1 |
Thomas L. Saaty(1990). "How to make a decision: The Analytic Hierarchy Process", European Journal of Operational Research 48, pp. 9-26
DOI
ScienceOn
|
2 |
Glenn Ballard(2000). "Lean Project Delivery ", Lean Construction Institute: Research Agenda
|
3 |
Kristen Danielle Parrish(2009). "Applying a Set-based Design Approach to Reinforcing Steel Design", Ph.D. Dissertation, Department of Civil and Environmental Engineering University of California, Berkeley
|
4 |
John-Michael Wong, Kristen Parrish(2007)." Communication and Process Simulation of Set-based Design for Concrete Reinforcement.", Proceedings of the 2007 Winter Simulation Conference, pp. 2057-2065
|
5 |
Durward K Sobek II, Allen C Ward, Jeffrey K Liker(1999). "Toyota's Principles of Set-based Concurrent Engineering", Sloan Management Review, pp. 67-83
|
6 |
Thomas L. Saaty(2008). "Decision Making with the Analytical Hierarchy Process", International Journal of Services Sciences, Vol. 1, No. 1, pp. 83-98
DOI
ScienceOn
|
7 |
배대원(2007). "SOM 알고리즘을 고려한 보강판의 Set-based Design", 석사학위논문, 서울대학교 대학원, 조선해양공학과
|
8 |
김용우, 김광호(2008). "린 건설 관리 방식의 공사 전 설계 진행에 관한연구", 한국의료복지시설학회지, 제14권 제4호, pp. 47-54
|
9 |
김대용(2007), "효율적 설계프로세스 관리를 위한 린 기반의 개념적 모델 제시", 대한건축학회 논문집, 제23권 제4호, pp. 121-129
|
10 |
이동운, 김영수(2003). "Fuzzy AHP 기법을 이용한 건설공사의 코스트 리스크 분석에 관한 연구", 대한건축학회 논문집, 제19권 제14호, pp. 169-176
|
11 |
이상민(2010). "Flat-Plate 시스템의 연쇄붕괴 성능평가에 관한 연구", 석사학위논문, 한양대학교 대학원, 건축환경공학과
|
12 |
배준서(2010)." 구조BIM 환경에서Set-based 설계방법론을적용한 플랫 플레이트의 철근배근 설계", 석사학위논문, 한양대학교 대학원, 건축환경공학과
|
13 |
이승일, 권남하, 조영상(2010)." BIM기반골조공사의시공성분석 업무 적용사례에 관한 연구", 한국건축시공학회 논문집, 제10권 제5호, pp. 45-54
|
14 |
Eastman C, Teicholz P, Sacks R, Liston K(2007). "BIM Handbook-A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers, and Contractors", John Wiley & Sons, Inc.
|
15 |
Paul M. Teicholz(2003). "Why Construction Industry Productivity ins Declining", ENR: Engineering News Record. May 12
|