• Title/Summary/Keyword: Evaluation Schedule

Search Result 268, Processing Time 0.021 seconds

Public Infrastructure Practitioner's Recognition on Project Performance (공공토목공사 실무자의 성과요인 인식차이 분석)

  • Park, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.93-100
    • /
    • 2007
  • Performance measurement and evaluation is a critical issue in public funded civil infrastructure projects in recent years. As a results, Korean government has introduced the related policies and regulations based on the foreign cases to evaluate public construction projects. However, construction circumstances are different from other countries and the results from adopted regulations are not satisfied. Therefore this research proposes the critical success factors(schedule, cost, productivity, change order, safety, quality) for public construction projects based on previous related research outputs to successfully implement construction performance evaluation. Then, this paper also proposes the weights for the critical success factors. The proposed weights are developed by AHP of construction experts. Furthermore, the paper shows the difference of the weights of the critical success factors by project participants (owner, constructor, engineering, and inspector). This efforts will enhance the ability to develop an effective performance evaluation process and system for public construction projects.

Prostate cancer in workers exposed to night-shift work: two cases recognized by the Korean Epidemiologic Investigation Evaluation Committee

  • Sungkyun Park;Seongwon Ma;Hoekyeong Seo;Sang Gil Lee;Jihye Lee;Shinhee Ye
    • Annals of Occupational and Environmental Medicine
    • /
    • v.35
    • /
    • pp.52.1-52.13
    • /
    • 2023
  • Background: In 2019, the International Agency for Research on Cancer re-evaluated the carcinogenicity of night-shift work and reported that there is limited evidence that night-shift work is carcinogenic for the development of prostate cancer. Therefore, in 2020 and 2021, the Korean Epidemiologic Investigation Evaluation Committee concluded that 2 cases of prostate cancer were occupational diseases related to the night-shift work. Here, we report the 2 cases of prostate cancer in night-shift workers which were first concluded as occupational diseases by the Korean Epidemiologic Investigation Evaluation Committee. Case presentation: Patient A: A 61-year-old man worked as a city bus driver for approximately 17 years, from 2002 to 2019, and was exposed to night-shift work during this period. In March 2017, the patient was diagnosed with high-grade prostate cancer through core-needle biopsy after experiencing stinging pain lasting for 2 months. Patient B: A 56-year-old man worked as an electrician and an automated equipment operator in a cement manufacturing plant for 35 years from 1976 to 2013 and was exposed to night-shift work during this period. In 2013, the patient was diagnosed with high-grade prostate cancer through core needle biopsy at a university hospital because of dysuria that lasted for 6 months. Conclusions: The 2 workers were diagnosed with high-grade prostate cancer after working night shifts for 17 and 35 years respectively. Additionally, previous studies have reported that high-grade prostate cancer has a stronger relationship with night-shift work than low or medium-grade prostate cancer. Therefore, the Korean Epidemiologic Investigation Evaluation Committee concluded that night-shift work in these 2 patients contributed to the development of their prostate cancer.

Development and Evaluation of Business Productivity of Construction Integrated Management System based on ERP System (ERP 기반 건설통합관리시스템의 개발 및 업무생산성 평가)

  • 백명종
    • The Journal of Society for e-Business Studies
    • /
    • v.6 no.3
    • /
    • pp.163-180
    • /
    • 2001
  • New information technology contributes to raising of business productivity in many construction companies. The application of construction integrated management system is expected to save the time of decision-making in business management and shorten the closing account schedule. Construction Integrated Management System based on ERP(Enterprise Resource Planning) system allows to control core business procedure by monitoring technique on real-time. In this paper, we achieves 10% raise up business productivity in site business area, and 30% raise up business productivity in head of nce business area by means of DW-CIMS (Daewoo Construction Integrated Management System)

  • PDF

Dialog System Using Multimedia Techniques for the Elderly with Dementia

  • Kim, Sung-Ill;Chung, Hyun-Yeol
    • The Journal of the Acoustical Society of Korea
    • /
    • v.21 no.4E
    • /
    • pp.170-177
    • /
    • 2002
  • The goal of the present research is to improve a quality of life of the elderly with a dementia. In this paper, it is realized by developing the dialog system that is controlled by three kinds of modules such as speech recognition engine, graphical agent, or database classified by a nursing schedule. The system was evaluated in an actual environment of a nursing facility by introducing it to an older male patient with dementia. The comparison study between dialog system and professional caregivers was then carried out at nursing home for 5 days in each case. The evaluation results showed that the dialog system was more responsive in catering to needs of dementia patient than professional caregivers. Moreover, the proposed system led the patient to talk more than caregivers did.

A Scheduling Heuristic Alogorithm for Flexible Manufacturing Systems (자동생산체제(自動生産体制)(FMS)에서의 생산일정계획(生産日程計劃))

  • No, In-Gyu;Choe, Jeong-Sang
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.14 no.1
    • /
    • pp.73-82
    • /
    • 1988
  • This research is concerned with production scheduling for FMS (Flexible Manufacturing System) which consists of machine centers served by cycle conveyor. The objective of the research is to develop and evaluate scheduling procedures to minimize the mean flow time. An optimal algorithm called SCTF (Shortest Circle Time First) is proposed when the conveyor runs at minimum possible speed (CS=1) and a heuristic algorithm called SCTJMF (Shortest Cycle Time and Job Matching Algorithm) is suggested when the conveyor runs at double speed (CS=2). The evaluation of the heuristic algorithm was implemented by comparison with the optimal algorithm for 112 experimentations for CS=1 and random schedule. The results showed that the proposed heuristic algorithm provides better solution that can be regarded noticeable when compared with SCTF algorithm and random scheduling.

