• Title/Summary/Keyword: Crisis management System

Search Result 324, Processing Time 0.028 seconds

A Study on the Status of Energy Usage and Maintenance of Building Energy Management System in School Facilities (학교시설의 에너지사용 및 건물에너지관리시스템 유지관리 현황에 관한 연구)

  • Kim, Sung-Joong;Lee, Seung-Min
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.21 no.2
    • /
    • pp.25-35
    • /
    • 2022
  • With the enactment of the "Framework Act on Carbon Neutrality and Green Growth to Cope with Climate Crisis," various sector-specific plans are being implemented to achieve carbon neutrality. School facilities are mandatory buildings for the "Zero Energy Building Certification" and are the buildings that account for the highest proportion among public institution buildings. Therefore, they play a major role in achieving carbon neutrality in the construction sector. This study analyzed the recent energy use trends and zero energy levels in varied ways to promote the spread of building energy management systems and to provide basic data for efficient operation management and investigated the effectiveness and user opinions of the Building Energy Management System (BEMS) applied to school facilities.

Risk Issue Analysis of Disaster Vulnerable Groups -Focusing on Cases of Children and Pregnant Women (재난취약계층의 위험이슈분석 -어린이, 임산부 사례를 중심으로-)

  • Kim, Shin Hye;Kwon, Seol A
    • The Journal of the Korea Contents Association
    • /
    • v.21 no.7
    • /
    • pp.291-303
    • /
    • 2021
  • In the modern society, the number of people in disaster vulnerable groups is rapidly increasing such as the elderly, the disabled, foreigners, and children. The common characteristics of the groups vulnerable to disasters are that they live in residence types that are exposed to disasters because they are impoverished and if they are exposed to disasters, recovery is a slow process. The purpose of this study is to identify the new risk issues by performing risk issue analysis on the targets of disaster vulnerable group and provide base data for the development of the policies. For the research method, this study centered on the cases of children and pregnant women out of the disaster vulnerable groups and focused on the issue data of social media throughout the past 10 years ('10~'19) and performed social network analysis. As a result, first, the development of the issue showed relevance in the occurrence of specific cases. Second, the awareness about the types, targets, and management method of crisis management was analyzed. Third, an analysis was performed on the sentiment words that considered the solution measures of risk issues or the characteristics of the targets and it was analyzed that there were word that triggered negative emotions. Therefore, it is anticipated for the base data to be used for the government and also for the local government to build an effective crisis management system of the rapidly changing disaster environment on the basis of the sentiment analysis performed on the people of the nation as well as public awareness.

Literature Review of Key Success Factors of Management Innovation Actions in Domestic - Focused on Six Sigma, TQM, Lean Six Sigma, ERP, TPM, BPR, Project Management, System Engineering - (국내 경영혁신 활동의 핵심 성공요인 문헌 연구 - 6시그마, TQM, 린 6시그마, ERP, TPM, BPR, Project Management, System Engineering 중심으로 -)

  • Mun, JeOk;Yoon, SungPil
    • Journal of Korean Society for Quality Management
    • /
    • v.44 no.3
    • /
    • pp.639-648
    • /
    • 2016
  • Purpose: Existing precedent studies include success factors of individual management innovation activities constantly. However, those studies have limitations about the common key success factors of individual management innovation activities. Methods: For this study, we investigate the key success factors using literature research of the most typical management innovation activities adopted and implemented by many companies in Korea, such as 6sigma, TQM, Lean 6sigma, ERP, TPM, BPR, Project Management, System Engineering. Factors emerging repeatedly was combined into common factors and inherent factors that are necessary for the success of individual management innovation activities are designated to essential factors. Results: 'Essential factors for Six Sigma' consist of 5 items. Black belt operating system, personnel management system linkage, the correct management of the data, perform improvement projects associated with financial performance financial result, linked to financial performance improvement project, project progress management. 'Essential factors of TQM' are arranged 4 items. Quality team's independence and role, goal-setting, Quality Information System, corporate's philosophy of quality first. 'Essential factors of Lean Six Sigma' are the selection of value stream which is based on the customer needs and the value creation and identify the project based on the selected value in the company. 'Essential factors of ERP' are investigated 6 items. Ongoing system maintenance and upgrades, the measurement and support of user satisfaction, the operating systems and the policies for the maintenance, IT infrastructure, change adaption condition monitoring, focusing on improving business performance. 'Essential factors for TPM' are arranged 4 items. Motivated and energetic Bottom-Up, CEO's recognition of the importance facility management, long-term perspective of necessity and ongoing patience. 'Essential factors for BPR' are the pursuit of change process and the staff's sense of crisis management. 'Essential factors for Project Management' are the strategy that reduce the risk management skills through risk management and the understanding and organized management for the project participant's needs. 'Essential factors for System Engineering' consist of 2 items. The first is the design for the best balanced system with pre-analysis about the compromise the cost, schedule and the performance. The second is the analysis of large problem into small problems which can solved. We have found the solution considering components of the interface through the systematic perspective. Conclusion: Common factors and essential factors presented in this study will properly help to introduce the individual management innovation activities for the each business sector and implement management innovation. After this study, new literature research that reflect new studies should accomplish steadily.

