A Study on the Obstacle Factors of Construction Works in terms of the Specialty Contractors (전문건설업체 측면에서 전문공종 시공업무 장애 요인에 관한 연구)

  • Yang, Jin-Kook;Lee, Ki-Hun;Lee, Sang-Beom
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.155-156
    • /
    • 2021
  • Most of the construction works in domestic are not direct undertaking work, but by a contract method including subcontracting. Therefore, a general contractor for each project jointly carry out construction work with a specialty contractor for each engineering type. However, in terms of contract, this method is not a joint venture contract, but a subcontract. Accordingly, this system can cause various problems between the prime contractor and the subcontractor. Therefore, this study aims to extract and present the actual obstacle factors in terms of specialty contract company performing specialty construction work for construction project. The presented contents are expected to present the standard for the cooperation system that the prime contractor and the subcontractor can win-win.

  • PDF

A Comparative Study of the Legal Regulations on Contracting for Dangerous Work (위험작업 도급에 관한 법규제의 비교법적 고찰)

  • Jung, Jin-Woo
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.32 no.3
    • /
    • pp.279-286
    • /
    • 2022
  • Objectives: South Korea's occupational safety and health legislation appears on the surface to have stronger regulations than any other country, but it is criticized for having many problems when viewed from the perspective of the effectiveness and universality of these regulations. Therefore, it is necessary to consider the validity of the regulatory content and the methods for contract work in South Korea. Methods: The main issues in contract work are compared and analyzed in terms of the occupational safety and health laws systems in South Korea and other developed countries. Based on this, problems related to contract regulation are derived from the perspective of legal policy studies. In addition, effective improvement measures for the derived problems will be proposed. Results: Other developed countries impose obligations suitable for the status and role of persons who entrust work in consideration of the fact that they do not directly manage risks and in terms of the effectiveness of industrial accident prevention. These countries generally impose obligations such as management of facilities and machinery, cooperation and coordination with subcontractors, cooperation and coordination obligations between subcontractors, and guidance obligations on a person who entrusts a work. Conclusions: It is difficult to achieve effectiveness in preventing accidents with based on unreasonable regulations that do not conform to safety principles or legal theory. Regulations on contract work need to be converted to rational cogent regulations based on science and rationality, not ideology and emotion. To this end, the legal system for contract work must have international universality.

The Impact of Coworker Relationship of Employees on Quality of Work Life in Contract Foodservice (위탁급식 종사원의 동료관계가 생활의 질에 미치는 영향)

  • Han, Kyung Soo;Lee, Jung Tak
    • Journal of the Korean Society of Food Culture
    • /
    • v.31 no.2
    • /
    • pp.161-169
    • /
    • 2016
  • This study examined co-worker relationship on of life between employees of contract foodservice in general hospital. Contract foodservice managed general hospitals surveyed from 1 October 2015 to 31 October 2015. A total of 230 questionnaires (cook-30 questionnaires, nutritionist-50 questionnaires, cook's helper-150 questionnaires) were distributed, and 177 questionnaires were used for the study. As a result, the quality of life of employees contract foodservice general hospital was composed of sub-factors (employee engagement, stress at work, home-work interface, working condition, general well-being). co-worker relationship was composed of sub-factors (cooperative co-worker relationship, competitive co-worker relationship). Causal relationship between variables was through regression analysis, and significant results were shown. ooperative co-worker relationship had an effect on employee engagement, stress at work, working condition and general well-being. competitive co-worker relationship.

Practical Reasonability for Introducing Separate Contract Award System Concerning Asbestos Removal (건축주가 직접 발주한 석면해체공사 도급의 타당성에 관한 연구)

