• 제목/요약/키워드: Design project

검색결과 4,021건 처리시간 0.032초

Suggestion and Verification of Assessment model on Construction-Cost of Steel Bridge in Project Performance Phases

  • Kab-Soo Kyung;Hye-Yeon Park;Sin-Hwa Kang;Eun-Kyoung Jeon
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.606-615
    • /
    • 2009
  • Estimating the reasonable construction-cost according to the construction phase in public construction is an important element for securing and executing a national budget efficiently. As a general rule, the predetermined cost of construction is estimated at the end of the design of the target structure. Therefore, it seems to be a considerably difficult problem to estimate the approximate cost of construction, only with its basic information of the bridge in the design planning phase and the early design stage where we can not have specific detailed-section of the target structure. In this paper, we present the calculation of construction-cost in the planning phase based on the analysis of factors affecting the cost of construction conducted in the previous study. Beside, to estimate the cost of construction in early design phase, we would like to present the calculation of construction-cost in the early design phase by executing the analysis of data collected from 61 steel box bridges. It was found from the result of study that the estimated cost of construction gained by the calculation of construction-cost in this paper reduces the error between the real cost of construction and that by the existing method of using.

  • PDF

DEVELOPMENT OF ARCHITECTURAL DESIGN QUALITY CONTROL REQUIREMENTS BASED ON OPEN BIM

  • Inhan Kim;Jungsik Choi;Junho Choi
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.426-432
    • /
    • 2013
  • The construction industry consists of various and massive architectural information as an architectural process includes a variety of design stages with cooperation of many disciplines. Particularly, architectural information is generated and managed through the life cycle of a building, from conceptual design stage to the construction and maintenance. A Building Information Model (BIM) serves as a shared knowledge resource for information about a facility forming a reliable basis for decisions during its life-cycle from inception onward. BIM technology accomplished quantitative development being utilized in various disciplines. However, it is necessary to develop environment and requirement for qualitative improvement of BIM based project. Particularly, requirement is very important for architectural design evaluations. The purpose of this study is to develop and apply of quality control requirement for improving the quality of architectural design in open BIM environments. To achieve this purpose, the authors have investigated case study for open BIM data quality control (software, guideline and application case) and classified quality control targets according to physical/logical quality and data quality. In addition, the authors have defined open BIM based quality control process and developed quality control requirements. Finally, the authors have developed rule based quality check system using requirements for efficient quality control based on open BIM.

  • PDF

공공디자인사업 수행 프로세스의 구조적 특성에 관한 연구 (The Structural Characteristics of Work Processes in Public Design Projects)

  • 박수경;문정민
    • 한국실내디자인학회논문집
    • /
    • 제22권3호
    • /
    • pp.145-153
    • /
    • 2013
  • Since a government design department office was set up in 2007, active design projects have been implemented. With this opportunity, each local self-governing organization has improved its administration and institutions, and are planning intensive research on public design for efficient execution of public design projects. However, recent public design projects have caused many problems due to unspecialized design processes, a lack of cooperation with relevant organizations, and unsatisfactory management systems after projects. Therefore, to overcome such problems in the execution of public design projects, a procedure-centered model should be developed. This study aims to analyse the process structures for the strategic execution of public design projects, and the methods and content of the execution process. For this purpose, this study looked into the process structures of public design projects based on design management strategies in order to draw suggestions needed for the execution process through advanced cases. The study is summed up as follows: First, when the process of public design projects was examined in terms of management strategies and design management strategies, it included two dimensions: the management structure of general projects and the design of development projects. Secondly, through the analysis of public design cases, this study discovered useful methodologies and the main programs used and drew suggestions needed for each step in public design projects. It is expected that the results of this study will be helpful for the development of a process model appropriate for national public design projects based on the current status of the project execution and to make a contribution to systematic development in national public design.