A Model of the Construction Risk Management System for Site Personnel in the Construction Project (건설현장 실무자를 위한 건설공사 위험관리시스템 모델)

  • Kim, Seon-Gyoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.90-98
    • /
    • 2007
  • Although the construction industry has been rapidly increased at its size and technologies as a locomotive of the economy development in Korea, most construction companies have not paid their attention on the construction risks seriously. However, they have been experienced a lot of business deterioration and project instability during the IMF crisis and WTO entry, and trying to figure out a way to manage the construction intrinsic risks systematically. Some top ranked construction companies have already developed and been implementing a risk management system for the oversea construction projects applying for the marketing and bidding stage, but not for the domestic construction projects during construction phase yet. This paper proposes a construction risk management system model for the site personnel to understand and manipulate very easily in the construction project.

A study on the development of a system for collecting and displaying disaster site information for disaster situation management : focusing on earthquakes (재난상황관리를 위한 재난현장정보 수집 및 표출시스템 개발 연구 : 지진을 중심으로)

  • Koo, Jee Hee;Song, Juil;Cho, Jung Yun
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.40 no.1
    • /
    • pp.31-40
    • /
    • 2022
  • The importance of disaster management and response is emerging as various disasters such as COVID-19, torrential rains, and fires occur one after another. In addition, in order to respond efficiently throughout disaster response activities, it is necessary to quickly collect disaster site information and quickly check the site situation through photo and video information so that rapid disaster response can be achieved. In this study, essential information required for decision-making was derived by analyzing the essential activities of each disaster response stage, analyzing the crisis management standard manual and related laws for each disaster type, and daily comprehensive report. In addition, a list of information necessary to grasp the situation of the disaster site and grasp the status of real-time damage was derived to establish guidelines for collecting volatile disaster site information, and disaster situation information can be efficiently displayed through a spatial information-based display system. By presenting essential disaster management information to be collected first, the person in charge of collecting information can efficiently collect information, and the situation room in charge of disaster response decision-making is expected to enable more efficient disaster situation management by receiving only the necessary information.

CALS/EC Construction for Corporate Restructuring (IMF 극복을 위한 기업의 CALS/EC 구축방안)

  • Lee, Jang-Gyoon
    • Proceedings of the CALSEC Conference
    • /
    • 1998.10a
    • /
    • pp.27-43
    • /
    • 1998
  • Recently, most corporations in Korea need to construct new management system for overcoming economic crisis. Firstly, this paper suggests “Value Creation system”. Secondly, this paper suggests CALS as strategic substitute to achieve market efficiency, capital efficiency, personal efficiency, and operation efficiency, which are four critical factors of “Value Creation system”. Korean corporations should build new business model founded on cooperation by completing CALS system and reconstruct competitive management system by using knowledge and know-how accumulated in that process. Because most corporations keep exclusive corporate culture and little experience of cooperative relationship among businesses, strategic approaches are essential for construction of CALS. These are vertical integration, organization of CALS construction teams, concurrent development of product/process, CEO's iron will, Precise vision and strategies, and education/training of participant.

