• Title/Summary/Keyword: Cost-Benefit Analysis1

Search Result 449, Processing Time 0.024 seconds

Study on Economic Analysis of Offshore and Ground-mounted Solar Photovoltaics (해상과 지상 태양광 발전 경제성 비교에 관한 연구)

  • Kyu-Won Hwang;Moon Suk Lee;Chul-Yong Lee
    • New & Renewable Energy
    • /
    • v.20 no.1
    • /
    • pp.38-51
    • /
    • 2024
  • The rapid expansion of industrialization and population growth worldwide has led to a significant surge in energy demand, perpetuating heavy reliance on finite fossil fuel reserves. Although prevailing policies primarily target ground-mounted solar photovoltaics, there is a noticeable increase in the adoption of floating solar power generation systems on water surfaces. Nonetheless, adequate studies and legislative reviews on offshore solar photovoltaics in Korea are lacking. The absence of well-defined criteria for the economic analysis of floating solar photovoltaics presents hurdles to their economic feasibility. This study conducted a comprehensive cost-benefit analysis of offshore photovoltaics to evaluate their economic viability and compared four types of solar photovoltaics based on the operating area and technology: ground-mounted, floating on inland water, pontoon-based offshore, and flexible system offshore. Perspectives from both central and local government entities, emphasizing social aspects, as well as inputs from private companies with a financial focus were considered. The findings revealed variations in economic viability depending on the operating area and technology employed. This study aims to contribute to the advancement of market maturity and technology within the realm of offshore solar photovoltaics.

Development of Evaluation Model for ITS Project using the Probabilistic Risk Analysis (확률적 위험도분석을 이용한 ITS사업의 경제성평가모형)

  • Lee, Yong-Taeck;Nam, Doo-Hee;Lim, Kang-Won
    • Journal of Korean Society of Transportation
    • /
    • v.23 no.3 s.81
    • /
    • pp.95-108
    • /
    • 2005
  • The purpose of this study is to develop the ITS evaluation model using the Probabilistic Risk Analysis (PRA) methodology and to demonstrate the goodness-of-fit of the large ITS projects through the comparative analysis between DEA and PRA model. The results of this study are summarized below. First, the evaluation mode] using PRA with Monte-Carlo Simulation(MCS) and Latin-Hypercube Sampling(LHS) is developed and applied to one of ITS projects initiated by local government. The risk factors are categorized with cost, benefit and social-economic factors. Then, PDF(Probability Density Function) parameters of these factors are estimated. The log-normal distribution, beta distribution and triangular distribution are well fitted with the market and delivered price. The triangular and uniform distributions are valid in benefit data from the simulation analysis based on the several deployment scenarios. Second, the decision making rules for the risk analysis of projects for cost and economic feasibility study are suggested. The developed PRA model is applied for the Daejeon metropolitan ITS model deployment project to validate the model. The results of cost analysis shows that Deterministic Project Cost(DPC), Deterministic Total Project Cost(DTPC) is the biased percentile values of CDF produced by PRA model and this project need Contingency Budget(CB) because these values are turned out to be less than Target Value(TV;85% value), Also, this project has high risk of DTPC and DPC because the coefficient of variation(C.V) of DTPC and DPC are 4 and 15 which are less than that of DTPC(19-28) and DPC(22-107) in construction and transportation projects. The results of economic analysis shows that total system and subsystem of this project is in type II, which means the project is economically feasible with high risk. Third, the goodness-of-fit of PRA model is verified by comparing the differences of the results between PRA and DEA model. The difference of evaluation indices is up to 68% in maximum. Because of this, the deployment priority of ITS subsystems are changed in each mode1. In results. ITS evaluation model using PRA considering the project risk with the probability distribution is superior to DEA. It makes proper decision making and the risk factors estimated by PRA model can be controlled by risk management program suggested in this paper. Further research not only to build the database of deployment data but also to develop the methodologies estimating the ITS effects with PRA model is needed to broaden the usage of PRA model for the evaluation of ITS projects.