린 프로세스 기반 아웃리거 시스템의 Set-based Design 적용 방안에 관한 연구 (A Study on the Application Methodology of Set-based Design Approach of Outrigger System based on Lean Process)

  • 이승일;조영상
    • 한국건설관리학회논문집
    • /
    • 제12권4호
    • /
    • pp.50-58
    • /
    • 2011
  • 린은 고객이 정하는 가치를 정의하고 가치의 흐름에 방해되는 불필요하고 낭비되는 요소를 없애는 과정을 기본으로 하는 경영철학이다. 생산관리에서 출발한 린이라는 경영철학은 건설 산업에서“린 건설”이라는 이름으로 건설단계에서 시작되었으며 이제는 생산성 향상을 효과적으로 이룰 수 있는 설계단계로의 확장이 필요한 시점이다. 현재 국내의 구조설계업무방식은 순차적 공학 개념의 Point-based Design 방식으로 설계자의 경험과 판단에 의존하여 초기 설계안을 결정하고 이후 상세설계를 진행하는 과정으로 설계업무가 진행되었다. 이에 반해 동시공학 개념의 Set-based Design 방식은 전체 프로젝트 관점에서 낭비요소를 없애고 프로젝트 생산성 향상을 위해 다양한 설계안을 제한된 범위 내에서 바로 선택하지 않고 더 확실한 정보가 나올 때까지 설계안의 선택을 유보하여 합리적이고 경제적인 설계안을 결정하는 린 기반의 설계 프로세스이다. 본 연구에서는 전통적인 구조설계방식에 대해 SBD방식을 도입하고, SBD프로세스의 의사결정기법으로 계층화분석법(AHP)을 적용하여, 후행업무단계들에 대한 사전 고려로 프로젝트 전체 관점에서의 낭비를 최소화하고 생산성을 향상할 수 있는 설계 방법론을 제안하고 하고자 한다. 이를 위해 PBD와 SBD방식에 대한 분석 및 의사결정방안을 모색하였고, 제안된 SBD프로세스의 사례연구를 통해 실무에서의 활용방안을 제시하였다.

프랭크 로이드 라이트 작품에 나타난 토탈디자인 개념에 관한 연구 (A Study on the Total Design Concept shown in the Works of Frank Lloyd Wright)

  • 서수경
    • 한국실내디자인학회논문집
    • /
    • 제25호
    • /
    • pp.229-235
    • /
    • 2000
  • Although Frank Lloyd Wright represents himself as one of the greatest American master architect, the master architects contribution towards the advancement in the modern history of architecture goes beyond just creating landmark buildings. Through out his life, he was the leading architect not only in the area or architectural design but showed his talent in interior architecture, furniture, fabric, lighting fixture, art glasses, tablewares, silver wares as well as in graphic design which should cover all the elements related to the "total design" in architecture. As seen in his architectural design, the "total design" concept also reflects both beauty and logic of the nature and strengthens his theory of the organic architecture design. The research began with finding out the relationship between his architecture, nature and the supporting design elements mentioned above. the purpose of the research is to analyze the relationship of the spatial organization and the design elements in Frank Lloyd Wrights architectural works from the point of "total design" view and provide the valuable guide line for the development of the modern interior design. His design theory, based on the fundamental ideas of the nature, his organic architecture design, and reference materials to support total design concept will be discussed on chapter 2. And on chapter 3, application of the total design in his actual project will be analyzed. The data and analyzation have been completed based on written references and actual visit to the project sites. Frank Lloyd Wright placed highest value on the human beings and enjoyed presenting new ideas and forms to create better environment for the humans through his architecture and interior design projects. While he was presenting new ideas he continued to support design for democracy which has close relationship to the new frontier spirit of America. He was the master architect for the general society with accurate understanding of the life style of the public with design sensitivity shown in his concept of the total design.s concept of the total design.

