• Title/Summary/Keyword: Criteria cost

검색결과 1,093건 처리시간 0.028초

Solid Culture Medium Selection Criteria for Hydroponics Farm Households (양액재배 농가의 고형배지 선택 기준에 관한 연구)

  • Kim, Dong-Seok;Kim, Dae-Young;Hwang, Jae-Hyun;Yun, Hoa-Young
    • Korean Journal of Organic Agriculture
    • /
    • 제22권4호
    • /
    • pp.841-854
    • /
    • 2014
  • This study aimed to analyze the selection criteria and priority settings for solid culture medium used in hydroponic crop production in farm households. Expert brain storming was carried out to extract solid culture medium selection criteria for hydroponic farming. As a result, 3 criteria of economy (cost), productivity, and environment, and 9 factors were extracted. A questionnaire survey of hydroponic farm households was conducted in Gyeonggi, Gangwon, and Chooncheong provinces. AHP analysis of the hydroponic solid culture medium selection criteria identified productivity as the most important criterion, chosen by 58.7% of the respondents, followed by economy (28.4%) and environment (12.9%). The 9 factors were rated by the respondents in the following decreasing order of importance: 1, crop yield (28.3%); 2, pest occurrence (18.5%); 3, maintenance/management costs (12.0%); 4, convenience of maintenance/management (13.4%); 5, initial investment cost (11.6%); 6, material energy consumption (6.5%); 7, waste recyclability (4.0%); 8, waste disposal costs (3.4%); and 9 environmental emissions (1.81%). These results imply that hydroponic farm households consider cultivation-related quality factors more important than economic factors, such as price of culture medium or installation cost.

Minimum Expected Life Cycle Cost Model for Optimal Seismic Design and Upgrading of Long Span PC Bridges (장대 PC교량의 최적 내진설계 및 성능개선을 위한 최소 기대 Life Cycle Cost 모델)

  • 조효남;임종권
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 한국전산구조공학회 1999년도 봄 학술발표회 논문집
    • /
    • pp.305-312
    • /
    • 1999
  • This study is intended to propose a systematic and practical life cycle cost(LCC) model for the development of the reliability-based seismic safety and cost-effective performance criteria for design and upgrading of long-span PC bridges. The LCC models consist of five cost functions such as initial cost, repair/replacement cost, human losses, road user cost, and indirect losses of regional economy. The proposed model Is successfully expressed in temrs of Park-Ang damage indices and life cycle damage probability obtained from SMART-DRAIN-2DX which is an existing algorithm for nonlinear time history analysis. The proposed LCC model is successfully applied to a viaduct constructed by PSM, in Seoul. Based on the observations, the proposed systematic procedure for the formulation of LCC model may be useful for the development of the reliability-based seismic safety and cost-effective performance criteria for design and upgrading of long-span PC bridges.

  • PDF

A Study on the Multi-Criteria Decision Making for Effect Analysis and Decision Making of Weapon System (무기체계의 효과분석과 의사결정을 위한 다기준분석 방법론의 연구)

  • Lim, Sung-Hoon;Cho, Ki-Hong;Park, Seung
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • 제12권5호
    • /
    • pp.557-562
    • /
    • 2009
  • Weapon system currently considers the research about effect analysis including cost effectiveness methodology for a budget management and an achievement of the military strategy goal. So that, this study considers the theoretical background, strength and weakness of several Multi-Criteria Decision Making, and an effect analysis of weapon system. And AHP(Analytic Hierarchy Process) is selected for the best effect analysis methodology of weapon system. Therefore, we applied AHP to the case study of the new generation Multiple Launcher Rocket System, performing the analysis of cost effectiveness methodology. Using AHP and cost effectiveness methodology, we propose the actual and proper decision making result.

