• Title/Summary/Keyword: Design project

Search Result 4,026, Processing Time 0.03 seconds

Suggestion and Verification of Assessment model on Construction-Cost of Steel Bridge in Project Performance Phases

  • Kab-Soo Kyung;Hye-Yeon Park;Sin-Hwa Kang;Eun-Kyoung Jeon
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.606-615
    • /
    • 2009
  • Estimating the reasonable construction-cost according to the construction phase in public construction is an important element for securing and executing a national budget efficiently. As a general rule, the predetermined cost of construction is estimated at the end of the design of the target structure. Therefore, it seems to be a considerably difficult problem to estimate the approximate cost of construction, only with its basic information of the bridge in the design planning phase and the early design stage where we can not have specific detailed-section of the target structure. In this paper, we present the calculation of construction-cost in the planning phase based on the analysis of factors affecting the cost of construction conducted in the previous study. Beside, to estimate the cost of construction in early design phase, we would like to present the calculation of construction-cost in the early design phase by executing the analysis of data collected from 61 steel box bridges. It was found from the result of study that the estimated cost of construction gained by the calculation of construction-cost in this paper reduces the error between the real cost of construction and that by the existing method of using.

  • PDF

DEVELOPMENT OF ARCHITECTURAL DESIGN QUALITY CONTROL REQUIREMENTS BASED ON OPEN BIM

  • Inhan Kim;Jungsik Choi;Junho Choi
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.426-432
    • /
    • 2013
  • The construction industry consists of various and massive architectural information as an architectural process includes a variety of design stages with cooperation of many disciplines. Particularly, architectural information is generated and managed through the life cycle of a building, from conceptual design stage to the construction and maintenance. A Building Information Model (BIM) serves as a shared knowledge resource for information about a facility forming a reliable basis for decisions during its life-cycle from inception onward. BIM technology accomplished quantitative development being utilized in various disciplines. However, it is necessary to develop environment and requirement for qualitative improvement of BIM based project. Particularly, requirement is very important for architectural design evaluations. The purpose of this study is to develop and apply of quality control requirement for improving the quality of architectural design in open BIM environments. To achieve this purpose, the authors have investigated case study for open BIM data quality control (software, guideline and application case) and classified quality control targets according to physical/logical quality and data quality. In addition, the authors have defined open BIM based quality control process and developed quality control requirements. Finally, the authors have developed rule based quality check system using requirements for efficient quality control based on open BIM.

  • PDF

The Structural Characteristics of Work Processes in Public Design Projects (공공디자인사업 수행 프로세스의 구조적 특성에 관한 연구)

  • Park, Su-Kyoung;Moon, Jeong-Min
    • Korean Institute of Interior Design Journal
    • /
    • v.22 no.3
    • /
    • pp.145-153
    • /
    • 2013
  • Since a government design department office was set up in 2007, active design projects have been implemented. With this opportunity, each local self-governing organization has improved its administration and institutions, and are planning intensive research on public design for efficient execution of public design projects. However, recent public design projects have caused many problems due to unspecialized design processes, a lack of cooperation with relevant organizations, and unsatisfactory management systems after projects. Therefore, to overcome such problems in the execution of public design projects, a procedure-centered model should be developed. This study aims to analyse the process structures for the strategic execution of public design projects, and the methods and content of the execution process. For this purpose, this study looked into the process structures of public design projects based on design management strategies in order to draw suggestions needed for the execution process through advanced cases. The study is summed up as follows: First, when the process of public design projects was examined in terms of management strategies and design management strategies, it included two dimensions: the management structure of general projects and the design of development projects. Secondly, through the analysis of public design cases, this study discovered useful methodologies and the main programs used and drew suggestions needed for each step in public design projects. It is expected that the results of this study will be helpful for the development of a process model appropriate for national public design projects based on the current status of the project execution and to make a contribution to systematic development in national public design.

