• Title/Summary/Keyword: Early Planning Phase

Search Result 68, Processing Time 0.03 seconds

Community Health Program Planning and Local Public Health System : The MAPP Model (지역사회보건기획과 지역보건체계 강화: MAPP 모형의 사례)

  • Kwak, Min-Son;Yoo, Seung-Hyun
    • Korean Journal of Health Education and Promotion
    • /
    • v.27 no.3
    • /
    • pp.59-66
    • /
    • 2010
  • Objectives: This paper aims to describe a public health planning model, Mobilizing for Action through Planning and Partnership(MAPP), and to discuss its application in Korea with a specific focus on the Local Public Health System (LPHS) component of MAPP. Methods: Literature content review was performed on research papers on MAPP development and application, MAPP handbook and guides, the guidelines for the 5th Phase Community Health Plan, and a research report on public health center evaluation system. Results: MAPP has been applied to public health planning (the 5th Phase Community Health Plan) and a performance evaluation system for public health center in Korea. The current application is limited to the early stages of the MAPP. Limited or partial application affects the integrity of the model. Follow-through should be strengthened especially for evaluation planning. Conclusion: Systems thinking approaches should be considered for the development of LPHS and strengthening logical and practical linkage between planning and evaluation of community health planning.

Road Construction Cost Estimation Model in the Planning Phase Using Artificial Neural Network (인공신경망을 적용한 기획단계의 도로건설 공사비 예측 모델)

  • Han, Hyeong Dong;Kim, Jeong Hwan;Yoon, Jung Ho;Seo, Jong Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.6D
    • /
    • pp.829-837
    • /
    • 2011
  • Construction cost estimation in planning phase which calculates the cost for performing construction tasks is used for various ways. Meanwhile, in the case of road construction, the existing cost estimating method in early phase based on numerical mean value of the past is not accurate to be used. This paper propose neural network model for estimating road construction cost in planning phase to solve the limit of current cost estimating method. The model was designed using past road construction bidding records, and variables of model were optimized through trial and error. The estimation result of the model was compared with regression analysis and government's standard and it was verified that the model is better in accuracy. It is expected that the proposed model will be used for road cost estimation in planning phase.

Mature and Bi-Sexual Phase Gonad Occurrence in Cultured Red Spotted Grouper, Epinephelus akaara

  • Hwang, In Joon;Min, Byung Hwa;Baek, Hea Ja
    • Development and Reproduction
    • /
    • v.24 no.3
    • /
    • pp.225-230
    • /
    • 2020
  • This study reports the presence of mature and bi-sexual phase gonads in red spotted grouper, Epinephelus akaara after less than a year of cultivation in a commercial indoor tank and a net cage. In December 2018, juveniles were placed in an indoor tank and cultured for five months. In June 2019, the fish were transferred to a net cage and cultured until September. The rearing temperatures ranged from 19.86℃-24.65℃ in the indoor tank and 21.86℃-27.65℃ in the net cage. During the net cage culture period, specimens were randomly selected for histological gonad examination. The highest gonadosomatic index (GSI) value was measured in July (3.38±2.53), and dramatically decreased in August (0.44±0.21) and September (0.42±0.30). In July, some mature fish showed signs of vitellogenic stage oocyte development (vitellogenic and oil droplet stage oocytes), but immature fish were in an early developmental stage containing peri-nucleolus stage (PNS) oocytes. Bi-sexual phase gonads containing spermatocytes and spermatids were observed in the lumen and several PNS oocytes. By August and September, most specimens showed early-stage ovary development. However, mature testis (in August) and bi-sexual phase gonads (in September) were also observed. These results provide evidence for early puberty and hermaphroditism in the red spotted grouper.

