A Study for Selecting the Plant Project Risk Management Check List (플랜트 PRM (Project Risk Management) 체크리스트 항목 선정을 위한 연구)

  • Choi, Doo-hoi;Bang, Hong-soon;Lee, Tae-hyeong;Kim, Ok-kyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.1
    • /
    • pp.54-64
    • /
    • 2018
  • Currently, as construction businesses develop and diversity, risk became one of the most crucial considerations. Risks are potential and difficult to predict by nature. Also, they are important as they influence delay in construction period and increase of project costs. In construction projects in South Korea and elsewhere, the importance of risk management widely recognized and relevant research is being conducted continuously. The companies use PRM checklist but apply different criteria and items. For efficient risk management in plants, plant PRM checklist is necessary. This study analyzed risk factors that are taken into account in construction projects and proposed a plant PRM checklist based on case analysis and opinions of experts. Also, it rated the frequency and importance of each risk.

Development of Integrated Cost and Schedule Management System using Work Package Concept for Efficient Project Management (Work package 개념을 활용한 현장의 공정관리와 공사비 통합관리 효율화 방안)

  • Kim, Yongpyo;Lee, Yongjun;Lee, Minjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.5
    • /
    • pp.32-40
    • /
    • 2017
  • Korean construction industry is facing downtime mood and need more productivity. In order to successfully accomplish the construction project with more productivity, systematic and reasonable schedule management techniques should be developed and utilized. Therefore, in this study, first, a current status of the schedule management in the construction site is identified and the improvements in the schedule management are suggested. And, the effective schedule management technique in the construction site is proposed based on the in-site experience of the researcher. In order to find solutions, survey questionnaires designed to measure the understanding of process management and measure perception of the importance of schedule management. Total twenty nine field engineers who are performing schedule management of construction project at domestic civil engineering construction site were participated in the survey, and In-depth interviews were conducted. Eleven construction sites are inspected. Finally, a simple and effective schedule management technique including from WSB classification to schedule analysis, performance management, and performance improvement is proposed based on the inspection of current status of schedule management in civil engineering construction site.

A fuzzy multi-criteria decision making methodology for small and medium enterprises evaluation under intersectional dependence relations (교차종속관계하에서의 중소기업 평가를 위한 Fuzzy 다기준의사결정법)

  • 박영화;이상완
    • Korean Management Science Review
    • /
    • v.14 no.1
    • /
    • pp.11-29
    • /
    • 1997
  • This paper presents the better efficient evaluation of the Small and Medium Enterprises by use of fuzzy multi-criteria decision making methodology under intersectional dependence relations. The five Small and Medium Enterprises alternative will be evaluated by Fuzzy Analytic Hierarchy Process(FAHP) based on entropy weight in this study. A case study is presented to illustrate the use of entropy weight measurement with intersectional dependence problems. These problems are evaluated seven criteria : market criteria, thchnology criteria, management ability criteria, planning criteria, propulsion ability criteria, project propulsion basis criteria, propulsion result criteria.

  • PDF

The development of integrated information system for the large scale cooperative R & D project (대단위 협력 연구개발 사업을 위한 통합정보시스템 구축)

  • Lee, Won-Joong;Kim, Ui-Jun
    • Aerospace Engineering and Technology
    • /
    • v.7 no.2
    • /
    • pp.38-45
    • /
    • 2008
  • It is challenging to build the integrated information system for a large scale cooperative R & D project. To develop the aircraft program which especially has several leading agencies and is supported by many demestic/foreign participating companies, the common data flow in harmony is the core factor to achieve a development goal. For this, the development are carried out maintaining the existing management systems of agencies and companies. As a first step, the standard for the common data information and the classification category of technical data are defined. Second, the work flow standards are also set. Based on the foundation, the efficient technical data management system are built including the function of storage, inquiry, revision, link, approval, submission, etc.

  • PDF

The Development of a National-scale Land use /Land cover Change Detection System in Taiwan

  • Chen, Chi-Farn;Wang, Ann-Chiang;Chang, Li-Yu;chang, Ching-Yueh;Lee, Pei-Shan;cheng, Chao-Yao
    • Proceedings of the KSRS Conference
    • /
    • 2003.11a
    • /
    • pp.567-569
    • /
    • 2003
  • Because of the limited land resources, an efficient land use management to reach the sustainable development policy has become an urgent call in Taiwan. A long-term project entitled 'National land use monitoring program-the establishment of a land use change detection system' has been jointly conducted by both National Central University and Ministry of Interior since year of 2001. The main aim of the project is to use the remote sensing images to detect the land use changes on a national scale. This plan has been put into practice and indeed provides an effective assistance for land management.

