• Title/Summary/Keyword: Delay generator

Search Result 195, Processing Time 0.044 seconds

Radar Echo Signal Simulation Equipment with a Precise Range-velocity Control Capability (정밀 거리-속도 모사 기능을 갖는 레이더 반사 신호 모의장치)

  • Han, Il-Tak;Kim, Jong-Mann;Kim, Wan-Kyu;Lee, Min-Joon
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.13 no.6
    • /
    • pp.1139-1146
    • /
    • 2010
  • Simulated target generators are used to evaluate the various radar performance. Using the radar parameters such as target range(time delay), doppler frequency, target RCS, simulated target generator can be developed. Especially moving targets are simulated by control time delay and update target signal intensive for target range. Base on this concepts, in this paper, simulated target generators are designed and developed for X-band Radar performance test. Developed equipment is evaluated its performance and then tested with X-band Radar. This paper presents these design, development, and test results of developed target generator.

Measurement based Traffic Generator for Network Game (트래픽 측정에 기반한 네트워크 게임 트래픽 생성기)

  • Eunsil Hong;Jaecheol Kim;Yanghee Choi
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2003.10c
    • /
    • pp.49-51
    • /
    • 2003
  • Developers of network games have used several prediction techniques for hiding transmission delay to support the real­time requirement of network games. Nowadays many researches that are related with network game are in progress to solve delay problems more radically, such as to propose new routers architecture and transport protocols suitable to characteristics of network game traffic. So for these advanced researches the tasks to grasp the traffic characteristics of a network game are needed. In this paper we aimed to capture the traffic of MMORPG and present the statistical analysis of measured data. The measurement and the analysis were accomplished with the server of 'Lineage' that regarded as the most successful MMORPG. Next, we have implemented a traffic generator that reflects the characteristics of MMORPG and shown that the trace generated by MMORPG traffic generator had identical characteristics with actual traffic using statistical testing method. We expect that this traffic generator can be used in many researches related with a network game.

  • PDF

Design of the Single Chip Trigonometric Function Generator with ROMs (ROM을 이용한 SINGLE CHIP SINE FUNCTION GENERATOR의 설계)

  • Hong, Ki-Sang;Hwang, Ho-Jung
    • Proceedings of the KIEE Conference
    • /
    • 1987.07b
    • /
    • pp.1485-1487
    • /
    • 1987
  • To improve time delay produced in computation of trigonometric function by software method, the function generator was designed to compute the sine function with ROMs. Since the computation speed of trigonometric function can be improved by this ROM, it will be used in various parts required to scientific calculation-radar, FFT and signal processing etc.

  • PDF

The Improvement Output of the Synchronous Generator Excitor using CRA control method (CRA 제어기법을 이용한 동기발전기 여자기의 출력 개선)

  • Hong, Hyun-Mun
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2008.05a
    • /
    • pp.449-450
    • /
    • 2008
  • It is difficult to find for analysis solution of the synchronous generator exciter system. Recently, it had good performence UPS converter system using CRA method. The single converter of synchronous generator excitor system under considerations : (i) the overall system shall keep very low AC-voltage tracking error as well as no phase delay over different load condition, and (ii) the digital controller shall be employed at a fixed sampling. It is shown that the synchronous exciter system can be achieved by the proposed controller using Characteristic Ratio Assignment.

  • PDF

The Generator Maintenance Scheduling using Fuzzy Multi-criteria (퍼지다목적함수를 이용한 발전기보수유지계획의 수립)

  • 최재석;도대호;이태인
    • Proceedings of the Korean Institute of Intelligent Systems Conference
    • /
    • 1995.10b
    • /
    • pp.131-138
    • /
    • 1995
  • A new technique using integer programming based on fuzzy multi-criteria function is proposed for generator maintenance scheduling. Minimization maintenance delay cost and maximization reserve power are considered for fuzzy multi-criteria function. To obtain an optimal solution for generator maintenance scheduling under fuzzy environment, fuzzy multi-criteria integer programming is used. In the maintenance scheduling, a characteristic feature of the presented approach is that the crisp constraints with uncertainty can be taken into account by using fuzzy set theory and so more flexible solution can be obtained. The effectiveness of the proposed approach is demonstrated by the simulation results.

  • PDF

A Study for Generating Power on Operating Parameters of Powerpack utilizng Linear Engine (리니어엔진을 이용한 파워팩의 운전조건에 따른 발전출력에 관한 연구)

  • Oh, Yong-Il;Kim, Gang-Chul;Lim, Ock-Taeck
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.23 no.2
    • /
    • pp.183-190
    • /
    • 2012
  • The research shows the experiment results according to the combustion characteristics and configuration of the linear generator of powerpack for the generating power applying the 2-stroke compact linear engine. The powerpack used in this paper consists of 2-stroke linear engine, linear generator and air compressor parts. For identifying the combustion characteristics and generating power of linear engine, some parameters were varied sucha as electric load, fuel input calorie, spark timing delay and equivalence ratio. Also generating power was confirmed at each operation conditions, when the air gap length of linear generator part was changed as each 1.0 mm and 2.0 mm. During the all operations, intake air was inputted under the wide open throttle. Mass flow rate of air and fuel was changed using mass flow controller, after these were premixed by premixture device, and then premixed gas was supplied directly into each cylinder. As a result, piston frequency and combustion characteristics were different at each conditions according to parameters affecting the combustion such as fuel input calorie, resistive load, spark timing delay and equivalence ratio. Consequently, these had an effect on generating power.