The Effect of Differentiated Instruction Design Model for Early Childhood on Development of Teacher's Professionalism (수준별 유아수업설계모형이 유아교사의 전문성 발달에 미치는 효과)

  • Kan, Jin-Sook;Keum, Mi-Suck;Lee, Ching-Chan
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.24 no.1
    • /
    • pp.56-78
    • /
    • 2012
  • This study which is an alternative exploration for improving the quality level of instruction considering the perception of the teachers in early childhood education field on instructional design is to develop Differentiated Instructional Design Model coincides with the purpose of differentiated instruction curricula and with instructional design principles, and to find out whether the model has significant effect on development of teacher's professionalism. With these purposes, the perception of 343 teachers from early childhood education institutions are investigated, and after component variables are set by drawing the instructional design model available in early childhood education field and reviewing the literature of differentiated instruction model, the Differentiated Instructional design Model for Early Childhood are developed based on FGI(Focus Group Interview) expert evaluation. The experimental study of 88 teachers working in childcare facilities was implemented for effectiveness verification. As a result, first, most teachers consider the priority on making the lesson plans as the development of early childhood and Kindergarten Educational Subjects, and they realize the development of instructional design model which contributes on lesson planning and implementation is much needed. Second, the Differentiated Instructional design Model for Early Childhood are developed, which consists of the cyclic process - pre-lesson phase, lesson implementation phase, and assessment phase -based on development characteristics of early childhood. Third, the experiment of the developed model showed that the scores of experimental group is significantly higher than those of comparative group in knowledge and technique development aspect, and self-understanding development aspect among the aspects of development of teacher's professionalism.

Technical Papers : Development of KOMPSAT-1 Scheduling & Automatic Command Plan Generator ( KSCG ) (기술논문 : 다목적 실용위성 1 호의 임무계획 및 자동 명령계획표 생성기 개발)

  • Kim,Hae-Dong;Choe,Hae-Jin;Kim,Eun-Gyu
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.30 no.1
    • /
    • pp.139-146
    • /
    • 2002
  • This paper describes the devlopment and implementation for the KOMPSAT-1 scheduling & automatic command plan generator(KSCG). Some problems in mission planning and command planning had occurred using the mission & command planning s/w in MAPS(Missin Analysis and Planning Subsystem) during the LEOP(Launch & Early Orbit Phase) & early normal mission phase due to lots of manual input process and non-automatic process. Therefore, the more mission operations for KOMPSAT-1. In order to prevent the development of new one(KSCG) which should reduce the manual process and generate automatically the command plan has been needed. As a result, the mission operations of KOMPSAT-1 has greatly became stable and more effient.

Development of Pre-workshop Phase for the VE application at the Early Planning Stage of the Mega Project (메가프로젝트 기획/계획단계 VE적용을 위한 준비단계 수행방안)

  • Ha, Seung-Ryong;Hyun, Chang-Taek;Son, Myung-Jin;Kim, Yun-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.4
    • /
    • pp.29-39
    • /
    • 2011
  • In Korea, many mixed-used development projects(MXD) in mega project size are currently active. As these mega projects require long-term construction and execution and involve by different subjects in different fields, their completion breeds various problems, such as conflicts among project participants due to their complicated interest relationships and inaccuracy in predicting the economic performance of the projects due to inappropriate facility capacity planning. To solve these problems, it is essential to apply value engineering (VE) at the planning phase of the project, which can result in the best possible cost reduction and improvement of project performance. However, not many projects are actually implementing VE because of the lack of available information, as well as the limitations due to uncertainty in the early period of project execution. Therefore, this study aimed at proposing VE Team Building, Quality Model Performance Indexes, Space Model so as to resolve common mega project problems and overcome VE application limitations at planning stage. The result of this study is expected that the data can be utilized as basic data to apply VE at the planning phase of the large complex projects.