  • PDF

Scheduling of Matrix Organization for Software Development using Genetic Algorithm (유전자 알고리즘을 이용한 매트릭스조직의 소프트웨어 개발 스케쥴링)

  • Yang, Mi-Na;Lee, Gun-Ho
    • Korean Management Science Review
    • /
    • v.23 no.2
    • /
    • pp.187-198
    • /
    • 2006
  • Efficient scheduling for software development is a major concern for software engineers. Industries simultaneously try to perform a variety of projects with the limited resources on schedule. A way to overcome the limitation of resources is sharing of the resources through the projects. This study discusses the matrix organization for software development. A scheduling for matrix organization is a special case of project management problem. The ultimate goal of scheduling problem in this study is to minimize the overall duration of the multiple projects. A genetic algorithm is presented to solve the scheduling problem of the matrix organization and is substantiated with numerical results.

Development of An Information System for SOC Projects (SOC사업의 정보시스템 개발에 관한 연구 -원자력발전소건설 사업을 중심으로)

  • 윤은상;이화기
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.26 no.2
    • /
    • pp.46-54
    • /
    • 2003
  • SOC(Social Overhead Capital) projects such as road, power plant, airport or telecommunication facility construction require a large scale of cost, a long period of time and management of a number of sub-contractors. So systematic and efficient management tool in SOC projects is inevitable. Information system provides a valuable tool which can integrate and manage the large volume of information for SOC projects. This study investigates and analyzes the information system of nuclear power plant construction project. Based on this study, we can suggest the direction for designing information system for SOC projects.

Risk Based Decision Support for Final Closing Section of a Sea Dike

  • Jee, Sung Hyun;Kang, Seong Hae;Kim, Jeong Hwan;Seo, Jong Won
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.2
    • /
    • pp.49-57
    • /
    • 2013
  • A sea dike construction has been increased in Korea because of the actively deployed reclamation project in basis of efficient application in land. The degree of completion in sea dike construction is affected by final closing construction, which has a lot of uncertainty that often results in higher accidents rate. Therefore, this research identified risk factors of final closing construction and classified them. This research examines the likelihood and its impact for each risk factor and calculates the risk degree as to the risk matrix. Based on this, the impact and the environmental conditions that affect to risk factors are investigated and further responsive methods are established for each risk factor. Ultimately, this research attempts to provide the risk retrenchment method for inspectors by proposing risk estimation model, responsive action list, and risk management process.

Design of Checklist for Improvement of Reliability of Uncertainty and Variability Environment (불확실성 및 가변성 환경의 신뢰성 향상을 위한 체크리스트 설계)

  • Lee, Eun-Ser
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.3 no.10
    • /
    • pp.389-396
    • /
    • 2014
  • There are many defects when we're working on a project. Especially, if we don't have experience in similar field, defects have a strong influence on the system entirely. Therefore, management of risk such like defects is important the factor for success of project. Finally, efficient management of risk can guarantee handling problems such like fault tolerancy, unexpected quality and delay of schedule. In this paper, we propose checkpoint for improvement of reliability and are willing to improve the reliability of an entire system using it.

DECISION SUPPORT SYSTEM FOR OPTIMAL SELECTION OF HAUL ROUTES BASED ON TIME SLOTS IN EARTHMOVING OPERATION

  • Sang-Hyeok Kang;Kyeong-Geun Baik;Hyun-Gi Baek;Hyeong-Gi Park;Jong-Won Seo
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1134-1139
    • /
    • 2009
  • Haul routes for earthmoving operation need to be carefully selected because the decision on the haul routes could make a significant difference in the project's cost and time. This paper proposes a decision support system for improving productivity of earthmoving operation that helps construction managers choose the best haul routes of trucks based on time slots. Also, a methodology for optimal selection of haul routes considering traffic conditions and topographic conditions of the routes is explained. Raster data model is used to find an available shortest path based on cost weighted distance. A system was developed on a geographic information system environment for efficient database management and easy manipulation of graphical data. A real-world case study was conducted to verify the applicability of the proposed system.

  • PDF