The Transactions of the Korean Institute of Power Electronics
/
v.11
no.5
/
pp.480-488
/
2006
Up to recently the harmonic generation has deteriorated the quality of electricity and affected the performance on the electrical installation including OA, FA, IT devices and so on. Some studies of harmonic affects in diagnosis and the cause of accident has not done by the experimental data of harmonic source but merely by presumption according to qualitative analysis. So, in order to research the harmonic affect on the electrical installation according to quantitative analysis and gather reliable data over and over again, it is necessary to develop an AC power source which is capable of generating some harmonics. In this paper, we described about realization of AC power source which can produce and compose harmonics for the analysis of accident due to harmonics.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.21
no.1
/
pp.60-65
/
2007
The radiologic imaging device was implemented. It can be installed in an ambulance or used when an accident happens. After an equipment which generates X-ray generating unit with a tube in DC 12[V] had been made, a trait experiment using an oscilloscope was made. An experiment was carried out where the generated X-ray was saved as a form of a file using a digital detector. In this experiment, as a result of generating X-ray and detecting it using a digital detector, 1.67[MB]-, jpg- radical rays information could be saved. One distinct advantage of the developed radiologic imaging device is the fact that we can efficiently deal with emergency cases too far from the hospital, difficult to diagnose but treat simultaneously. By using the radiologic imaging device at the urgent scene of an accident or in a moving ambulance, we can provide the patient's X-ray information with the emergency medical specialist who is in the emergent medical center and have the patients prescribed and treated appropriately. As a result the developed emergency medical treatment can be expected.
Kim, Gi-Hyun;Bang, Sun-Bae;Lee, Joo-Hwan;Kim, Jae-Chul
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.20
no.5
/
pp.42-48
/
2006
The number of confine-disease of elevator increases every year and then sudden rise, sudden stop, error of level indication, stand; those can bring to uneasiness of elevator passenger and malfunction accidents related life accident are increasing. For confirmation those malfunction accident, we are measuring and analyzing power quality(Sag, Swell, Interruption) of the actual site and evaluated the performance for stop and stating by testing the two imitation test equipment with EN12016(2004) standard level. This paper will be used data of the analysis for mutual relation between Power Quality and malfunction and fault of elevator.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.21
no.2
/
pp.78-85
/
2007
The malfunction accidents such as kept within elevator, sudden rise, sudden stop, error of level indication which can bring about uneasiness of elevator passenger and be related with life accident are occurring. However, as there is not field recurrence for this portion and they are accidents that occur and then disappear, it is actually difficult to confirm the reason of accident. Therefore, we made an experiment for tolerance in three models which is being built recently according to EN12016(2004) standard and analyzed the movement characteristics of elevator to study the reason which can bring about confine and malfunction. Furthermore after supplementing measures for malfunction, Finally this paper will be used as reference to suggest methods for malfunction of elevator facility and the analysis for mutual relation between Power Quality and malfunction and fault of elevator.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.20
no.6
/
pp.75-80
/
2006
The disastrous accident happens and the economic loss comes into being at the power facilities that used a industry site, if the fault comes into being. This paper experiments the partial discharge in the GIS used a $SF_6$ insulation gas by the pressure change. We studied the influence of particles at the partial discharge in a $SF_6$ gas. We use UHF method and measure the partial discharge signal radiation electromagnetic waves and to be happened at the $SF_6$. And we analyzed the influence on the $SF_6$ gas to have the particles which the partial discharge analyzes a spectrum of the radiated electromagnetic waves and comes out. The paper results aided the prevention of breakdown accident that happened by particles when an inside pressure changes at the GIS & the power facilities used $SF_6$ gas.
This study examined the mounting status of cigar lighter receptacles for vehicles and analyzed the tracking phenomenon that occurs when foreign material entered a cigar lighter receptacle to obtain data for the analysis of accident investigation. Regardless of the vehicle's output, cigar lighter receptacles are mounted in a vehicle horizontally, vertically, or at tilting or inclined angle. The tilting type cigar lighter receptacle is much easier to use but current leakage resulting from foreign materials (coffee, beverages, water, etc.) falling into the cigar lighter receptacle may cause a fire to start. This study used a vehicle battery (DC 12V) as a power supply for the tracking test and configured its circuit in the same way as that of an electrical device in a vehicle. The tracking phenomenon that occurred in the standby mode of the vehicle exhibited a fine flame and an irregular occurrence of smoke. While this tracking phenomenon was occurring, the leakage current and the reaching distance of the flame were measured to be approximately 930mA and $20{\sim}50cm$, respectively. It is thought that the resultant flame may ignite toluene, dust, cigarettes, etc. It was observed that as the tracking progressed, the internal metal socket melted and a hole was created, the surface of which was also severely carbonized. In addition, the electrical resistance of the carbonized conductive path was measured to be approximately $30{\Omega}$. It is thought that this much resistance may cause local heating when leakage current flows and could ignite any nearby flammable material.