A Study of Track Irregularity Standard for Rational Track Maintenance (일반철도 유지보수 합리화를 위한 궤도틀림 기준 연구방향)

  • Kim, Soo-Jeong;Lee, Byeong-Hyeok;Lee, Du-Jas;Eom, Jong-Woo
    • Proceedings of the KSR Conference
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.1624-1630
    • /
    • 2011
  • Currently the train operating environment to affect track irregularity is changed rapidly such as speed-up, linear improvement and rolling stack upgrade. The recent track maintenance criteria of track irregularity was quoted from past Japan's, and the needs of revision of criteria are increased because of the rapid change in train operating environment. In case of enhance the track irregularity criteria, it secure driving safety and riding comfort but maintenance cost are increase. And also decrease ballast durability by frequent corrective work. In case of mitigate the criteria, it decrease driving safety and riding comfort, but save the maintenance cost. The study for enacting rational criteria did not carry out so far. In this study, survey the domestic and international track irregularity and case study for track irregularity inspection results and maintenance history for guideline of enacting irregularity criteria study.

  • PDF

A Comparative Analysis on the Characteristics of Rammed Earth Form System based on Selection Criteria (거푸집 선정기준에 의한 흙다짐용 거푸집 시스템의 특성 비교분석)

  • Lee, Jong Kook;Lee, Jung Je
    • KIEAE Journal
    • /
    • 제7권6호
    • /
    • pp.91-97
    • /
    • 2007
  • This research examines the characteristics of the "rammed earth form" based on the criteria for the selection of forms. For this purpose, the paper first reviews the characteristics and orientation of the earth-construction and looks into the outline, the prerequisite, the current status and the tendency of the rammed earth form system through previous studies. Consequently, we aims to contribute to the criteria for the selection of rammed earth forms in the future through a comparative analysis of the construction cost, quality, safety and easiness of works between the veneer board form and the euroform, which are most widely used at earth housing project in the domestic country. The results reveals that the euroform is better than the veneer board with 21% of total cost in the cost analysis. But this better than that in the side of easiness of construction. In both cases, the buckling of wall panel form and the labor-oriented characteristics of the methods are the future research issues in the rammed earth form system.

A Study of Project Selection Criteria and Models for Computerization of Governmental Administration (행정업무(行政業務)의 전산화(電算化)를 위한 선정기준(選定基準) 및 모형(模型))

  • Lee, Jin-Ju;Park, Yeong-Tak
    • Journal of Korean Institute of Industrial Engineers
    • /
    • 제3권2호
    • /
    • pp.63-72
    • /
    • 1977
  • The trend of computerization is significant in Korea even at its beginning stage, especially for governmental administration. However, full-fledged success of computerization in an organization is reported to be rare while the cost of computerization has been high and increasing. This paper is concerned with two features for the successful implementation of a computerized system in an organization selection criteria for the computerization among the possible candidate projects and project selection models. Due to the dearth of literature regarding successful implementation of computerization, other sources of literature with respect to R & D management, method engineering, etc. were reviewed to develop a set of factors influencing successful computerization. Thus, project selection criteria for computerization of governmental administration are developed and organized as follows: cost of computerization project including both system development and operating cost, quanitative and qualitative benefits of computerization project, probability of technical and implementation success of computerization and other organizational and political factors to be considered. These criteria are broken down into detailed sets of subcriteria to be measured. To select a project after thorough consideration of the selection criteria, a project selection model which takes into account all criteria together has to be developed. In the study three project selection models are suggested and developed. They are the checklist model, multi-stage cut-off model, and composite criteria model. A detailed procedure for each of the three models is illustrated. Although the project selection criteria and models are developed here primarily for the computerization of governmental administration, they are easily applicable to other settings of computerization. Finally, some caveats for the use of selection criteria and models are discussed.