  • PDF

턴키 프로젝트에서 리스크요인 분석 및 정량적 평가 (Analysis and Quantitative Estimation of Risk Factors of Design-Build)

  • 오국열;이영대
    • 한국건설관리학회논문집
    • /
    • 제13권5호
    • /
    • pp.12-24
    • /
    • 2012
  • 턴키계약방식(Design Build)은 설계시공 일괄계약방식으로 책임 한계가 보다 광범위하게 적용되어 프로젝트 수행 초기 설계 단계부터 설계비 부담 증가 등 일반 분리발주공사 보다 리스크 발생율이 높은 실정이다. 따라서 이번 연구에서는 턴키계약프로젝트에서 리스크요인의 분석 및 정량적 평가 방안을 연구하였다. 이 번 연구는 프로젝트참여자로부터 수집한 설문조사자료를 이용하여 통계분석을 수행한 결과 총145개의 리스크변수중 전체 참여자 그룹이 동의하는 DB프로젝트에서의 리스크변수는 25개로 나타났다. 요인분석을 통하여 이를 8가지 리스크요인으로 함축할 수 있었으며 이중 3가지 요인인 건설현장관련, 계약관련 및 설계관련 리스크요인이 72%의 가중치를 나타내었다. 리스크변수 및 리스크요인에 따른 가중치와 결합확률을 이용하여 리스크요인에 기인한 추정손실의 크기를 전체공사비에 대한 백분율로 추정한 결과 약 6%로 나타났고, 리스크 요인상호영향을 고려하면 약 10%를 나타나 리스크대응을 위하여 전체공사비의 약 6%~10%의 예비비를 계상할 필요가 있는 것으로 나타났다.

버즈 두바이 콘크리트 건물의 설계와 시공 (Design and Construction of the Burj Dubai Concrete Building Project)

  • Abdelrazaq, Ahmad
    • 콘크리트학회지
    • /
    • 제20권6호
    • /
    • pp.28-35
    • /
    • 2008
  • 700미터 이상의 높이와 160층 이상으로 설계된 버즈두바이가 완공되면 버즈두바이는 인간이 건축한 건축물 중에서 최고높이의 건축물이 될 것이다. 바람의 동적효과를 완화하고 제어시키는 것이 가장 중요한 설계요소중의 하나이며, 설계초기의 공기역학적 형상과 풍공학에 대한 고려가 이러한 주상복합건물의 건축적 형상 및 디자인에 있어 큰 역할을 하는 반면, 건물의 구조시스템을 위한 재료 선택 또한 디자인의 중요한 요소이고 그 다음으로 세부적인 재료기술에 대한 평가 및 기술자 수급이 요구되어진다. 콘크리트는 콘크리트의 강도, 강성, 감쇠, 잉여력, 형틀성, 내화성, 시공성, 원가 등을 고려하여 선정된다. 이 논문은 콘크리트를 활용한 구조시스템을 적용하면서의 설계적으로 도전되었던 부분과 버즈두바이의 콘크리트공사의 초기계획에 대해 집중적으로 다룰 것이다.

사용자 참여설계를 통한 교실공간계획에 관한 연구 - 인천광역시 학교공간 혁신사업 사례를 중심으로 - (A Study on the Classroom Space Planning through User Participation Design - Focusing on the case of School Space Innovation Project in Incheon -)

  • 손석의;김승제
    • 교육시설 논문지
    • /
    • 제28권4호
    • /
    • pp.11-17
    • /
    • 2021
  • This study is aimed at presenting an efficient management plan of user participatory design in a situation where the School Space Innovation Project is in progress. 2 schools that were the targets of the Incheon School Space Innovation Project in 2019 were selected for this, and features such as the physical environment of that classroom, classroom usage plan, and the stepwise outcome of the user participatory design workshop were contemplated. Especially the workshop outcome was compared and analyzed quantitatively, focusing on the actual master plan and zoning plan, in order to identify the feature that opinions of various users are reflected on the actual plan. As a result, the following conclusion could be reached. Firstly, it was confirmed that the expression about the user preferential space influences the classroom usage plan of that classroom. Vague expressions about the whole space held a large majority of the objects for the linguistic expression of the preferential space. The expression mode as limited as the expression of the actions that users want to carry out in the space. On the other hand, when the usage purpose of the classroom was definite, it was confirmed that the demand for furniture·facility is relatively high. Secondly, according to the analysis of zoning for each function, it seems that the stereotype, which is arranged on the basis of the chalkboard at the front of existing classrooms, was applied in the case of the learning zone. However, in cases of other functions, a tendency was identified that the user carries out an image description that reflects the physical features of the space. Sufficient preparation will need to precede for the efficient management of the user participatory design workshop and the acceptance of various opinions. It seems that especially the classroom usage plan, number of workshops, consultation of each step, and the education about the space expression mode affect the master plan.

