• Title/Summary/Keyword: Demolition work

Search Result 96, Processing Time 0.036 seconds

Application of Life Cycle Assessment into the Apartment Housing and Calculation of the Energy Consumption and $CO_2$ Emission (전과정평가를 이용한 공동주택의 에너지소비량과 이산화탄소 배출량 산정)

  • Jung, Bo-Ra;Lee, Ha-Shik;Choi, Young-Oh;Lee, Kang-Hee
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2008.04a
    • /
    • pp.235-240
    • /
    • 2008
  • The environment has played a key role to improve the living condition and develop the industry. In building industries, we should consider the environment and mitigate the environmental affect. For mitigating the its affect, various areas of building technology have been developed and applied into filed work. In addition, the process in applying into field requires to conduct the assessment of the environmental affect and improve its applied technology. A lot of assessment methods are proposed in evaluate the building condition such as post-occupancy evaluation, life cycle management and life cycle assessment. Among these assessment methods, life cycle assessment is effectively utilized the environmental affect in building life cycle. Therefore, this paper aimed at analyzing the energy consumption and $CO_2$ emission in building life cycle, using the life cycle assessment and application of the example in apartment housing. This study shows that the maintenance and the production of building materials stage shares most of the amount of energy consumption and $CO_2$ emission and therefore plays an important role to planning the building in terms of the life cycle. Second, the other stages brings about a very small amount. It is important to decide the building shape and contents to mitigate the environmental affect in terms of material, volume, the pattern of the energy use and others.

  • PDF

A Study on of Make-up Design with the Application of Genre Deconstruction in Hybrids (Ver. 1) (하이브리드의 탈 장르화를 응용한 메이크업 디자인에 관한 연구(제 1보))

  • Barng, Kee-Jung;Kim, Kyung-Hee
    • The Research Journal of the Costume Culture
    • /
    • v.20 no.3
    • /
    • pp.347-362
    • /
    • 2012
  • Formatively and artistically aspect, a hybrid can be said to be a phenomenon in which two mutually different genres are combined. Make-up is thought to be very important to arrange the foundation available for predicting and pursuing a flow and direction of future hybrid make-up based on this, by analyzing a flow centering on hybrid trend, which was shown previously. In terms of objectives of this study, the first, aim is to suggest a model for researching make-up by grasping the developmental process and the characteristics of hybrid art through considering an art theory of hybridity, shown in make-up. The second, aim is to design make-up by analyzing trends in make-up style after deconstructing the hybrid genre. The modern make-up design through genre-deconstruction characteristics beyond diverse plurality and genre could be known to be highlighted as aesthetic characteristic by a slight attempt as communication of open space, which connects culture and genre, which had failed to be recognized and was neglected. Empirical research has, produced a work by systematically arranging make-up design. This study, identifies two kind of barrier demolition, such as the class deconstruction and the temporal, spatial disorder centering on genre deconstruction of hybrid. There are infinite possibilities in developing make-up design in line with modern sensation through aesthetic element and symbolic significance through genre deconstruction. It was the expression mode in future make-up, to providing basic data, and to strengthening competitive edge of culture and art.

Stability Analysis of Pipe Rack Module for Underground Complex Plants Construction (복합플랜트 지하 건설을 위한 파이프랙 모듈 공법 안정 해석)

  • Kim, Sewon;Lee, Sangjun;Kim, YoungSeok
    • Journal of the Korean Geosynthetics Society
    • /
    • v.20 no.4
    • /
    • pp.113-124
    • /
    • 2021
  • Underground environmental infrastructure and energy production facilities, which are recognized as avoidable facilities such as landfills, are emerging as an important social issue due to urbanization and economic growth. In order to safely construct a large-scale plant facility in the underground space, it is necessary to increase the utilization of the limited space layout and minimize unnecessary columns. In this study, the plant modularization method(Pipe Rack Module) was reviewed to solve the problems of work constraints, assembly and demolition, process system interconnection, and maintenance that occur when plant facilities are underground. In addition, plant module analysis was performed by applying various load conditions (earthquake load, device load, earth pressure load, etc.) to improve spatial layout usability and secure structure stability. Based on the analysis results under various boundary condition, the implications regarding the minimum installation interval and module arrangement (draft) of basic modules required for the construction of an underground combined plant were derived.

