여자 만족도 등 효과성 등을 들 수 있다. 이와 같은 평가지표는 전문가 자문을 통해 수립단계의 적절성(4개 항목), 운영상의 집행성과(6개 항목), 사업성과의 효과성(5개 항목) 등의 평가지표를 설정하였다. 다만, 사업단계별 평가지표 이외에 협력사업에 대한 에너지절약 효과와 홍보활동 성과 등에 대한 평가지표를 포함하지 못한 제약을 안고 있다.