• Title/Summary/Keyword: Evaluation system

Search Result 20,716, Processing Time 0.041 seconds

A Study on Establishing the Performance Evaluation System of the Fish Stock Rebuilding Plans (수산자원회복계획의 성과평가 개선방향에 관한 연구)

  • Kim, Dae-Young;Lee, Jung-Sam;Kim, Do-Hoon
    • The Journal of Fisheries Business Administration
    • /
    • v.42 no.3
    • /
    • pp.15-29
    • /
    • 2011
  • The Fish Stock Rebuilding Plan (FSRP) is evaluated as one of the most effective fisheries policies domestically and internationally. FSRP is a comprehensive fisheries policy, including target stock size, rebuilding period, application of management measures, and participation of fishermen. The performance outcomes of FSRPs have been partially evaluated for recommendation for stock rebuilding in Korea, while they are fully evaluated in other countries that have implemented FSRPs. The performance evaluation system for FSRP is very needed to enhance its effectiveness as one of fisheries policies. That is, the system where problems can be reconsidered, achieving targets can be evaluated, and the plan can be modified should be implemented. This study classified the performance evaluation of FSRP into the economic evaluation as a quantitative analysis and the policy evaluation as a qualitative analysis. In the economic evaluation, the sustainability of fishery resources, the stability of fishing business, the efficiency of fishery production, and efficient utilization of fishery resources can be considered. As analytical methods for the economic evaluation, the bioeconomic model, efficiency estimation model, the dynamic MEY model can be utilized. The qualitative evaluation is to assess the qualitative performances of FSRPs, including interviews and surveys with fishermen and fisheries experts. In the survey, many different items can be included by evaluation factors which are related to policies such as timeliness, transparency, effectiveness, etc. In addition, the study suggested the performance evaluation system and procedures for objective and efficient evaluation of FSRPs. In order to practically apply the developed performance evaluation model, the pilot project is needed. That is, from the application of pilot project, detailed research methods, effective procedures, and evaluation factors can be investigated.

Quality Evaluation Model about Efficiency for Fingerprint Recognition System (지문인식 시스템의 효율성에 관한 품질평가 모델)

  • Lee, Ha-Young;Kim, Jung-Gyu
    • Journal of Digital Convergence
    • /
    • v.12 no.6
    • /
    • pp.215-221
    • /
    • 2014
  • The Fingerprint recognition system is a system which identify the user's identify by verifying user's fingerprint and prepared data. The performance of fingerprint recognition system is dependent on 'fingerprint recognition time' and 'fingerprint recognition accuracy' and so on. In this paper, we developed a evaluation model about efficiency based on ISO quality evaluation standard for evaluating of quality level of fingerprint recognition system. We expect to contribute to construct and use of evaluation criteria based on quality evaluation standard by this study.

An Evaluation of Information Systems Services in the Public Sector: Knowledge Management Approach (공공부문 정보화사업평가 - 지식경영 측면의 접근)

  • Lim, Joon Hyoung;Myung, Sung-Jun;Kim, Jae-Young
    • Knowledge Management Research
    • /
    • v.18 no.3
    • /
    • pp.231-246
    • /
    • 2017
  • As an interest in the efficiency of public sector expenditures has spread across the world, Korea has operated a self-evaluation system for government projects as a part of the performance-based budget system. However, an evaluation system for public information technology project has been criticized for its lack of validity, which stems from the uniformity of performance management. This study draws insight from knowledge management literature in an attempt to address the problems with the extant performance evaluation system in public agencies. To realize benefits from IT investment, an agency needs to develop its own performance management model for information systems projects, with a focus on the interaction of IT and organizational system. The knowledge management-based framework for IT projects was verified through a case study, with which we discussed the applicability of knowledge management to the evaluation of public information systems projects.

A Study on the application of Balanced Scorecard in Small Business: A case of development of a Human Resource Evaluation System (중소기업의 BSC활용방안에 관한 연구 : 인사평가제도 시스템 구축 사례)

  • Kang, Shin-Cheol
    • Journal of Information Technology Applications and Management
    • /
    • v.16 no.1
    • /
    • pp.77-96
    • /
    • 2009
  • The balanced scorecard has drawn attention from many researchers in various fields since its appearance in 1992. It became a norm for performance evaluation framework in many areas, such as marketing, information system evaluation, strategic planning, etc. Centered in the large companies in Korea, the balanced scorecard has been popularly used as a performance evaluation tool for human resource management. Now we Question its applicability to performance evaluation tool even in small business. This study tried to apply the balanced scorecard in developing an information system for performance evaluation in a small business. The study showed that the balanced scorecard can be nicely used in small business as a performance evaluation tool. The process of developing an information system is described in detail. The practitioners are to obtain a lot of insights in designing their human resource management systems from the study results.

  • PDF

A Study on the Evaluation Model for Company Selection of Defense Information System R&D Projects (국방 정보시스템 연구개발사업 업체선정 평가모형 개발에 관한 연구)

  • Kim, Sun-Young;Lee, Young-Jae
    • The Journal of Information Systems
    • /
    • v.19 no.2
    • /
    • pp.73-95
    • /
    • 2010
  • This study shows the scientific and systematic Evaluation Model using factor analysis and AHP methods for the success of defense Information System R&D projects. The evaluation model was divided into 7 evaluation factors such as Developing support, Developing infrastructure, Developing management and test & evaluation, Support factors for strength, Understanding & developing strategy, Developing technology & organization, and Developing performance. And those were composed of totally 24 low level Evaluation index. The Developed Evaluation Model in the paper could be contributed more to objectively and transparently company selection of defense Information System R&D and other defense R&D Projects in the future.