  • PDF

Trend on the Curtailments of Medical and Drug Expenditure Before and After the Separation between Prescription and Dispensing in General Hospitals (의약분업 전후 일부 종합병원 진료비 및 약제진료비 삭감추이)

  • 조희숙;이선희
    • Health Policy and Management
    • /
    • v.12 no.3
    • /
    • pp.23-35
    • /
    • 2002
  • Fiscal crisis in the medical insurance system has put the pressure upon hospitals by increasing the rate of curtailment, since the implementation of the separation of prescription and dispensing of medicine. The purpose of this study is to analyse the curtailment of mdical and drug expenditure before and after the system of separation between prescribing and dispensing and to suggest the problems about current inspection system. Data were obtained from 13 general hospitals and used for analysis of trends on medical & drug expenditure, and curtailment in 1999-2000 at three months intervals. The results were as follows; The scale of curtailment for drug expenditure has been increased on outpatient and inpatient since 2000. For the curtailed drug cost with outpatient, the ratio of curtailed drug expenditure has been increased in the case of prescription within the hospital. These results suggest that review system in social insurance were over-focused to control the cost and it might to impede the validity of review function in insurance system. Therefore, it' s needed to develope the scientific and reasonable criteria for Inspection and evaluation of durg expenditure.

An Application of the Analytical Hierarchy Process (AHP) for Safety measurement in Malaysian Construction Industry

  • Samad Doostdar;Zubaidah Ismail
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.66-73
    • /
    • 2013
  • Analytical Hierarchy Process (AHP) is a famous method amongst Multi Criteria Decision Making (MCDM), set up by Saaty in 1980. AHP can be determined as a methodology of hierarchical analysis following reasonable decision making with make simpler a difficult crisis. Decision making in systems of Safety management concerned multipart challenges. AHP is process for get better the composite decisions understanding with analyzes of the problem in a structure of hierarchy. The integration all of applicable decision criteria, their pair wise judgment permits the decision maker to establish the trade-offs amongst objectives. In recent years, Malaysian's economy and infrastructure development have significantly and rapidly risen. The construction industry continues to play a major role in this development as many construction activities have been carried out to meet the high demands of the expansive market. However, the construction industry has faced a wide range of challenges, one of which is the frequent occurrences of accidents at the workplace. An effective safety program can substantially reduce accidents because it can help management to build up safer means of operations and create safe working environments for the workers. Furthermore, by having an effective safety programs, good safety culture can be embedded in organization because it can encourage mutual cooperation between management and workers in the operations of the programs and decisions that affect their safety and health. The focus of this research is development methodology of Analytics Hierarchy Process (AHP) in construction safety factors and investigates the levels of some effective elements in SMS in Malaysian construction industries.

  • PDF

A Study of the Development of a National Financial Health Maintenance in Response to Economic Crisis (경제위기 대응을 위한 국가재정 건전성 유지 발전을 위한 연구)

  • Kim, Young-Hu
    • Journal of Digital Convergence
    • /
    • v.12 no.1
    • /
    • pp.23-36
    • /
    • 2014
  • Recently economic crisis has brought world economic instability. Each country in order to stabilize the economy, fiscal rules are introduced or reinforced. Fiscal Policy in a country plays an important role in determining the economic situation in the present and future. Existing fiscal rules tend to place a rigid limit not only on the deficit ratio and thus on the scope for fiscal stabilization, but also on the extent to which fiscal policy can be used for structural purposes. But the fiscal rules are operated in many ways and adopted in various forms, with different binding of each other, according to their own fiscal situations, and political circumstances. This study shows several important factors for successful National fiscal system and continuous fiscal soundness and development.

Application of RAG(Resilience Assessment Grid) of the Aviation Safety Organization in Response to the COVID-19 Situation (코로나-19 상황에 대응하는 항공안전조직의 RAG(Resilience Assessment Grid) 적용)

  • Kim, Dae Ho
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.29 no.1
    • /
    • pp.38-46
    • /
    • 2021
  • The Organization's ability to respond to social disasters has begun to be treated as important through social shock situations that have never been experienced, such as COVID-19. Among them, the ability to respond to unexpected risks and resilience is emerging. Since social disasters such as infectious diseases are periodically repeated, compounded, and enlarged, they develop into a global crisis situation, so this crisis response capability is treated as national competitiveness. Therefore, this study aims to improve the organization's response capability in terms of risk response and resilience under rapid social disasters such as COVID-19. The aviation safety field was taken as an example. From the Safety-II perspective, safety management focuses on the ability to resilience in response to system vulnerabilities in various situations. In this study, I intend to apply RAG(Resilience Assessment Grid) of Respond, Monitor, Learn and Anticipate, the four major potential of resilience engineering. Based on Hollnagel's research, potential elements were classified into four, and items were organized through an expert panel using Delphi techniques. The final configured RAG items are 15 Respond, 15 Monitor, 15 Learn and 11 Anticipate. The RAG was evaluated by 42 experts in the field of aviation safety.