Economic Feasibility Analysis of Developing Marine Environmental Risk Assessment and Management Technology (해양환경 위해성 평가 및 관리 기술개발사업의 경제성 분석)

  • Park, Sun-Young;Nam, Jung-Ho;Yoo, Seung-Hoon
    • Journal of Korea Technology Innovation Society
    • /
    • v.16 no.1
    • /
    • pp.20-40
    • /
    • 2013
  • A project of developing marine environmental risk assesment and management technology was proposed to improve the level of marine environmental management research. This paper attempts to measure the non-market benefits of the project. To this end, the dichotomous choice contingent valuation method is used. In particular, recently proposed one and one-half bounded model is applied. The model can reduce the potential for response bias comparing to the double bounded model while maintaining much of its efficiency. Moreover, in order to deal with zero WTP observations, a spike model is adjusted for our data. A survey of randomly selected 600 households was implemented and the respondents were asked in person-to-person interviews about how they would be willing to pay for implementing the project. Respondents overall accepted the contingent market and were willing to contribute a significant amount (2,663 won), on average, per household per year. The aggregate value of the project in the nation amounts to approximately 46.3 billion won per year. The figure 2.16 of cost-benefit ratio shows that economic validity of this technical development.

  • PDF

A Study on the Economic Feasibility Analysis of Cosmetics Beauty Industrialization Center

  • Kim, Ji-In;Park, Jeong-Min
    • Journal of the Korea Society of Computer and Information
    • /
    • v.25 no.2
    • /
    • pp.221-229
    • /
    • 2020
  • As the cosmetics beauty industry grows into a key next-generation industry, the establishment of an industrialization center is needed, but failure to verify the adequacy and feasibility of the investment could lead to financial burdens. In this study, the project costs and facilities of an industrial center are reviewed to analyze its economic feasibility based on the cost estimates, revenue estimates, estimated profit or loss calculations, and estimated operating cash flows. The profit estimation criteria were analyzed by applying 90 per cent of expected orders for research projects (24 billion won) and 12 per cent of rental rates for testing equipment (4.5 billion won for construction), and the benefit/cost ratio is higher than 1.02 per cent and the net present value is higher than '0' won, and the internal rate of return is also more than 5.06 per cent for all three analytical methods. Therefore, in order for the construction of a cosmetics beauty industrialization center to be economically feasible, it is necessary to maintain research project orders of more than 90 percent and return on equipment rent of more than 12 percent, and a strategic approach is needed to diversify business profits.

A Study on the Architectural Plan Characteristics of R&D Evaluation Center (R&D평가센터의 건축계획특성에 관한 연구)

  • Im, Yang-Bin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.12
    • /
    • pp.816-821
    • /
    • 2019
  • This study shows that it is reasonable for an R&D Information and Evaluation Center to have a building with the fifth floor above the ground and the second floor below the ground. A survey was conducted with 22,655 researchers who are registered in the NRF database. The researchers provided 883 responses. The results indicate that about 56% of the respondents positively support the construction of the NFR R&D Information and Evaluation Center. The survey results show that many respondents recognize that both evaluation and information integration functions among the NRF's roles are very important compared to other roles. The findings of the economic validity analysis support this statement. Based on the current demand for the construction of the R&D Information and Evaluation Center, this study investigates whether it is reasonable to build a new center in the available space while examining an environment focused on a physical work space and looking at significant results obtained through a cost-benefit analysis.

A Study on the Estimation Measure of Delay Cost on Work Zone Using the Traffic Flow Model (교통류 모형을 이용한 도로 점용공사 구간의 지체비용 산정방안)

