Browse > Article
http://dx.doi.org/10.6106/JCEPM.2013.3.2.049

Risk Based Decision Support for Final Closing Section of a Sea Dike  

Jee, Sung Hyun (Kunwon Engineering Co., LTD., Research & Development Center)
Kang, Seong Hae (SK E&C Co., LTD.)
Kim, Jeong Hwan (Hanyang University, Dept. of Civil and Environmental Engineering)
Seo, Jong Won (Hanyang University, Dept. of Civil and Environmental Engineering)
Publication Information
Journal of Construction Engineering and Project Management / v.3, no.2, 2013 , pp. 49-57 More about this Journal
Abstract
A sea dike construction has been increased in Korea because of the actively deployed reclamation project in basis of efficient application in land. The degree of completion in sea dike construction is affected by final closing construction, which has a lot of uncertainty that often results in higher accidents rate. Therefore, this research identified risk factors of final closing construction and classified them. This research examines the likelihood and its impact for each risk factor and calculates the risk degree as to the risk matrix. Based on this, the impact and the environmental conditions that affect to risk factors are investigated and further responsive methods are established for each risk factor. Ultimately, this research attempts to provide the risk retrenchment method for inspectors by proposing risk estimation model, responsive action list, and risk management process.
Keywords
Final Closing Section; Sea Dike; Risk analysis; Decision Support;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 K.Y. Shin, H.S. Cha, "Risk-Based Performance Evaluation and Prediction Tool by Characterizing Construction Projects in Pre-Project Planning", Korean Journal of Construction Engineering and Management, vol. 9, no. 5, pp.168-175, 2008.   과학기술학회마을
2 O. Choi, J.W. Seo, B.J. Choi, H.H. Choi, "Risk-based Safety Impact Assessment Methodology for Construction Projects", journal of the Korean Society of Civil Engineers, vol. 25, no. 6D, pp. 847-855, 2005.   과학기술학회마을
3 L. Edwards, "Practical Risk Management in the Construction Industry", Thomas Telford, 1995.
4 S.H. Kang, "A Study for Construction Risk Management Method on Final Closing Section of the Sea Dike", M.S. Dissertation, Hanyang University, 2010.
5 I.H. Kim, "Risk Management in the Construction Projects", Ki Moon Dang, 2004.
6 K.H. Kim, J.S. Choi, S.H. Shin, C.H. Yang, "Analysis of the Risk Factors in Demolition", journal of Architectural Institute of Korea, vol. 24, no. 1, pp. 151-158, 2008.   과학기술학회마을
7 S.K. Kim, "Construction Risk Management", Ki Moon Dang, 2010
8 Korea Development of Farmland Laboratory, "A Study on Plan Damage Control and Optimum Section during Building a Breakwater", KDFL, 1995.
9 Korea Hydrographic Oceanographic Administration, www.khoa.go.kr.
10 Korea Meteorological Administration, www.kma.go.kr.
11 Korea Occupational Safety & Health Agency, www.kosha.or.kr.
12 Korea Rural Community Corporation, "A Study on Development of Safety Management System for Tidal Gate in Sae Man Keum", KRCC, 2006.
13 Ministry of Land, Transport and Maritime Affairs, www.mltm.go.kr.
14 Korea Rural Development Corporation, "Tideland Reclamation in Korea", Korea Rural Development Corporation, 1995.
15 J.S. Park, C.T. Hyun, T.H. Hong, S.H. Park, H.S. Moon, "Development of Checklist for Improving Constructability in Steel Structure Construction", journal of Architectural Institute of Korea, vol. 25, no. 12, pp.197-206, 2009.   과학기술학회마을
16 Project Management Institute, "A Guide to Project Management Body of Knowledge", The National Information Standards Organization, 2008.
17 D. Rothkopf, "Managing risk", The Swiss Banker Journal, vol. 4, no. 8, pp.73-80, 1975.