A Study for Selecting the Plant Project Risk Management Check List  

Choi, Doo-hoi (Department of Architectural Engineering, Chungbuk University)
Bang, Hong-soon (Department of Architectural Engineering, Chungbuk University)
Lee, Tae-hyeong (Department of Architectural Engineering, Chungbuk University)
Kim, Ok-kyue (Department of Architectural Engineering, Chungbuk University)
Publication Information
Korean Journal of Construction Engineering and Management / v.19, no.1, 2018 , pp. 54-64 More about this Journal
Abstract
Currently, as construction businesses develop and diversity, risk became one of the most crucial considerations. Risks are potential and difficult to predict by nature. Also, they are important as they influence delay in construction period and increase of project costs. In construction projects in South Korea and elsewhere, the importance of risk management widely recognized and relevant research is being conducted continuously. The companies use PRM checklist but apply different criteria and items. For efficient risk management in plants, plant PRM checklist is necessary. This study analyzed risk factors that are taken into account in construction projects and proposed a plant PRM checklist based on case analysis and opinions of experts. Also, it rated the frequency and importance of each risk.
Keywords
Risk; Project Risk Management; Check List;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 Ahn, S. H. (2015). "A case study of the risk identification in construction project." Korean Journal of Construction Engineering and Management, KICEM, 16(1), pp. 15-23.   DOI
2 An, C. H. (2012). "A Decision Support Model for the Exchange Risk Management of Overseas Construction Project." Inha University Master's Thesis.
3 Bae, G. C. (2012). "An Analysis of the Importance of Risk Factors for Construction Project in North Korea-Base don Kae song In dustrial Complex." Hanyang University Master's Thesis.
4 Bang, H. S., Kim, J. K., Choi, B. J., and Kim, O. K. (2017). "A Basic Study for Selecting the Project Risk Management Check List." Journal of the Korean Institute of Building Construction, 17(1), pp. 99-100.
5 Choi, G. H. (2012). "Impact Analysis of Risk Factors on Performance in Overseas Construction - Focused on the Construction Cost, Construction Period, and Construction Quality -." Dongguk University Master's Thesis.
6 Go, Y. H. (2010). "Risk Management Improvements based on Small-Size Construction Case Studies of Small/Medieum Sized Construction Compainies." Chung-Ang University Master's Thesis.
7 Jang, W. S., Park, H. D., Jung, W. Y., and Han, S. H. (2009). "A Preliminary Study for Risk Management System Development in Overseas Plants Construction Projects." Proceedings of KICEM Annual Conference, KICEM, 9, pp. 863-868.
8 Jang, W. S., Hong, H. W., and Han, S. H. (2011). "Risk Identification and Priority method for Overseas LNG Plant Projects - Focusing on Design Phase -" Korean Journal of Construction Engineering and Management, KICEM, 12(5), pp. 146-154.   DOI
9 Jeong, J. H. (2012). "Establishment of contingency estimation system according to analysis about cost overrun risk of public construction project." Dong-A University doctoral thesis.
10 Kang, H. Y., Kim, M. S., Kim, S. H., and Kim, Y. S. (2012) " A Study on the Analysis of Risk Factors in Engineering, Procurement and Construction Phase for Overseas Plant Project." The Architectural Institute of Korea. 28(5) pp. 111-118.
11 Kim, M. (2014). "Risk process and management system gap in power plant overseas construction." Myongji University Master's thesis.
12 Lee, D. L. (2010). "Developing techniques for risk analysis and management of construction projects." Chungnam National University Master's Thesis.
13 Lee, T. W. (2014). "Research on the Importance and the Impacts of Risk Factors for Project Performance in Construction Industry." Hanyang University Master's Thesis.
14 Oh, G. L. (2012). "Analysis and Response of Risk Factors in A Turn Key Construction Contract." Pukyong National University doctoral thesis.
15 Pack, G. T. (2014). "Comparative Study on Construction Contracting Method for Mineral Resource Development Stag." Hanyang University Master's Thesis.
16 Pack, H. T., Song, C. B., and Kang, I. S. (2000). "Improvement of construction process control to reduce construction risk." Korean Journal of Construction Engineering and Management, KICEM, 1(1), pp. 35-44.
17 Pack, J. C. (2016). "Study of Risk Analysis for Bidding of Overseas Project According to Contract Condition." Hanyang University Master's Thesis.
18 Seo, Y. C. (2009). "${\circ}{\circ}$ system construction business risk management application example." Korean Journal of Construction Engineering and Management, KICEM, 10(4), pp. 29-32.
19 Woo, K. M., and Lee, H. K. (2005). "A study of the Risk Management on the Apartment Reconstruction Projects." Journal of the Architectural Institute of Korea, 21(12), pp. 175-182.
20 Seo, J. P. (2011). "Evaluation of Impact Assessment of the Cost Risk-Factor for the Design - Build Projects Based on FMEA." Soongsil University Master's thesis.
21 Yun, D. H. (2014). "An Assesment & Analysis of Risk Based on Accident Category for Container Terminals." Korea Shipping Logistics Association, 30(4), pp. 843-858.