Lee, Jong Oh;Yu, Kyoung-Kook;Shin, In-Kwon;Chang, Doc-Jin;Ahn, Chang-Hwan
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.29
no.8
/
pp.98-103
/
2015
Power plant is that very high reliability when industrial and economic impact on the overall electric power system is required, it is essential to improve the reliability, especially the fault prediction diagnosis. Since an accident caused by the partial discharge in the power plant is above state has a faster response characteristic than the other indications in the case of any, the partial discharge generated in the power plant immediately detect the deterioration of insulation due to the accident of the power plant and the non-drawn It should prevent or reduce. Partial Discharge Measuring Systems for UHV SF6 Gas Insulated Switchgear and power transformer on site installed has some probability of abnormal recognition in case of non-flexible deal with on site noise. Many methode to eliminate these kinds of noises, UHF Detection System is chosen as purchase description in Korea, but this system having a bandwidth between 500MHz 1.5GHz wide band. Initial install periods(about 20 years ago), this band had no strong signal source, but in these days this wide band have strong signals, such as LTE. So, module described in this paper is designed as simultaneously use with wide and narrow band for solve this noise problem, and introduce this system.
The main cause of cable accidents is the accelerated deterioration of the cable itself or internal and external electrical, mechanical, chemical, thermal, moisture intrusion, etc., which reduces insulation performance and causes insulation breakdown, leading to cable accidents. Insulation deterioration can occur even when there is no change in the appearance of the cable, so there is a difficulty in preventing cable accidents due to insulation deterioration. Since cable accidents can occur in areas with poor insulation due to the effects of overvoltage and overcurrent, it is necessary to comprehensively analyze transformers and circuit breakers, and ground faults caused by phase-to-phase imbalance. Ground fault accidents due to insulation breakdown of cables can occur due to defects in the cable itself and poor cable construction, as well as operational influences, arcs during operation of electrical equipment (switchers, circuit breakers, etc.). analysis is needed. This study intends to examine the causes of cable accidents through analysis of cable accidents that occurred in a manufacturing factory.
One of a large proportion among the causes of fire is electrical factors, and of fire by electric factors, the accident which accounted for over certain percentage is electric leakage and ground fault. In order to reduce the electric leakage and ground fault, the technical guidelines on the protection of ground fault in the low-voltage electrical line (KECG 1091-2011) was amended for reflecting recent international standard, IEC 60364-4-41, and new conservation methods, which improved the reliability by recovering the facility's all-time use operation and breakdown defect, was on the rise. Accordingly, in this paper, after grasping the fire's status for last 10 years and analyzing the risk of electrical fires, and as a way to improve the electric leakage and ground fault accident which accounted for more than certain percentage, the revision of KECG 1091-2011 will be reviewed. And then, after applying to the preventive conservation methods in order to enhance the protection reliability of electric leakage and ground fault detection, the problems at issue routine inspection scheme and durable years scheme in time-scheduled conservation method are listed, along with suggestion of the problem-solving scheme, and the leakage current integrated monitoring systems and digital electric leakage devices by status monitor conservation method will be proposed.
This paper informs the standard guideline of electrical inspection for the University laboratories and R&D institutes. A routine electrical inspection is there to prevent an electric shock and electrical fire accident in the Lab. The main issue of this paper is to check the problem of a routine electrical inspection and this paper provides a detailed guideline of a checklist for the Lab which do not have detailed instruction. It mentions the standard model of an effective routine inspection to upgrade the weak electrical environment in the Lab. One of the main purposes of this paper is to develop a routine checklist to control the electrical environment in the Lab. The evaluation checklist we develop will then be applied to every Lab. Introducing an electrical safety checklist builds a clear standard guideline for a real safety check. This will be used as a regular routine check-up for every Lab. The goal of this paper is to enforce safety from electrical accidents in the lab and it will provide safety guidelines for every Lab.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.