• Title/Summary/Keyword: Delay of decision making

Search Result 93, Processing Time 0.032 seconds

An Implementation of Global Scheduler for Efficient Distributed Resource Management (효율적 분산자원 관리를 위한 글로벌 스케쥴러 구현)

  • Yong Wan Koo
    • Journal of the Korean Institute of Telematics and Electronics B
    • /
    • v.31B no.3
    • /
    • pp.1-13
    • /
    • 1994
  • In this study under the distributed system for efficient distribution resource completely symmetic global scheduler was designed and implemented to obtain the general global scheduler, that is load balancing as sharing objectives. To balance the system's load efficiently each node must be designed to get right decision-making. Thus we considered computing time to estimate fault such as delay on communication network, communication period and other decision-making. Load balancing mechanism which suggested in this study was implemented in the distributed system which IBM PC/AT linked to and composed with Ethernet. The target operating system was composed of IBM PC/AT as a basic construction in which proper type of UNIX operating system were ported and communication layer chose communication type implemented from Amoeba. The method of IPC employing layered multilevel access method to avoid inefficient protocol using direct communication mode guarantees rapid response due to short ready time for IPC.

  • PDF

A Study on the Load Balancing Strategy (부하 균등화 기법 연구)

  • Kim, Kyang-Hyu;Jung, Gu-Young
    • Journal of the Korea Computer Industry Society
    • /
    • v.5 no.9
    • /
    • pp.841-850
    • /
    • 2004
  • In this paper under the distributed system for efficient distribution resource to system's each node must be designed to get right decision making. Thus we considered computing time to estimate fault such as delay on communication network, communication period and other decision making. Aiso, using direct communitation mode improve the availity of total system.

  • PDF

Efficiency Questions of the Left-turn Prohibit in Case of 4-Leg Intersections with 5-Phase Signal System (5현시 신호체계 4지교차로의 좌회전 금지에 따른 효율성 분석)

  • 변상철;박병호
    • Journal of Korean Society of Transportation
    • /
    • v.14 no.4
    • /
    • pp.91-106
    • /
    • 1996
  • This paper deals with on the efficiency questions of the left-turn prohibit at an isolated intersection and a corridor with 5-phase signal system. Its objectives are three-fold ; (1) to analyze the efficiency of the left-turn prohibit with the use of an imaginary network, (2) to evaluate various factors under consideration in decision making on the left-turn prohibit, (3) to provide a framework for estimating and evaluating overall impacts of the left-turn prohibit in traffic network. the major findings using an imaginary network and computer packages such as MINUTP, TRANSYT-7F and STATGRAPH are followings. First, left-turn prohibit reduces cycle length by 33 seconds and delay time per vehicle by 36 seconds at an isolated intersection, and cycle length by 31 seconds and delay time per veicle by 43 seconds along a corridor. Second, total vehicle mile of travel and total travel time at an isolated intersection seem up to increase 38.85 miles(57.36km), 14.4 hour on the average, Regarding to a corridor, total vehicle mile of travel is increased by 50.14 miles(80.22km), but total travel time is decreased by129.9 hours. Third, the efficiency of left-turn prohibit are affected the following eight factors including left-turn volume(veh/hr) and ratio(%), average delay time per vehicle(sec/veh) and others. Finally, several simple and multiple regression models to evaluate the impacts on the left-turn prohibit are formulated from the above eight factors. It can be expected that these models will take an important role in decision-making of left-turn prohibit.

  • PDF

The Effects of Decision Making Delay on Experienced Emotion for Internet Shopping and Internet Shopping Mall Satisfaction (인터넷 쇼핑 중 구매결정 연기가 쇼핑감정과 쇼핑몰 만족도에 미치는 영향)

  • Kim, Hanna
    • Asia Marketing Journal
    • /
    • v.10 no.1
    • /
    • pp.133-160
    • /
    • 2008
  • The purpose of this study was to identify the effects of the delay reasons in consumer decision making on experienced emotion and shopping mall satisfaction under the Internet shopping environment. A survey was conducted for this study and 500 answer sheets were analyzed using structural equation modeling. The results are as follows: First, performance risk, financial risk, and social risk significantly have a positive effect on negative emotions for Internet shopping. Second, performance risk has a significant negative effect on positive emotions for Internet shopping. Third, social risk and procedural uncertainty significantly have a positive effect on positive emotions and this shows these reasons are related to pleasure and fun. Forth, needs uncertainty has a negative effect on negative emotions for Internet shopping. Finally, positive and negative emotions that consumer experienced for Internet shopping affect Internet shopping mall satisfaction.