A Study on the Application Methodology of Set-based Design Approach of Outrigger System based on Lean Process (린 프로세스 기반 아웃리거 시스템의 Set-based Design 적용 방안에 관한 연구)

  • Lee, Seung-Il;Cho, Young-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.4
    • /
    • pp.50-58
    • /
    • 2011
  • Lean concept is management philosophy that defines a customer's value and eliminates wasteful and impeditive factors. Management philosophy of Lean in the construction industry is referred to as "Lean Construction". Now this concept has expanded to achieve effective productivity during the design phase. Currently the norm of the domestic design process has been Point-based Design(PBD). It involves selecting a single structurally-feasible design option early and then refining that single design as more information becomes available throughout the design process. This single design is then re-worked until a solution is found that is feasible for all parties. On the contrary, Set-based Design(SBD) is based on lean processes to eliminate waste and improve project productivity. It focuses on keeping the design space as open as long as possible, to allow "subdesign" to advance and not labeling them as secondary in importance. Preserving the maximum number of feasible designs as long as possible reduces the likelihood that rework will be necessary and allows all project participants to utilize their unique expertise to make the project successful. This study proposes that the design methodology of minimizing waste and increasing productivity through SBD of AHP, one of the decision making process so as to compare PBD with SBD and tries to find decision making process and then suggest that application methodology through performs case study of SBD process.

A Study on the Total Design Concept shown in the Works of Frank Lloyd Wright (프랭크 로이드 라이트 작품에 나타난 토탈디자인 개념에 관한 연구)

  • 서수경
    • Korean Institute of Interior Design Journal
    • /
    • no.25
    • /
    • pp.229-235
    • /
    • 2000
  • Although Frank Lloyd Wright represents himself as one of the greatest American master architect, the master architects contribution towards the advancement in the modern history of architecture goes beyond just creating landmark buildings. Through out his life, he was the leading architect not only in the area or architectural design but showed his talent in interior architecture, furniture, fabric, lighting fixture, art glasses, tablewares, silver wares as well as in graphic design which should cover all the elements related to the "total design" in architecture. As seen in his architectural design, the "total design" concept also reflects both beauty and logic of the nature and strengthens his theory of the organic architecture design. The research began with finding out the relationship between his architecture, nature and the supporting design elements mentioned above. the purpose of the research is to analyze the relationship of the spatial organization and the design elements in Frank Lloyd Wrights architectural works from the point of "total design" view and provide the valuable guide line for the development of the modern interior design. His design theory, based on the fundamental ideas of the nature, his organic architecture design, and reference materials to support total design concept will be discussed on chapter 2. And on chapter 3, application of the total design in his actual project will be analyzed. The data and analyzation have been completed based on written references and actual visit to the project sites. Frank Lloyd Wright placed highest value on the human beings and enjoyed presenting new ideas and forms to create better environment for the humans through his architecture and interior design projects. While he was presenting new ideas he continued to support design for democracy which has close relationship to the new frontier spirit of America. He was the master architect for the general society with accurate understanding of the life style of the public with design sensitivity shown in his concept of the total design.s concept of the total design.

  • PDF

Analysis and Quantitative Estimation of Risk Factors of Design-Build (턴키 프로젝트에서 리스크요인 분석 및 정량적 평가)

  • Oh, Guk-Yeol;Lee, Young-Dai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.12-24
    • /
    • 2012
  • The Risks in undertaking a construction project comes from many sources and often involves many participants in the project. This study has identified various kinds of risks, assessed the risk factors quantitatively and suggested risk management method for response pertinent in Design Build(Turn Key)type of projects in Korean context. A questionnaire was designed comprising of 145 possible risks in all types of construction projects. The population from owner, consultant and contractor groups was asked to indicate the risks applicable in DB projects. 25 numbers of critical risks in DB projects were identified and further analyzed for reveling inherent relationship between them through factor analysis. Factor analysis revealed 8 risk factors in DB projects. Construction site related, contract related and design related risk factor consisted about 72% of total risk weight. It has been found out about 6%, while considering the mutual dependency, it is about 10% of total cost of DB project. Therefore, It is suggested that 6% to 10% of construction amount as contingency has to be made provision for risk responses in the DB projects.

Design and Construction of the Burj Dubai Concrete Building Project (버즈 두바이 콘크리트 건물의 설계와 시공)

  • Abdelrazaq, Ahmad
    • Magazine of the Korea Concrete Institute
    • /
    • v.20 no.6
    • /
    • pp.28-35
    • /
    • 2008
  • The Burj Dubai Project will be the tallest structure ever built by man; when completed the tower will be more than 700 meter tall and more than 160 floors. While the early integration of aerodynamic shaping and wind engineering considerations played a major role in the architectural massing and design of this multi-use/residential tower, where mitigating and taming the dynamic wind effects was one of the most important design criteria, the material selection for the structural systems of the tower was also a major consideration and required detailed evaluation of the material technologies and skilled labor available in the market at the time Concrete was selected for its strength, stiffness, damping, redundancy, moldability, free fireproofing, speed of construction, and cost effectiveness. In addition, the design challenges of using concrete for the design of the structural system components will be addressed. The focus on this paper will also be on the early planning of the concrete works of the Burj Dubai Project.