Economic Analysis of Concrete Panel Replacement of PSC Bridge with Embedded Demountable Shear Connector (매립형 분리식 전단연결재를 적용한 PSC교 콘크리트 바닥판 교체공사의 경제성 분석)

  • Soon-Hwan, Lee;Jong-Eon, Kim;Jae-Gyu, Kim;Se-Hyun, Park;Dae-Sung, Jung
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.10 no.4
    • /
    • pp.376-385
    • /
    • 2022
  • The embedded demountable shear connector was developed in preparation for replacement works due to deterioration and damage to the bridge panel of the PSC girder bridge which is a road infrastructure directly related to the safety and convenience of the people. The demountable shear connector minimizes crushing works in the demolition process of the panel, and it is easy to re-construct the shear connector for replacement work. The economic feasibility of the PSC girder bridge using the embedded demountable shear connector compared to the existing construction method was analyzed from the perspective of road users (people) by calculating and comparing the cost of road users caused by traffic blocking during each construction method.

A Worker-Driven Approach for Opening Detection by Integrating Computer Vision and Built-in Inertia Sensors on Embedded Devices

  • Anjum, Sharjeel;Sibtain, Muhammad;Khalid, Rabia;Khan, Muhammad;Lee, Doyeop;Park, Chansik
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.353-360
    • /
    • 2022
  • Due to the dense and complicated working environment, the construction industry is susceptible to many accidents. Worker's fall is a severe problem at the construction site, including falling into holes or openings because of the inadequate coverings as per the safety rules. During the construction or demolition of a building, openings and holes are formed in the floors and roofs. Many workers neglect to cover openings for ease of work while being aware of the risks of holes, openings, and gaps at heights. However, there are safety rules for worker safety; the holes and openings must be covered to prevent falls. The safety inspector typically examines it by visiting the construction site, which is time-consuming and requires safety manager efforts. Therefore, this study presented a worker-driven approach (the worker is involved in the reporting process) to facilitate safety managers by developing integrated computer vision and inertia sensors-based mobile applications to identify openings. The TensorFlow framework is used to design Convolutional Neural Network (CNN); the designed CNN is trained on a custom dataset for binary class openings and covered and deployed on an android smartphone. When an application captures an image, the device also extracts the accelerometer values to determine the inclination in parallel with the classification task of the device to predict the final output as floor (openings/ covered), wall (openings/covered), and roof (openings / covered). The proposed worker-driven approach will be extended with other case scenarios at the construction site.

  • PDF

A Prototype of Distributed Simulation for Facility Restoration Operation Analysis through Incorporation of Immediate Damage Assessment

  • Hwang, Sungjoo;Choi, MinJi;Starbuck, Richmond;Lee, SangHyun;Park, Moonseo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.339-343
    • /
    • 2015
  • To rapidly recover ceased functionality of a facility after a catastrophic seismic event, critical decisions on facility repair works are made within a limited period of time. However, prolonged damage assessment of facilities, due to massive damage in the surrounding region and the complicated damage judgment procedures, may impede restoration planning. To assist reliable structural damage estimation without a deep knowledge and rapid interactive analysis among facility damage and restoration operations during the approximate restoration project planning phase, we developed a prototype of distributed facility restoration simulations through the use of high-level architecture (HLA) (IEEE 1516). The simulation prototype, in which three different simulations (including a seismic data retrieval technique, a structural response simulator, and a restoration simulation module) interact with each other, enables immediate damage estimation by promptly detecting earthquake intensity and the restoration operation analysis according to estimated damage. By conducting case simulations and experiments, research outcomes provide key insights into post-disaster restoration planning, including the extent to which facility damage varies according to disaster severity, facility location, and structures. Additional insights arise regarding the extent to which different facility damage patterns impact a project's performance, especially when facility damage is hard to estimate by observation. In particular, an understanding of required type and amount of repair activities (e.g., demolition works, structural reinforcement, frame installation, or finishing works) is expected to support project managers in approximate work scheduling or resource procurement plans.

  • PDF

Evaluation on Probability and Intensity of Hazards Exposure by Construction Occupations (건설업 직종별 노출 가능 유해인자 및 노출강도에 관한 평가)

  • Hyunhee Park;Sedong Kim
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.33 no.3
    • /
    • pp.317-331
    • /
    • 2023
  • Objectives: Construction workers are exposed to various hazardous substances simultaneously. However, little is known about the exposure hazards in construction industry. This study was aimed at identifying the risk of exposure hazards among construction workers. Methods: The expert survey (n=29) was conducted, including construction industry health managers (n=11) and work environment monitoring experts (n=18), on exposure probability, intensity and risk of hazardous substances by construction occupations Results: The exposure hazards of 30 construction occupations were identified and summarized through a literature review and expert survey. The most prevalent hazards were in order of noise, awkward posture, heat/cold, crystalline silica, cement/concrete dust, metal fumes, and volatile organic compounds. The hazards with highest risk score(over seven points) at construction occupations were noise(formwork carpenter, concrete finisher, rebar worker, demolition worker, driller/rock blaster), hazardous rays(welder), heat/cold (earthworks, formwork carpenter, rebar worker, concrete placer, scaffolder), awkward posture(bricklayer, caulker/tile setter, rebar worker) and heavy lifting(bricklayer, rebar worker). Among construction workers, the job types with the highest risk of exposure to carcinogens, and in which occupational cancer has been reported, were in order of stonemason, concrete finisher, rock blaster, welder, insulation installer, painter, scaffolder, plant worker and earthworks in order Conclusions: Systematic research and discussion on occupational disease among construction workers and its various hazardous factors are needed to establish job exposure matrix for facilitating standard for promptly processing the workers' compensation.