  • PDF

The Effect of Background Music on Impulsive Decision Making: When People are Exposed to Luxury Items (명품과 배경음악이 충동적 의사결정에 미치는 영향)

  • Jang, Seongjin;Han, Kwanghee
    • Science of Emotion and Sensibility
    • /
    • v.20 no.1
    • /
    • pp.83-94
    • /
    • 2017
  • In this study, we figured out that music modes and item types could affect people's urged decision making through a k-value which results from a delay discounting's hyperbolic function. Generally, high k-value is related to impulsive decision making. Concretely, there was a significant interaction between items and music. For the luxury item, the k-value was higher while listening to major music than minor. However, for the non-luxury item condition the k-value difference was not significant between two pieces of music. Moreover, we expected mood could be manipulated after listening to the music and mediate a difference of tendency. We used first movement as an allegro and second as an andante of Mozart piano concerto No.5 D-major and No.20 D-minor for stimuli. As a result, mode and tempo's main effects were not significant. Nevertheless, there was a significant two-way interaction. To put it concretely, the k-value of major condition was marginally higher than minor condition on allegro. However, the k-value of major condition was significantly lower than minor condition on andante. Also, depressed degree difference was significant but it was not significant as a mediator. Set depressed degree as a predict variable and future time span as a mediator, further research found future time perception partially mediated the effect that depressed degree affects impulsivity.

Prevention of delay in implant services using time schedule (타임스케줄을 이용한 임플란트 수술의 지연 개선)

  • Ji-Yeon, Park
    • Journal of Korean Academy of Dental Administration
    • /
    • v.10 no.1
    • /
    • pp.1-8
    • /
    • 2022
  • This study introduces research on the quality of medical services, optimization of medical services, dental medical services, implant medical services, and time schedules, as well as the effective process of dental implant medical services, which is expensive and requires a long treatment period. For improvement, it is suggested to evaluate using a time schedule. In this method, a time schedule is prepared in which each step, starting from the patients appointment until the completion of the treatment process, is allotted a certain time. This schedule was finalized in consultation with the employees. When performing all implant operations, the starting time of each item was checked to evaluate the degree of compliance and to understand any reasons for delay in each step. After identifying the causes for delay at each step, suitable steps to rectify the drawbacks were developed, and an optimal plan for patient management was determined. Changes in waiting time and human resource utilization were shown as concrete data, suggesting that such a schedule is meaningful as a decision-making support tool.

A Consideration of the Decision-Making Efficiency Concerning the Removal of Oil Spills by Foreign Ships in the EEZ (EEZ내 외국 침몰선박 잔존유 제거 의사결정 효율화 방안 고찰)

  • Na, Song-Jin
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.25 no.6
    • /
    • pp.698-707
    • /
    • 2019
  • The removal of oil spilled by the sinking of a foreign ship in Korea's Exclusive Economic Zone (EEZ) began in May 2019 four years after the ship sunk near Jeju Island. The cleanup was conducted by a foreign company that was contracted to the ship-owner's protection & indemnity (P&I) insurance company. In contrast to the time taken to begin the cleanup, the operation itself was completed in just 22days. Compared to similar cases, the decision to begin the removal was a delayed one. This study analyzes all 93 documents related to the ship's sinking and the eventual cleanup, confirming delays in administrative decision-making on the removal, and identifies factors that influenced this delay. These factors include a neglect of accident-related data verification, and other, legal, technical, environmental, and human aspects. Finally, this study suggests ways to improve decision-making efficiency. As the first study dealing with the cleanup in the EEZ, this research is expected to facilitate decision-making and influence the formulation of policies in the future.

Performance Comparison of Signalized Intersections Analysis Tools in Estimating Control Delays (신호교차로 분석도구별 제어지체 산출 성능 비교 연구)