A Study on the Classroom Space Planning through User Participation Design - Focusing on the case of School Space Innovation Project in Incheon - (사용자 참여설계를 통한 교실공간계획에 관한 연구 - 인천광역시 학교공간 혁신사업 사례를 중심으로 -)

  • Son, Suk-Eui;Kim, Seung-Je
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.28 no.4
    • /
    • pp.11-17
    • /
    • 2021
  • This study is aimed at presenting an efficient management plan of user participatory design in a situation where the School Space Innovation Project is in progress. 2 schools that were the targets of the Incheon School Space Innovation Project in 2019 were selected for this, and features such as the physical environment of that classroom, classroom usage plan, and the stepwise outcome of the user participatory design workshop were contemplated. Especially the workshop outcome was compared and analyzed quantitatively, focusing on the actual master plan and zoning plan, in order to identify the feature that opinions of various users are reflected on the actual plan. As a result, the following conclusion could be reached. Firstly, it was confirmed that the expression about the user preferential space influences the classroom usage plan of that classroom. Vague expressions about the whole space held a large majority of the objects for the linguistic expression of the preferential space. The expression mode as limited as the expression of the actions that users want to carry out in the space. On the other hand, when the usage purpose of the classroom was definite, it was confirmed that the demand for furniture·facility is relatively high. Secondly, according to the analysis of zoning for each function, it seems that the stereotype, which is arranged on the basis of the chalkboard at the front of existing classrooms, was applied in the case of the learning zone. However, in cases of other functions, a tendency was identified that the user carries out an image description that reflects the physical features of the space. Sufficient preparation will need to precede for the efficient management of the user participatory design workshop and the acceptance of various opinions. It seems that especially the classroom usage plan, number of workshops, consultation of each step, and the education about the space expression mode affect the master plan.

A Study on the Application of Design VE Process in Pre-Construction Phase for GMP Determination of CM at Risk Project (시공책임형 CM 사업의 GMP 결정를 위한 시공이전단계 설계VE 프로세스 적용방안 도출)

  • Park, Bo-sung;Kim, Ok-kyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.5
    • /
    • pp.56-64
    • /
    • 2022
  • Although pilot projects have been actively carried out from 2017 to present to institutionalize CM at Risk, one of the major tasks for innovation in the construction industry, standards and processes related to Design VE, a key tool for determining GMP in the pre-construction phase, have not yet been established. Therefore, through research and operation status related to CM at Risk and Design VE, and survey on project participants' perception, the problem of the existing design VE process was derived, and the design VE process suitable for the CM at Risk project was proposed. The application plan was proposed in three aspects: Schedule, Cycle, and Process, and the appropriateness and applicability were verified through FGI. The results of this study are expected to be used as basic data on the establishment and legislation of order standards to be made in the future.

A Study on Smart City Project Evaluation System: Focusing on Case Analysis of IFEZ Smart City (스마트시티 프로젝트 평가체계에 대한 연구: IFEZ 스마트시티 사례분석을 중심으로)

  • Sang-Ho Lee;Hee-Yeon Jo;Yun-Hong Min
    • The Journal of Bigdata
    • /
    • v.8 no.1
    • /
    • pp.83-97
    • /
    • 2023
  • Project evaluation is the process of evaluating the progress and results of a project. Smart city projects can be divided into system components (infrastructure, services, platforms), or projects can run simultaneously for multiple services. In addition, services are developed and expanded through additional projects. In order to ensure that the smart city, which is composed of various projects, proceeds in accordance with the goals and strategies, periodic project evaluation is required during the project implementation process. The smart city project evaluation system proposed in this paper is designed to provide comprehensive and objective indicators by reflecting various factors that must be considered for projects occurring in all stages of planning, design, construction, and operation of smart cities. The indicators derived from the evaluation system can be used by decision makers to determine the direction of smart city project development. In addition, it is designed so that the performance of the project can be evaluated interim before the end of the project and the feedback obtained from it can be reflected. To introduce the application method of the smart city project evaluation system proposed in this study, the evaluation system developed in this study was applied to the smart city project case of Incheon Free Economic Zone (IFEZ). Based on the evaluation results, items that can maximize the improvement effect of each smart city project item were presented, and the direction of smart city project implementation was suggested. By utilizing a smart city project evaluation system that reflects the characteristics of smart city projects that are composed of multiple projects, comprehensive planning and management of smart city projects will be possible, and this study will serve as a reference for identifying priority improvement factors for projects.