  • PDF

A Study on the Attitude and Practice of Students, Teachers and School Nurses with Regard to Health Education (학교보건교육에 대(對)한 학생(學生), 일반교사, 양호교사의 태도(態度) 및 실천분석(實踐分析))

  • Kim, Ji Joo
    • Journal of the Korean Society of School Health
    • /
    • v.1 no.1
    • /
    • pp.133-147
    • /
    • 1988
  • For the evaluation of health instruction by school nurses on the regular schedule of 6 hours per week from March to December 1987, this study of the three groups of respondents in 919 teachers, 2133 students, and 548 school nurses regarding their attitudes and behaviors on health education was conducted by survey method during december 1987. The majority of respondendents in teachers, students, school nurses studied definitely favored the health instruction by school nurses, Respondents in teachers were more likely to be in favor of health education than the respondents in students. The evidence from the data analysis respondents had more positive attitudes and behaviors toward health in general after health instruction by school nurses than before.

  • PDF

An Evaluation of Lot-sizing Rules under the Uncretainty of Demand and Lead Time

  • Hwang, Hark;Kim, Jae-Ho
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.10 no.1
    • /
    • pp.27-36
    • /
    • 1984
  • This paper examines the influence of the uncertainty in demand and lead time on the relative performances of ten well-known single stage lot-sizing rules in a rolling schedule environment. Two other factors, coefficient of variation and time between orders, which may affect the performances of the rules are also considered. To compare the rules under an identical condition, 100% service level is set by introducing safety stocks. The effects of various factor levels are checked statistically by the pairwise t-test and the results show that the uncertainty of the environment has a strong influence on the performance of the rules.

  • PDF

Performance Evaluation of Gang Scheduling Policies with Migration in a Grid System

  • Ro, Cheul-Woo;Cao, Yang
    • International Journal of Contents
    • /
    • v.6 no.4
    • /
    • pp.30-34
    • /
    • 2010
  • Effective job scheduling scheme is a crucial part of complex heterogeneous distributed systems. Gang scheduling is a scheduling algorithm for grid systems that schedules related grid jobs to run simultaneously on servers in different local sites. In this paper, we address grid jobs (gangs) schedule modeling using Stochastic reward nets (SRNs), which is concerned for static and dynamic scheduling policies. SRN is an extension of Stochastic Petri Net (SPN) and provides compact modeling facilities for system analysis. Threshold queue is adopted to smooth the variations of performance measures. System throughput and response time are compared and analyzed by giving reward measures in SRNs.

A Study on the Promotion of Reliability Test for Imbedded Software of Weapon System (무기체계 내장형 소프트웨어 신뢰성시험 향상방안에 관한 연구)

  • Heo, Kon Yi;Kwon, Kyoug Yong;Kim, Tae Sik
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.11 no.1
    • /
    • pp.67-72
    • /
    • 2015
  • It has been tested for SW reliability in order to prevent the SW error during the development of weapons systems. According to a recent report, defects such as memory leak, buffer overflow, and null deference occur usually in the development stage, but also in the mass production stage. Although it is intended to enhance the SW test and evaluation to prevent SW failures in the development stage, the non-functional problems like syntax errors are not completely revised due to the limitation of the schedule and costs. In addition, SW failure rate are usually fluctuated by the operational environment through SW upgrade in contrast with HW. In this paper, we propose a method to increase SW reliability in the mass production stage of Korean weapon systems.

Workload evaluation of squat sitting postures (쪼그려 앉은 작업자세에서의 작업부하 평가)

  • 이인석;정민근
    • Proceedings of the ESK Conference
    • /
    • 1997.04a
    • /
    • pp.90-94
    • /
    • 1997
  • Many workers like welders are working in squat sitting postures with te object on the ground for an entire work shift. It is suspected that such prolonged squat sitting without any supporting stool would gradually cause musculoskeletal injuries to workers. This study is to quantitatively evaluate the physical stress caused by the prolonged squat sitting and to recommend a safe work/rest schedule for the task with squat sitting posture based on the lab experiment. In this study, 8 healthy student subjects participated in the experiment. They maintained a squat sitting posture for 16 minutes with 4 different stool height conditions: no stool, 10cm hight, 15cm height, 20cm height. Every 2 minutes, the discomfort was subjectively assessed using the magnitude estimation method for the whole body, lower back, upper leg and lower leg. Based on discomfort rating, we found that 10cm height stool relieved the workload most. Discomfort rating results also indicated that 20cm height stool showed the heghest workload, and that there was no difference in workload between 15cm height and no stool. We recommend to provide the workers with 10cm height stool for prolonged squat sitting tasks.

  • PDF