  • Son, Ki-Sang;Gal, Won-Mo;Kim, Hyoung-Suk
    • Journal of the Korea Safety Management & Science
    • /
    • v.13 no.2
    • /
    • pp.259-266
    • /
    • 2011
  • Project owner, asbestos removal specialist, experts on asbestos removal work, as counter parts to be defined in the study to make out research goals have been asked with questionnaire survey and replied with 65, 275, 32 cases, respectively. And additionally, direct interview 73 sheets have been collected to find out current status of required engineers and equipments assigned and provided to the field, from them, three(3) concerned parties. Questionnaire subjects are composed of common items, reasonable unit cost, need of separate contract-awarding system, status of performing standard contract, status of providing legal engineers and equipments. Concentrated review of two~three questions by subject has been made to find out and compare idea results between three(3) concerned parties. First, legal and practical work status survey have been made to determine reasonability of introducing separate contract-awarding system, as a part of ensuring reasonable unit work cost. And then, two different status have been compared and there is introduction possibility of separate contract-awarding system, it is found out. The possibility of separate contract also has been confirmed by comparison of domestic legal grounds. Justificating grounds to introduce separate contract-awarding system have been shown. Standard contract status between asbestos removal specialists has been compared using two cases of providing removal work contract and receiving it. It is shown that case of 50 percent or less contains 38.5% when they receive contract, but only 10 percent reduction of original contract amount has been made when they provide it. It means that asbestos removal specialists do not keep occupational safety and health regulations.

A Study on the Hygiene Practices of Foodservice Employees by Hygiene Education and Work Environment in the Gyeongnam Area (경남지역 위탁급식업체 조리종사자의 위생교육 및 근무환경에 따른 위생 직무수행도 평가)

  • Lim, Jung-Hee;Kim, Hyun-Ah;Jung, Hyun-Young
    • Journal of the Korean Dietetic Association
    • /
    • v.19 no.3
    • /
    • pp.209-222
    • /
    • 2013
  • This study examined the hygiene practices of contract foodservice employees and investigated the influence of education and work environment on these hygienes practices. A questionnaire was distributed to 250 contract foodservice employees and a total of 232 responses were received and analyzed. The overall score for hygiene practices of contract foodservice employees was 3.89 based on a 5-point scale. Cross-contamination was prominent (highest score at 4.46) and the heating temperature was less prominent (lowest score at 3.49). The factors most affecting contract foodservice employees were their work period, the size of the contract foodservice management company, the number of meals served daily, the frequency of meal service per day and the frequency of hygiene education. Compared to small and medium-sized contract foodservice management companies, the major contract foodservice management companies showed higher scores for refrigerator/freezer control (P<0.001), vegetable/fruit disinfection (P<0.001), thawing (P<0.001), heating temperature (P<0.001), cleaning/disinfection (P<0.01), and personal hygiene (P<0.05). The frequency of hygiene education had a significant effect on the performance levels for refrigerator/freezer control (P<0.001), vegetable/fruit disinfection (P<0.001), thawing (P<0.001), heating temperature (P<0.001), cleaning/disinfection control (P<0.001), food supply control (P<0.05), and personal hygiene (P<0.05). From these results, to increase the sanitation quality of contract foodservice operations, hygiene practice levels need to increase and hygiene education systematically should be enforced for foodservice employees.

Interpretation Principle of Construction Contract for harmonious Management of Construction Work (건설공사의 원활한 관리를 위한 공사계약의 해석방향 -판례 및 중재판정을 중심으로-)

  • Doo Sung-Kyu
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.31-36
    • /
    • 2001
  • Construction contract have great possibility of dispute between contract parties because of long term performance of contract, various participation of the person concerned, effect according to external environment, etc. It is needed correct comprehension and construction management because good reason of claims depends upon contract document or clauses of the related laws and regulations in cases. The purpose of this study is to suggest desirable Interpretation principle for the harmonious management of the construction work in the cases or arbitration adjudication.

  • PDF

A Study on Some Issues of Business and Law in relation to ICC Model Turnkey Contract - Focusing on ICC Model Contract for Turnkey Supply of Industrial Plant (ICC모델 턴키 계약의 쟁점에 관한 연구 - ICC Model Contract for Turnkey Supply of Industrial Plant를 중심으로 -)

  • Kim, Kyoung-Ok;Kim, Dae-Hwan
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.54
    • /
    • pp.189-209
    • /
    • 2012
  • This Work intends to study on some issues of business and law in relation to Contract for Turnkey Base System. The continuing advance of export system of the plant with the importance for efficient and effective management emphasizes the need for business and legal approach to uniform international model contract. ICC Model Contract for Turnkey Supply of Industrial Plant by ICC covers a particular category of turnkey contract, i.e. contracts for the supply of a plant or production line to be erected within facilities which already exist or which are constructed by the purchaser. Furthermore, the application of the ICC Model Contract for Turnkey Supply of Industrial Plant leaves much to be desired from a business and legal point of view. Therefore, there would appear to be room for compromise between the supplier and purchaser in respect to make a contact for Turnkey supply of industrial plant.