  • PDF

A Multi-stage Multi-criteria Transshipment Model for Optimal Selection of Transshipment Nodes - Case of Train Ferry-

  • Kim, Dong-Jin;Kim, Sang-Youl
    • Journal of Navigation and Port Research
    • /
    • 제33권4호
    • /
    • pp.271-275
    • /
    • 2009
  • A strategic decision making on location selection for product transportation includes many tangible and untangible factors. To choose the best locations is a difficult job in the sense that objectives usually conflict with each other. In this paper, we consider a multi stage multi criteria transshipment problem with different types of items to be transported from the sources to the destination points. For the optimization of the problem, a goal programming formulation will be presented in which the location selection for each product type will be determined under the multi objective criteria. In the study, we generalize the transshipment model with a variety of product types and finite number of different intermediate nodes between origins and destinations. For the selection of the criteria we selected the costs(fixed cost and transportation cost), location numbers, and unsatisfied demand for each type of products in multi stage transportation, which are the main goals in transshipment modelling problems. The related conditions are also modelled through linear formats.

The Impact of Design-Bid-Build Procurement Methods on Project Performance in Libya

  • Ghadamsi, Alaeddin;Braimah, Nuhu
    • Journal of Construction Engineering and Project Management
    • /
    • 제6권2호
    • /
    • pp.16-23
    • /
    • 2016
  • The use of inappropriate procurement methods to deliver construction projects has long been acknowledged as a major source of poor project performance and is particularly problematic for the Libyan Construction Industry. Poor procurement method selection has been recognised as a major contributory factor to frequent time and cost overruns. This paper offers a way of selecting specific procurement methods to maximize successful project performance. The methodology involves an intensive review of relevant literature, followed by a semi-structured questionnaire survey. The key findings of the study reveal that 11 out of its 12 common selection criteria exhibit a significant contribution to one or more project performance criteria (time, cost and quality). Project clients should therefore prioritise these criteria when selecting a design-bid-build method. Knowledge of the criteria that contribute positively to project performance will also enable clients to work out, prior to and during construction, the best measures and provisions for successful project outcomes.

Study on effect of ultrasonic inspection criteria to soundness evaluation of honeycomb core sandwich and laminate structure used for commercial aircrafts (초음파검사 판정 기준이 항공기용 복합구조재의 건전성 평가에 미치는 영향에 관한 고찰)

  • 진양준;한중원;김국진;송기경
    • Proceedings of the Korean Society For Composite Materials Conference
    • /
    • 한국복합재료학회 2002년도 추계학술발표대회 논문집
    • /
    • pp.202-207
    • /
    • 2002
  • The soundness of honeycomb core sandwich and laminate structure used for commercial aircrafts is generally evaluated with ultrasonic inspection because the inspection is most sensitive to planar surfaces which are perpendicular to sound propagation pass and reflects sound almost 100% to equipment. And most defects inherent in composite material curing process has good reflective surfaces. With all this advantage, unexpected obstruction to product and additional cost could be occurred when inappropriate accept/reject criteria is given. In this study the importance of inspection criteria will be discussed to show how inappropriate criteria cause unexpected results leading to high production cost and how much time must be spent to correct those improper criteria with an actual case occurred in Aerospace Division, Korean Air.

  • PDF

Optimal Seismic Reliability of Bridges Based on Minimum Expected Life Cycle Costs (최소기대비용에 기초한 교량의 최적내진신뢰성)

  • 조효남;임종권;심성택
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 한국전산구조공학회 1999년도 가을 학술발표회 논문집
    • /
    • pp.249-256
    • /
    • 1999
  • This study is intended to propose a systematic procedure for the development of the reliability-based seismic safety and cost-effective Performance criteria for design and upgrading of long span PC bridges. In the paper, a set of cost function models for life cycle cost analysis of bridges is proposed. The total life cycle cost functions consist of initial cost and direct/indirect damage costs considering repair/replacement costs, human losses and property damage costs, road user costs, and indirect regional economic losses. The damage costs are successfully expressed in terms of Park-Ang median global damage indices and damage probabilities. The proposed approach is successfully applied to model bridges in both regions of a moderate seismicity area like Seoul, Korea and a high one like Tokyo, Japan. It may be expected that the proposed approach can be effectively utilized for the development of cost-effective performance criteria for design and upgrading of various types of bridges as well as long span PC bridges.

  • PDF