1 |
B.K.Kim, Y.S.Mok, K.W.LEE and D.H.Park "Insulation Test and Maintenance Method of High Voltage Cable", Journal of KEEA, pp.4-10, 2003.
|
2 |
KEC The Standard of Inspection Verdict, KECA, 2020.
|
3 |
Supervising Practice of Distribution and Transmission Line Installation, KEEA, 2002.
|
4 |
K.H.Moon, J.W.Kang and J.C.Kim, "Analysis of the cause of insulation breakdown in Transmission cable EB-A", Journal of 2011 KIEE Summer Conference, pp.511-512, 2011.
|
5 |
S.H.Hong, "A Study of the Cause of Burning Cable and Cable Flame Resisting Test Method", KDPA, Journal of Disaster Technology, Vol.51, pp.6-12. 2011.
|
6 |
S.Y.Oh, "Analysis of the Causes for Cable Fire and Improvement of the Systems", Yeonsei Uni., 2004.
|
7 |
J.H.Yoo, H.S.Kim, H.G.ee and Y.S.Cho, "A Study on Fire Investigation Technique For Single Line to Ground Faults in Distribution Line Using EMTP Simulation", Journal of the Korean Society of Safety, Vol.33, No.3, pp.21-26, 2018.
DOI
|
8 |
Avinash Chaudharya, "Characteristics of Power Cables in a Compartment", Procedia Earth and Planetary Science 11, pp.376-384, 2015.
DOI
|
9 |
S.M..Baek, J.W.Choi, S.H.Kim and Y.S.Kim, "Electrical Properties of 6.6kV Cable Termination by Mechanical Damage" Journal of KIEE Summer Conference, pp.1299-1300, 2009.
|
10 |
S.M.Park, H.N.Roh, S.S.Cho and H.H.Lee, "An Analysis on the Over-voltages by the Earth Fault in 22.9kV-Y Distribution Line", Journal of 1999 KIEE Summer Conference, pp.3126-3128, 1997.
|
11 |
H.K.Ji and Y.G.Cho, "Analysis of the Power Cable Fire Case in Busan-JungKwan Energy", Journal of KOSHAM, Vol.20, No.3 , pp.117-122, 2020.
|
12 |
The Inspection Verdict of Electrical Equipment Technology Standard, MOTIE, 2021.
|
13 |
The Commentary of Electrical Equipment Technology KEA, pp.95, 2016.
|
14 |
S.K.M, B.S.Bae, C.M.Kim, "The cause analysis of explosion on junction termination of 345kV cable", KESCO-ESRI, pp.63-79, 2010.
|
15 |
S.D.Kang, J.H.Kim, J.H.Kim, "A Study on the Insulation Resistance in Cable with Rising Temperature", Journal of the Korean Institute of Illuminating and Electrical Installation Engineers 32(3), pp.72-77, 2018.
DOI
|