  • Yun, Ilsoo;Oh, Cheol;Ahn, Hyunkyung;Kim, Kyunghyun;Han, Eum;Kang, Nam Won;Yoon, Jung Eun
    • International Journal of Highway Engineering
    • /
    • v.16 no.5
    • /
    • pp.109-119
    • /
    • 2014
  • PURPOSES : The control delay in seconds per vehicle is the most important traffic operational index to evaluate the level of service of signalized intersections. Thus, it is very critical to calculate accurate control delay because it is used as a basic quantitative evidence for decision makings regarding to investments on traffic facilities. The control delay consists of time-in-queue delay, acceleration delay, and deceleration delay so that it is technically difficult to directly measure it from fields. Thus, diverse analysis tools, including CORSIM, SYNCHRO, T7F, VISTRO, etc. have been utilized so far. However, each analysis tool may use a unique methodology in calculating control delays. Therefore, the estimated values of control delays may be different by the selection of an analysis tool, which has provided difficulties to traffic engineers in making solid judgments. METHODS : This study was initiated to verify the feasibility of diverse analysis tools, including HCM methodology, CORSIM, SYNCHRO, T7F, VISTRO, in calculating control delays by comparing estimated control delays with that measured from a field. RESULTS : As a result, the selected tools produced quite different values of control delay. In addition, the control delay value estimated using a calibrated CORSIM model was closest to that measured from the field. CONCLUSIONS : First, through the in-depth experiment, it was explicitly verified that the estimated values of control delay may depend on the selection of an analysis tool. Second, among the diverse tools, the value of control delay estimated using the calibrated microscopic traffic simulation model was most close to that measured from the field. Conclusively, analysts should take into account the variability of control delay values according to the selection of a tool in the case of signalized intersection analysis.

A Study on the Estimation Measure of Delay Cost on Work Zone Using the Traffic Flow Model (교통류 모형을 이용한 도로 점용공사 구간의 지체비용 산정방안)

  • Kim, Yunsik;Lee, Minjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.120-129
    • /
    • 2016
  • The user cost is an important analysis item which should be considered together with life-cycle of facility, administrator cost and discount rate in LCCA for efficient asset management of SOC facilities. Especially, a significant delay cost occurs often for users in the road field due to a work zone for cleaning and maintenance, and in such case, the administrator should consider the administrator cost as well as the user cost for more rational decision making. However, the user cost has not been considered in most decision making steps until recently and relevant studies also have not been carried out actively. In this study, the methodology to estimate the user cost and delay cost required in the decision making step using the traffic flow model and the direct benefit estimation model in the traffic facility investment evaluation guideline is suggested. And, the traffic flow model was estimated on 4 national highway sections where maintenance was actually carried out in 2014 using VISSIM and, the user cost and the delay cost were estimated based on the suggested methodology. The analysis result showed that the average user cost of $17,569,000KRW/km{\times}day$ occurred on Section A with approximately 30,000 AADT before a work zone occurred, and in case the first lane was blocked for maintenance, the delay cost of $10,193,000KRW/km{\times}day$ (158%) on average occurred additionally. The delay cost of $1,507,000KRW/km{\times}day$ (115%) and $1,985,000KRW/km{\times}day$ (119%) occurred on Sections B and D with approximately 20,000 AADT respectively and the delay cost of $262,000KRW/km{\times}day$ (105%) occurred on Section C with approximately 10,000 AADT. This result of this study was estimated based on the simulation of traffic flow model so that there is a limitation in its actual application. A study ot develop a highly appropriate model using actual observation data and improve the possibility to apply it through the verification using the simulation will be necessary in future.

A Study on the Theory and its Case Study of Production Design - Focused on the Japanese Construction Projects - (생산설계의 이론과 적용 사례연구 -일본의 건축공사 프로젝트를 대상으로-)

  • Kim, Jin-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.5 s.27
    • /
    • pp.89-101
    • /
    • 2005
  • The early phase of construction projects, communication among the related participants has great influence on the further transaction of the projects. However, important decision making are made by the experience of the field managers in practice without the method for systematic analysis. For example, in building construction project, selection process for construction method has been executed by decision making of some architects dependent on their experience. As a result, there have been frequent construction method alterations during the construction process and delay of duration, addition of cost, etc have followed accordingly. The main reasons of such a mal-functional transaction are due to the absent of the reasonal procedure of decision making reflecting the characteristics of construction project. Therefore, there is a need for an supporting tool and production design for the selection of rational construction method. The objective of this study is to propose production design process and decision making model in relation to various influent factors at the early phase of construction projects. To achieve these objectives, this study 1)analyzes the prior theory about production design, 2)we have studied about selection process for optimal construction method through constraint analysis in structural works, 3)performs a case study to embody the problems of the production design, and 4)proposes a cooperative committee model for supporting production design by analyzing the results of case study and interviewing experts. It is anticipated that the effective tool of proposed model would be able to improve communication among the related participants and systematically accumulate data that might be used in similar construction projects.