시공책임형 CM 사업의 GMP 결정를 위한 시공이전단계 설계VE 프로세스 적용방안 도출 (A Study on the Application of Design VE Process in Pre-Construction Phase for GMP Determination of CM at Risk Project)

  • 박보성;김옥규
    • 한국건설관리학회논문집
    • /
    • 제23권5호
    • /
    • pp.56-64
    • /
    • 2022
  • 정부의 건설산업 혁신방안 중 기술혁신을 위한 주요과제의 하나인 시공책임형 CM 사업의 제도화를 위해 2017년부터 현재까지 시범사업이 활발하게 이루어지고 있지만, 시공이전단계 사업관리의 핵심인 GMP를 결정하는데 핵심도구인 설계VE와 관련한 기준 및 프로세스는 아직 정립되지 않은 실정이다. 이에 시공책임형 CM과 설계VE 관련 연구 및 운영실태, 그리고 사업참여자 인식조사를 통해 기존 설계VE 프로세스에 대한 문제점을 도출하고, 시공책임형 CM 사업에 적합한 설계VE 프로세스를 제안하고자 하였다. Schedule, Cycle, Process 등 3가지 측면에서 적용안을 제안하였으며 심층면접조사(FGI)를 통해 적절성과 적용성을 검증하였다. 본 연구의 결과는 향후 이루어질 발주기준 정립 및 법제화에 대한 기초자료로 활용될 수 있을 것으로 기대한다.

스마트시티 프로젝트 평가체계에 대한 연구: IFEZ 스마트시티 사례분석을 중심으로 (A Study on Smart City Project Evaluation System: Focusing on Case Analysis of IFEZ Smart City)

  • 이상호;조희연;민윤홍
    • 한국빅데이터학회지
    • /
    • 제8권1호
    • /
    • pp.83-97
    • /
    • 2023
  • 프로젝트의 평가란 프로젝트의 진행상황과 결과물을 평가하는 과정이다. 스마트시티 프로젝트들은 시스템 구성요소별(인프라, 서비스, 플랫폼)로 프로젝트가 나뉘기도 하고, 여러 가지 서비스별로 프로젝트들이 동시에 진행되기도 한다. 또한 추가 프로젝트를 통하여 서비스들이 개발되고 확장되기도 한다. 이렇게 여러 가지 프로젝트들이 복합적으로 진행되는 스마트시티가 목표 및 전략에 맞추어 진행되기 위해서는 프로젝트를 수행하는 과정에서 주기적인 프로젝트 평가가 필요하다. 본 논문이 제안한 스마트시티 프로젝트 평가체계는 스마트시티의 기획, 설계, 구축 및 운영의 전 단계에서 발생하는 프로젝트에 대해서 반드시 고려해야 할 다양한 요소를 반영하여 종합적이고 객관적인 지표를 제공하도록 설계되었다. 평가체계로부터 도출된 지표는 의사결정자가 스마트시티 프로젝트 개발 방향을 결정하는데 사용될 수 있다. 또한 프로젝트의 종료 이전에도 프로젝트의 성과를 중간 평가하고 이로부터 얻은 피드백을 반영할 수 있도록 설계하였다. 본 연구가 제안한 스마트시티 프로젝트 평가체계의 적용 방법을 소개하기 위해 인천경제자유구역청(IFEZ)의 스마트시티 프로젝트 사례에 개발된 평가체계를 적용하였다. 또한 평가결과를 바탕으로 스마트시티 프로젝트 항목별 개선효과를 극대화할 수 있는 항목을 제시함으로써 스마트시티 프로젝트 추진 방향을 제시하였다. 여러 가지 프로젝트들이 복합적으로 진행되는 스마트시티 프로젝트의 특성을 반영한 스마트시티 프로젝트 평가체계를 활용함으로써 스마트시티 프로젝트의 종합적인 계획 및 관리가 가능할 것이며, 프로젝트의 우선적인 개선 요소를 파악하는 데 본 연구가 참고가 될 것이다.