SERVICE QUALITY EVALUATION INDICATORS FOR ASP-BASED PROJECT MANAGEMENT INFORMATION SYSTEM

  • Lee, Seul-Ki;Yu, Jung-Ho;Kim, Chang-Duk
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1453-1462
    • /
    • 2009
  • It is very important for performance of information system that we make an effort to raise user's satisfaction by continuously grasping user's requirement by evaluation of PMIS based on ASP service quality and reflecting this to information system. However, It is lack that developments of suitable evaluation index of PMIS based on ASP service quality. Hereupon, In this study, we propose the evaluation indicators. First, The evaluation area is classified by form the foundation of D & M IS Success Model (2003); system quality, information quality, service quality. Second, The detail evaluation item which include considerations which are gotten through investigation of the construction industry and PMIS based on ASP is grouping by form the foundation SERVQUAL which is a service quality evaluation tool proposed PZB(1988). It is suitable to evaluate PMIS based on ASP service quality in construction industry and able to evaluate various aspects.

  • PDF

Development of the Evaluation Model for the Quantitative Analysis of Local Agenda 21 (지방의제 21의 정량적 분석을 위한 평가모델의 개발)

  • Woo, Hyung-Taek
    • Journal of Environmental Science International
    • /
    • v.15 no.12
    • /
    • pp.1205-1220
    • /
    • 2006
  • This study was conducted to develop the evaluation model which can analyse local agenda 21 comprehensively and systematically from the making process to the designed contents. The evaluation model was devised through the theoretical review of local agenda 21 and designing the evaluation system composed of evaluation domains, related indicators and scales. The evaluation system was carefully constructed based on planning theories and the discussion and agreement of specialists regarding local agenda 21. This model has three evaluation domains of process, content, and evaluation of implementation with different weighting values. Each domain contains large indicators, medium indicators and small indicators. Each indicator has different weighting value according to its importance. Basically, each small indicator was scored by 3 or 5 point scale. This evaluation system can not only analyse local agenda 21 quantitatively, but also find out good points, problems, and limits of various phases of planning and implementing local agenda 21.

STRATEGY-ORIENTED EVALUATION OF MIS

  • Chung, Moon-Sang
    • The Journal of Information Systems
    • /
    • v.3
    • /
    • pp.133-145
    • /
    • 1994
  • Performance evaluation is essential for the successful management and operation of MIS. The more MIS grows and relevant investment enlarges, the more performance evaluation grows in importance. However, MIS managers as well as top management still have difficulty in evaluating the performance of MIS. This arises from various reasons, such as the specialty of MIS, diversified influences of MIS, multidimensionality of evaluation items, and the difference between evaluation levels. In this paper, MIS is understood in a broad sense. MIS's scope is of a very wide range from each application system to system innovation view. The MIS should support the firm's objectives, and, consequently, MIS evaluation should be implemented at corporate level, not merely at application system level. The most critical problem of MIS evaluation is that a systematic frame covering various viewpoints and factors of MIS evaluation does not exist. Not a single measure covers all aspects of MIS evaluation. To help resolve this problem, this paper proposes an hierarchical approach for practical use that includes most aspects of evaluation approaches from previous studies, and, furthermore, emphasizes the evaluation of strategic aspects of MIS.

  • PDF

A Study on the Development and Operation of Integrated Assessment System for National Competency Standard Professional Basic

  • Chang, Young-Hyun
    • International journal of advanced smart convergence
    • /
    • v.7 no.4
    • /
    • pp.121-127
    • /
    • 2018
  • This paper develops and builds an Integrated Assessment System for National Competency Standard Professional Basic. The integrated evaluation system for basic job competency in the National Competency Standards is developed to conduct examination by means of computers, smartphones and tablet PCs. The system can be used for the basic job competency test, examination for online cyber universities, job competency examination for enterprises, and the listening, reading, and speaking test in the foreign language proficiency examination and is even better in terms of facility investment and saved operating costs as well as efficient use of spaces in comparison with conventional evaluation schemes. Even greater synergy effects can be achieved by providing support for the integrated evaluation system for basic job competency in connection with the NCS qualification system. The evaluation system has been tested and practiced at a specialized high school and can be applied to the NCS education evaluation of the college and four-year college and to the selection examination of new employees of the company.

Improvement scheme of utilization of the results of the post-construction evaluation system (건설공사 사후평가 수행결과 활용도 개선 방안)

  • Lee, Du-Heon;Park, Jae-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.6
    • /
    • pp.78-89
    • /
    • 2013
  • Post-evaluation system reflects the results of performing a public construction project in the future similar public construction projects to be utilized in the planning. However, the current system simply compares the expected values, such as demand, B/C ratio, cost of construction, construction period, with the actual values after the completion of construction. In addition, most public owner does not actively conduct the post-construction evaluation tasks, so that the evaluation results has not been returned to early stage of a construction project. In this study, status of the post-construction evaluation system is investigated by a survey of the public owner and the construction project evaluation system of the United States and Japan was analyzed. This paper presents the improvement scheme of utilization of the results of the post-construction evaluation system. Through improving the post-construction evaluation system, it is expected that public agencies would easily utilize the post-construction evaluation.