  • Kim, Yunsik;Lee, Minjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.120-129
    • /
    • 2016
  • The user cost is an important analysis item which should be considered together with life-cycle of facility, administrator cost and discount rate in LCCA for efficient asset management of SOC facilities. Especially, a significant delay cost occurs often for users in the road field due to a work zone for cleaning and maintenance, and in such case, the administrator should consider the administrator cost as well as the user cost for more rational decision making. However, the user cost has not been considered in most decision making steps until recently and relevant studies also have not been carried out actively. In this study, the methodology to estimate the user cost and delay cost required in the decision making step using the traffic flow model and the direct benefit estimation model in the traffic facility investment evaluation guideline is suggested. And, the traffic flow model was estimated on 4 national highway sections where maintenance was actually carried out in 2014 using VISSIM and, the user cost and the delay cost were estimated based on the suggested methodology. The analysis result showed that the average user cost of $17,569,000KRW/km{\times}day$ occurred on Section A with approximately 30,000 AADT before a work zone occurred, and in case the first lane was blocked for maintenance, the delay cost of $10,193,000KRW/km{\times}day$ (158%) on average occurred additionally. The delay cost of $1,507,000KRW/km{\times}day$ (115%) and $1,985,000KRW/km{\times}day$ (119%) occurred on Sections B and D with approximately 20,000 AADT respectively and the delay cost of $262,000KRW/km{\times}day$ (105%) occurred on Section C with approximately 10,000 AADT. This result of this study was estimated based on the simulation of traffic flow model so that there is a limitation in its actual application. A study ot develop a highly appropriate model using actual observation data and improve the possibility to apply it through the verification using the simulation will be necessary in future.

A Study on High-level FSA for Korean-flagged General Cargo Ships (국적일반화물선 초기안전성평가 연구(2))

  • Lee, Jong-Kap;Na, Seong;Kim, Hong-Tae
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2010.10a
    • /
    • pp.112-117
    • /
    • 2010
  • 본 논문은, 국적일반화물선 공식안전성평가(Formal Safety Assessment, 이하 FSA) 연구의 1, 2 단계에 해당하는 위험요소 식별(Hazard identification) 및 식별된 사고 시나리오에 대한 위험도 분석(Risk analysis) 결과를 소개한 "국적일반화물선 초기안전성평가 연구(1)"에 이어서 FSA 연구의 3, 4 그리고 5단계의 내용으로, 국적일반화물선의 위험도 수준을 저감할 수 있는 위험도제어방안들(Risk Control Options)을 식별하는 단계(Step 3)와 식별된 위험도제어방안들 중 전문가 의견수렴을 통하여 선별된 위험도제어방안들을 대상으로 한 비용-효과 평가 단계(Step 4: Cost-Benefit Assessment) 그리고 비용-효과 평가의 결과를 정리하여 국적일반화물선의 안전성 제고를 위한 구체적인 방안을 제안하는 단계(Step 5: Recommendation for Decision Making)의 결과를 소개하였다.

  • PDF

A theoretical study on Determinants of National Competitive Advantage (산업의 국제경쟁력 결정요인에 관한 이론적 관찰)

  • 이학헌;민성규
    • Journal of the Korean Institute of Navigation
    • /
    • v.19 no.1
    • /
    • pp.49-69
    • /
    • 1995
  • What is the national competitive power\ulcorner What are the determinants of national competitive advantage\ulcorner In order to find these problems, this study was initiated theoretically through the international trade theory and international managerial strategic theory. The flow of studies, in connection with these competitive advantage, come into industries competitive advantage from national competitive advantage. It is understood that the flow of studies is based on the change of paradigm about the international industry environment. Today, the international industry environment has been changed into vigorous situation with the new trade system such as globalization, UR negotiation, WTO system instead of GATT. Among these environments, all enterprises in any industries should try to enhance their benefit, income profits and develop their management strategy, because it is essential for them to keep and make a profit in order to be competitive against all other rivaling enterprises. According to researchers and the ages of history, the concept and determinants of competitive advantage have been dissimiliar as followings. 1) Theory of absolute advantage : Absolute Product Cost. 2) Theory of comparative advantage : Comparative Product Cost. 3) Theory of reciprocal demand : the Reciprocal Demand Structure. 4) Theory of Hechsher-Ohlin : Factor Endowment. 5) Paradox of Leontief : the Quality of Factor Endowment. 6) Theory of technological gap : R & D. 7) Technological gap model : The Technological Gap. 8) Theory of the product life cycle : Product Life Cycle. 9) Christensen's study : Firm's character & manager's character. 10) Monopolistic Advantage Theories : Monopolistic Advantage 11) Electic theory : Ownership, location and internalization specific advantages. 12) Theory of value chain : Cost advantage, Differentiation, Focus. However all these theories have the limit of illustration regarding today's competitive situation, the Porter's theory shows well the determinants of competitive advantage with competitive strategy. Therefore, the analysis of the competitive advantage for maritime industry should be studied by the determinants of competitive advantage of nations

