1 |
I. J. Bateman, K. G. Willis, Valuing Environmental Preferences: theory and practice of the contingent valuation method in the US, EU, and developing countries, p.645, Oxford University Press on Demand, 2001. pp.3-30.
|
2 |
J. F. Hair, W. C. Black, B. J. Babin, R. E. Anderson, Multivariate Data Analysis (5th ed.). p. 285, Prentice Hall, 2010.
|
3 |
G. A. Morgan, N. L Leech, G. W. Gloeckner, K. C. Barrett, IBM SPSS for introductory statistics: use and interpretation (5th ed.). p.320, New York, NY: Routledge, 2013.
|
4 |
B. J. Lee, J. H. Park, H. S. Lee, "An Empirical Study on the Promotion Strategy for IT Convergence: An Industrial Ecology Perspective", Journal of the Korea Academia-Industrial cooperation Society, vol.15, no.3, pp.1327-1333, 2014. DOI: http://dx.doi.org/10.5762/KAIS.2016.17.11.410
DOI
|
5 |
J. E. Lee, "A Preliminary Study on the Promotion Strategy for IT Convergence: An Industrial Ecology Perspective", Journal of the Korea Academia-Industrial cooperation Society, vol.15, no.3, pp.1327-1333, 2014. DOI: http://dx.doi.org/10.5762/KAIS.2014.15.3.1327
DOI
|
6 |
S. Yim, S. Kim, M. Shin, "A Study on the Performance Method for National Research and Development Projects", Journal of the Korea Academia-Industrial cooperation Society, vol.15, no.7, pp.4148-4156, 2014. DOI: http://dx.doi.org/10.5762/KAIS.2014.15.7.4148
DOI
|
7 |
Y. Yang, J. Choi, "The Effective Technology Commercialization of Government Research Institutes: focus Daedeok Innopolis Research Company, Journal of the Korea Academia-Industrial cooperation Society, vol.11, no.1, pp.287-294, 2010.
DOI
|
8 |
G. C. Kim, Feasibility & Preliminary Plan of Research Institute Building Construction, p.185, Health & Environment Institute of Gyeong Gi Province, 2016.
|
9 |
C. H. Kim, A Study on the Feasibility & Preliminary Plan of NRF R&D Center Construction, p.85, NRF, 2011.
|
10 |
R. C. Mitchell, R. T. Carson, Using Surveys to Value Public Goods: the contingent valuation method. p.411, RFF Press, 2013.
|