Digital Low-Power High-Band UWB Pulse Generator in 130 nm CMOS Process (130 nm CMOS 공정을 이용한 UWB High-Band용 저전력 디지털 펄스 발생기)

  • Jung, Chang-Uk;Yoo, Hyun-Jin;Eo, Yun-Seong
    • The Journal of Korean Institute of Electromagnetic Engineering and Science
    • /
    • v.23 no.7
    • /
    • pp.784-790
    • /
    • 2012
  • In this paper, an all-digital CMOS ultra-wideband(UWB) pulse generator for high band(6~10 GHz) frequency range is presented. The pulse generator is designed and implemented with extremely low power and low complexity. It is designed to meet the FCC spectral mask requirement by using Gaussian pulse shaping circuit and control the center frequency by using CMOS delay line with shunt capacitor. Measurement results show that the center frequency can be controlled from 4.5 GHz to 7.5 GHz and pulse width is 1.5 ns and pulse amplitude is 310 mV peak to peak at 10 MHz pulse repetition frequency(PRF). The circuit is implemented in 0.13 um CMOS process with a core area of only $182{\times}65um^2$ and dissipates the average power of 11.4 mW at an output buffer with 1.5-V supply voltage. However, the core consumes only 0.26 mW except for output buffer.

Development of DDL(Digital Delay Line) Module Using Interleave Method Based on Pulse Recognition and Delay Gap Detection (펄스 인식 및 지연 간격 검출을 통한 인터리브 방식의 디지털 시간 지연 모듈 개발)

  • Han, Il-Tak
    • The Journal of Korean Institute of Electromagnetic Engineering and Science
    • /
    • v.22 no.6
    • /
    • pp.577-583
    • /
    • 2011
  • Radar performance test is one of the major steps for radar system design. However, it is restricted by time and cost when radar performance tests are performed with opportunity targets. So various simulated target generators are developed and used to evaluate radar performance. To simulate the target's range, most of simulated target generators are developed with optical line or DRFM(Digital RF Memory) technique but there are many restrictions such as limit of range imitation and test scenario because of their original usage. In this paper, DDL(Digital Delay Line) module for development of simulated target generator is designed with precise range simulation and easily embodiment feature. And pulse recognition and delay gap detection technique are used to simulate the time delay without distortions. Developed DDL module performances are verified through their performance tests and test results are described in this paper.

Modeling and Experiment of 50kW Diesel Generator in Grid-connected Mode (50kW 계통연계형 디젤발전기의 모델링 및 실험)

  • Lee, Wujong;Lee, Hak Ju;Chag, Hanju
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.10
    • /
    • pp.1347-1353
    • /
    • 2014
  • This paper researches a modeling and experiment of 50kW diesel generator in grid-connected mode. The output of diesel generator can be calculated by the phase difference between voltage and current as well as the diesel generator parameter such as mutual impedance, field current and rotor angle. Considering the different d-q frame impedance, the output of diesel generator is analyzed for equation and verified by simulation. The diesel generator modeled by considering the time delay for actuator, diesel engine and exciter. The controller of diesel generator is divided into governor and exciter. The governor consists of speed controller and active power controller, where speed controller maintains frequency as 60Hz and active power tracks active power reference. On the other hand, the exciter consists of voltage controller and reactive power controller, where voltage controller controls $380V_{LL}$ and reactive power is controlled as zero. When the active power reference is changed as 0.1pu in the grid connected mode, the active power takes 10 seconds to reach the steady state and the reactive power is maintains as zero. The 50kW diesel generator is tested and experiment results are well matched with the simulation results.

Efficient Implementation of a Pseudorandom Sequence Generator for High-Speed Data Communications

  • Hwang, Soo-Yun;Park, Gi-Yoon;Kim, Dae-Ho;Jhang, Kyoung-Son
    • ETRI Journal
    • /
    • v.32 no.2
    • /
    • pp.222-229
    • /
    • 2010
  • A conventional pseudorandom sequence generator creates only 1 bit of data per clock cycle. Therefore, it may cause a delay in data communications. In this paper, we propose an efficient implementation method for a pseudorandom sequence generator with parallel outputs. By virtue of the simple matrix multiplications, we derive a well-organized recursive formula and realize a pseudorandom sequence generator with multiple outputs. Experimental results show that, although the total area of the proposed scheme is 3% to 13% larger than that of the existing scheme, our parallel architecture improves the throughput by 2, 4, and 6 times compared with the existing scheme based on a single output. In addition, we apply our approach to a $2{\times}2$ multiple input/multiple output (MIMO) detector targeting the 3rd Generation Partnership Project Long Term Evolution (3GPP LTE) system. Therefore, the throughput of the MIMO detector is significantly enhanced by parallel processing of data communications.