A Study on Estimating Normal Project Duration of Apartment Remodeling Project (공동주택 리모델링공사 표준공기 설정에 관한 연구)

  • Yoon, Jongsik;Yu, Ilhan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.2
    • /
    • pp.12-20
    • /
    • 2017
  • The biggest reason to prefer the remodeling is a relatively short period of time (5~6 years) compared to the reconstruction work that takes 8~9 years. In addition, from the perspective that the period of temporary residence is usually 24 months, the necessity of shortening is greater. Also, since the remodeling construction period is approximately 28~35 months on average, the strategies and efforts are needed to make up for the shortening the remodeling construction period. For these reasons, this paper is to develop an estimating model for normal project duration of apartment remodeling project. This model is reflected in the remodeling properties thorugh difference analysis of the new apartment construction project. Demolition works, reinforcement works, extension works are different, so this paper newly defines these construction work's duration in normal project duraion of remodeling. Case study and experts interviews are used to validate normal project duration. This model can be used to calculate rough construction period each alternatives, and will help a strategic decision making among the stakeholders.

A Study on Normal Project Period for Parking Lot of Aged Apartment Housing (노후 공동주택 주차장 리모델링 공사 표준공기 설정에 관한 연구)

  • Bang, Seongbae;Jang, JunYoung;Koo, Choongwan;Kim, Taewan;Lee, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.107-119
    • /
    • 2021
  • Recently, interest in remodeling apartment houses has been increasing due to problems such as a lack of parking spaces for old apartment houses. However, no method was suggested to predict the construction period of the apartment remodeling project. Unlike general apartment new construction, apartment remodeling construction involves demolition or reinforcement work, so a realistic remodeling construction period calculation plan differentiated from the existing construction period should be proposed. Therefore, this study intends to present a model for deriving the construction period of the underground parking lot of the apartment remodeling construction. Each construction period was calculated based on 19 activities of underground parking lot remodeling work through review of previous studies and expert advice. Activity's workload data and productivity data were derived to calculate the construction period, and the number of inputs and equipment inputs by Activity were determined to correct the productivity data. The construction period of Activity was calculated using the derived data, and the criteria for calculating the overlapping period for each Activity were presented to enable realistic construction period and scheduled schedule. As a result of predicting the accuracy of the construction period through the verification of the case complex, it is expected that it will be possible to predict the approximate construction period of the underground parking lot of the apartment remodeling construction in the future.

A Study on the Assessment of Source-term for PWR Primary System Using MonteCarlo Code (MonteCarlo 코드를 이용한 PWR 일차 계통 선원항 평가에 관한 연구)

  • Song, Jong Soon;Lee, Sang Heon;Shin, Seung Su
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.16 no.3
    • /
    • pp.331-337
    • /
    • 2018
  • The decommissioning of nuclear power plants is generally executed in five steps, including preparation, decontamination, cutting/demolition, waste disposal and environmental restoration. So, for efficient decommissioning of nuclear power plants, worker safety, effects compared to cost, minimization of waste, possibility of reuse, etc., shall be considered. Worker safety and measurement technology shall be secured to exert optimal efficiency of nuclear power plant decommissioning work, for which accurate measurement technology for systems and devices is necessary. Typical In-Situ methods for decommissioning of nuclear plants are CZT, Gamma Camera and ISOCS. This study used ISOCS, which can be applied during the decommissioning of a nuclear power plant site without collecting representative samples, to take measurements of the S/G Water Chamber. To validate the measurement values, Microshield and the GEANT4 code was used as the actual method were used for modeling, respectively. The comparison showed a difference of $1.0{\times}10^1Bq$, which indicates that it will be possible to reduce errors due to the influence of radiation in the natural environment and the precision of modeling. Based on the research results of this paper, accuracy and reliability of measurement values will be analyzed and the applicability of the direct measurement method during the decommissioning of NPPs will be assessed.