Web-Based Cost Planning Program for High-Rise Office Building  

Kim Ki-Hong ((주)경원건축사무소)
Park Chan-Sik (중앙대 건축학과)
Chang Sun-Ho ((주)경원건축사무소)
Publication Information
Korean Journal of Construction Engineering and Management / v.6, no.2, 2005 , pp. 69-79 More about this Journal
Abstract
The Purpose of cost Planning at the early Phase of construction Projects is to provide the clients with the appropriate cost information during the design decision-making process. Therefore, the cost planning process is expected not only to predict projects' cost accurately but also closely to coordinate with the design decision-making activities. This paper proposes a new cost planning method for the effective and efficient directions relating a design decision-making process. Strategies for this method are i ) to utilize elemental cost breakdown system, and ii ) to apply probabilistic distribution theories. Based on these strategic direction, this paper proposed a probabilistic cost planning model for high-rise office building projects. The suggested model provides appropriate cost information to meet clients limited budget and various project' requirements during the design decision-making process. This study is based on probabilistic distribution variables theories and the range estimating technique. This study also develops a web-based software program in order to apply the proposed cost planning model effectively in high-rise of office building construction practices.
Keywords
Cost Planning; Web-Based Program; Range Estimating; Design Decision-Making;
Citations & Related Records
연도 인용수 순위
  • Reference
1 박찬식, 장선호, 김기홍, '설계의사결정과정에서의 확률적 공사비계획 모델', 대한건축학회 논문집, 구조계, 19권, 11호, p.p. 181-189, 2003. 11
2 Curran, Michael W., 'Range Estimating-Measuring Uncertainty and Reasoning with Risk', Cost Engineering, 31(3), AACE, p.p. 18-26, 1989. 3
3 Ferry, Douglas J. & Brandon, Peter S., Cost Planning of Buildings, 6th ed., BSP Professional Books, 1991
4 Uher, Thomas E., 'A Probabilistic Cost Estimating Model', Cost Engineering, 38(4), AACE, p.p. 33-40, 1996. 4
5 Kim, Yongsu, The Development and Application of a Probabilistic Model for Risk Analysis of Life Cycle Cost Predictions, Ph.D. Thesis, The University of New South Wales, 1994
6 윤창식, 김예상, '원가요소의 특성을 고려한 오피스 건물 개 산견적 모델 개발에 관한 연구', 대한건축학회 논문집, 구조계, 16권, 12호, p.p. 163-174, 2000. 12
7 이학기, 강병희, '고층사무소 건물의 공사비 예측기법의 개발 에 관한 연구', 대한건축학회 논문집, 11권, 9호, p.p. 257- 267, 1995. 9
8 신현익, 권성욱, 최무혁, '사무소건축의 경제적 적정규모 계 획방법에 관한 연구', 대한건축학회 논문집, 계획계, 17권, 11 호, p.p. 153-164, 2000. 11
9 전재열, '실적자료 분석에 의한 건축공사비 산정 방법 적용에 관한 연구', 대한건축학회 논문집, 구조계, 18권, 4호, p.p. 121-128, 2002. 4
10 홍영배, 사무소건축 프로젝트 기획단계에서의 공사비계획 모 델에 관한 연구, 중앙대학교 박사학위논문, 1999
11 Back, W. Edward, Boles, Walter W. & Fry, Gary T., 'Defining Triangular Probability Distributions from Historical Cost Data', Journal of Construction and Management, 126(1), ASCE, p.p. 29-37, 2000. 2   DOI   ScienceOn
12 홍성휘, 사무소건축의 공사비 예측모델에 관한 연구, 명지대 학교 박사학위논문, 1999
13 최인성, 홍성휘, 손창백, 고석철, 'SRC조 고층 오피스 건축공 사의 공사비예측모델에 관한 연구', 대한건축학회 논문집, 15 권, 7호, p.p. 143-150, 1999. 7
14 김기홍, 건축 프로젝트 기획단계의 설계의사결정을 위한 확률적 공사비계획 모델-고층 사무소건축을 중심으로-, 중앙대학 교 박사학위 논문, 2003. 12