Notification of Terminal Status and Advance Care Planning in Patients with Cancer

  • Lee, Si Won
    • Journal of Hospice and Palliative Care
    • /
    • v.25 no.1
    • /
    • pp.42-49
    • /
    • 2022
  • As population aging increases the burden of cancer, the quality of death of patients with cancer is emerging as an important issue alongside their quality of life. To improve the quality of death, it is necessary to prepare for death, allowing patients to die comfortably and with dignity at the end. Considering these issues, I aim to discuss the practical aspects of notifying the patient of the terminal phase of cancer and planning for end-of-life care (i.e., advance care planning). When cancer treatment that can extend the patent's lifespan becomes difficult, the patient enters a treatment transition period. Treatment is shifted from life-prolonging care to life-enhancing care, and end-of-life care must be well planned. Medical providers often worry too much about whether the patient will be disappointed or psychologically traumatized when notified of the terminal phase of their cancer, thus delaying plans for end-of-life care. In fact, patients can accept their condition and prepare for end-of-life care better than we expect. During the treatment transition period, notification of terminal status should be given, and a well-prepared advance care plan should be established early when the patient has decision-making ability. In addition to conveying information, it is always necessary to be sensitive to whether the patient and caregiver understand the information and respond to their emotions.

Mission Operations of the KOMPSAT-1 satellite

  • Kim, Hae-Dong;Kim, Eun-Kyou;Park, Hae-Jin
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2001.10a
    • /
    • pp.92.5-92
    • /
    • 2001
  • The KOMPSAT-1(Korea Multi-Purpose Satellite-1) is the first multi-purpose satellite funded by Korean government for the purpose of remote sensing and scientific data gathering in KOREA. It has successfully achieved its own mission since Dec. 21, 1999. This paper provides an overview of the KOMPSAT-1 missions and addresses the nominal mission planning and operation flow. This paper also describes the routine operational orbit determination and orbit prediction process using GPS navigation solution data. Meanwhile, some problems due to inexperience of the multiple mission operations during LEOP(Launch & Early Orbit Phase) and early normal mission were investigated. Then, resolutions that include the development of new mission planning tool are addressed. The KOMPSAT-1´s missions become more complicated rather than its Initially designed ones. In order to accomplish ...

  • PDF

A Basic Study on the BIM Service Based SLA for Setting the Application Level of BIM in the Procurement Phase (발주단계에서 BIM의 적용수준 설정을 위한 SLA 기반의 BIM 서비스에 관한 기초연구)

  • Kim, Ji-Yun;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.251-252
    • /
    • 2016
  • Recently policy and clouding system to mandate the introduction of BIM in construction industry, various sensors technology, BIM in ICT technology and fusion, such as 3D scanning and printing technology has been further activated. However, the expression level of diversification associated with it, plan within one of the BIM project, design, engineering, it is difficult to have a different application has been consistent for each field, such as construction. Thus fell the efficiency of BIM apply, it is difficult to determine the appropriate level of BIM in the business early stage in order destination of position. In this study, in order to solve this problem, by utilizing SLA used in the IT field, it attempts to explore scheme which can be evaluated targeted level of BIM suitable for business in the planning phase.

  • PDF

Web-Based Cost Planning Program for High-Rise Office Building (고층 사무소건축의 공사비계획을 위한 웹 기반 개산견적 프로그램)

  • Kim Ki-Hong;Park Chan-Sik;Chang Sun-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.2 s.24
    • /
    • pp.69-79
    • /
    • 2005
  • The Purpose of cost Planning at the early Phase of construction Projects is to provide the clients with the appropriate cost information during the design decision-making process. Therefore, the cost planning process is expected not only to predict projects' cost accurately but also closely to coordinate with the design decision-making activities. This paper proposes a new cost planning method for the effective and efficient directions relating a design decision-making process. Strategies for this method are i ) to utilize elemental cost breakdown system, and ii ) to apply probabilistic distribution theories. Based on these strategic direction, this paper proposed a probabilistic cost planning model for high-rise office building projects. The suggested model provides appropriate cost information to meet clients limited budget and various project' requirements during the design decision-making process. This study is based on probabilistic distribution variables theories and the range estimating technique. This study also develops a web-based software program in order to apply the proposed cost planning model effectively in high-rise of office building construction practices.