  • PDF

A Study on the EPS Process of Quantitative Risk Assessment for the Safety Decision Making (EPS 공정의 정량적 위험성 평가를 통한 안전의사결정에 관한 연구)

  • 정재희;김형석;최광석;이영순
    • Journal of the Korean Society of Safety
    • /
    • v.14 no.2
    • /
    • pp.62-69
    • /
    • 1999
  • The quantitative risk assessment and consequence analysis by accident scenario in the process of EPS(Expendable Poly Stylene) reaction process are conducted. And the decision making process is studied followed by selecting various alternatives to safety management and facility improvement. The result are as follows; 1) The object of decision making through comprehensive risk assessment are the scenario which can cause four major accident, which are made by process analysis, work analysis and hazard identification. 2) Frequency analysis of ETA, FTA, HRA and consequence analysis of accident to each have been conducted. The each frequency values are yielded $9.2{\times}10_{-5}/yr$ to scenarios $1, 8.2{\times}10^{-4}/yr$ to scenario 2, $4.5{\times}10^{-6}/yr$ scenario 3 and $1.8{\times}10^{-7}/yr$ to scenario 4. The each scenarios have been conducted consequence analysis. 3) The calculated values have been obtained 4.00 to scenario 1, 3.25 to scenario 2, 2.43 to scenario 3 and 1.34 to scenario 4, as the weight value had been applied to the quantitative and normalized criteria of all components. As a risk criteria, scenario 1 have been selected, which is the most dangerous scenario as a result of ranking the scenario. 4) According to the importance of FTA and contribute to scenario 1, the cost-benefit values are yielded $8.05\times10^5[₩/yr]$ to final alternative(Al), $1.55{\times}10^5[₩/yr]$ to final alternative(A2) and $2.32{\times}10^5[₩/yr]$ to final alternative(A3). As a result of final alternative(Al) has been selected, which is the most optimized alternative.

  • PDF

A Comparative Study of Economical Efficiency in Apartment Security System: Focused on a Enhancing the Effectiveness of Senior Employment Programs (아파트 유·무인 경비시스템의 경제성 비교 연구: 노인일자리 사업의 효용성 제고를 중심으로)

  • Ha, Jai-Ryong;Lee, Kwang-Won
    • Korean Security Journal
    • /
    • no.41
    • /
    • pp.7-36
    • /
    • 2014
  • Recently the Korean government announced that minimum wage policy would be applied even to apartment security staffs by 2015 who had been waived from the policy enforcement for their unique work conditions. This caused apartment management to introduce unmanned security system instead of employing security staffs because of fearing possible hike of management fees. People recklessly tend to believe unmaned system is cheaper than maned system if minimum wage guideline is applied. This study examines the economic feasibility of two different apartment security systems by utilizing cost-benefit analysis: maned and unmaned security systems. The authors estimate the costs and the benefits of each security system for 5 years(2014-2018) with application of social discount rate(5.5%). Thirty six apartment complexes at 8 different areas(meons and dongs) in Asan, Chungcheongnam-do province were surveyed. And to attain the exact costs of unmaned system establishment and operation, the authors interviewed persons working for the unmaned security corporations. The benefit-cost(B/C) ratio for unmanned security system is 1.66% at minimum and 1.30% at maximum. while B/C ratio for manned security system is 1.42% and 1.66% respectively. This results mean that people's belief is not correct, that is, transferring from maned system to unmaned is not always economically efficient. Benefits of maned security system is more diverse than unmaned system. The former provides living conveniences(parking helps and keeping parcels) and social benefits(employing aged worker and giving them opportunities to enjoy happier lives) as well as security benefits like crime prevention. The latter provides security benefits only, but that effect is also doubtable. Taking into account these diverse benefits maned system provides, the B/C ratio of maned system is equitable or higher than unmaned system.

  • PDF