  • PDF

Role Based Smart Contract For Data sharing

  • Joachim, Kweka Bruno;Rhee, Kyung-Hyune
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2018.10a
    • /
    • pp.235-237
    • /
    • 2018
  • The Internet has allowed many things to move fast, including sharing of data, files and others within a second. Many domains use applications range from IoT, smart cities, healthcare, and organizations to share the data when necessary. However, there are some challenges faced by existing systems that works on centralized nature. Such challenges are data breach, trustiness issue, unauthorized access and data fraud. Therefore in this work, we focus on using a smart contract which is used by blockchain platform and works on decentralized form. Furthermore, in this work our contract provides an access to the file uploaded onto the decentralized storage such as IPFS. By leveraging smart contract-role based which consist of a contract owner who can manage the users when access the certain resources such as a file and as well as use of decentralized storage to avoid single point of failure and censorship over secure communication channel. We checked the gas cost of the smart contract since most of contracts tends to be a high cost.

Making Formular to calculate Reasonable Unit Cost for Asbestos Removal (석면해체공사의 적정 단가 산정)

  • Son, Ki-Sang;Park, Jong-Tae;Gal, Won-Mo
    • Journal of the Korea Safety Management & Science
    • /
    • v.13 no.3
    • /
    • pp.55-61
    • /
    • 2011
  • Unit cost for asbestos removal work which have been made out at government contract award for recent three years has been reviewed and shown with table. And the cost have been compared with ones made out by two agencies, American asbestos removal specialists, government ministry for making out comparison tables. First, legal and practical work status survey have been made to determine reasonability of introducing separate contract-awarding system, as a part of ensuring reasonable unit work cost. And then, two different status have been compared and there in introduction possibility of separate contract-awarding system, it is found out. In interior removal work case, it is thought that 50% by owner, 60% unit work cost by the expert of which removal specialist think as reasonable unit cost. the results for exterior and spray work method are shown with almost same context. Impact factors for determining unit work cost such as project mount, project kind, contract-awarding method, subcontract method have been compared with parties. Removal specialist and expert group have almost same ideas for project amount which has been hightestly weighed but owner's recognition has partially lower than specialists idea. There are almost no difference of recognition between three(3) parties for project kind. Idea comparison of reasonable unit work cost for asbestos removal work between three concerned parties has been analyzed and found out that expert group do unit work cost, 65% of which removal specialists estimate, in interior tex removal. And there is almost no difference between them in exterior roof slate removal. But there is considerable difference between them that owner estimates 50% unit cost of specialist one while expert group estimate 50% of specialist idea of unit removal cost.

Development of Project Delivery System for Modular Building in Korea

  • Nam, Sung-hoon;Kim, Kyung-rai;Lee, Dong-gun;Heo, So-young
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.704-705
    • /
    • 2015
  • Recent research has been ongoing for modular buildings in the country, and interest increases. However, in accordance with legal restrictions in the country with regard to Project Delivery system of Modular Building, the activation of modular buildings industry is obstructed. In Korea, in accordance with national contract law, the construction contract is apply to the project delivery system of modular buildings, and in accordance with Framework Act on the Construction Industry, The project delivery system of modular buildings has to be a separate order. The definition of separate order in contract as defined in the law is that the electric work and Communication work and digestion facility work has to be separate each contract in order to be ensured professionalism. In accordance with law, the project delivery system of modular buildings is that the contract for construction is concluded with the Owner and the Construction Contractor and the contract for goods is concluded with the construction Contractor and modular manufacturer. Due to these project delivery system, the domestic factory production rate when making a modular unit is significantly reduced compared to the rate of factory production abroad and the domestic factory production rate is estimated to 10-20%. Due to the factory production rate is also low, despite what can be done at the factory the workload in construction field increases. According to the workload in field increases, the effect of the schedule reduction can be reduced. It resolved to form a consortium with a modular manufacturer and construction companies or the contract is concluded with Owner, modular manufacturer and construction companies in each. In this paper, we propose a specific project delivery system for modular building to solve the problem of the low factory production rate and the problem of schedule reduction. Through this paper, due to the variety of project delivery system on modular buildings is expected to contribute to the activation of modular buildings.

  • PDF