• 제목/요약/키워드: Construction of evaluation

검색결과 5,359건 처리시간 0.026초

건설공사 시공평가 시기 조정 (Adjust timing of Construction Construction Evaluation)

  • 윤지호;남경우;장명훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 춘계 학술논문 발표대회
    • /
    • pp.78-79
    • /
    • 2019
  • A construction project with a total construction cost of over 10 billion KRW should be evaluated whether construction works are appropriately executed. The evaluation is carried out on quality management, process management, construction management, safety management, environmental management. The implementation period is within 60 days after completion of construction of the construction, from the time when the construction rate of the construction work has progressed by more than 90% to the construction cost. However, the participating construction engineers should prepare the evaluation within the period according to the evaluation criteria, but there are difficulties in preparation for the evaluation due to the reasons such as the change of engineers in charge and loss of data. Therefore, this study proposes the procedure of construction evaluation and adjusts timing of construction evaluation.

  • PDF

건설공사 사후평가결과보고서 표준화 방안 (Standardization for Post-Construction Evaluation Report)

  • 김경훈;이찬규
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.289-290
    • /
    • 2023
  • According to relevant laws, in the case of a construction project with a total construction cost of 30 billion won or more, a post-construction evaluation must be performed after completion. In addition, a post-construction evaluation report must be prepared and entered into the Continuous Acquisition & Life-cycle Support(CALS). As a result of reviewing the currently accumulated post-construction evaluation reports, since the report is not standardized, it is difficult for public project owners to write the report. It also hinders the post-construction evaluation and management center from verifying contents, analyzing data, and deriving meaningful results. In order to improve the convenience of the public owners who must conduct post-construction evaluations and the work efficiency of the center, evaluation factors were standardized and a standard post-construction evaluation report format for road construction was developed in Excel. Through this, the data in the reports will be effectively accumulated, managed, and analyzed, so that meaningful results will be produced and be helpful in future construction work.

  • PDF

건설공사 사후평가 제도 활성화 방안 수립 (Strategies for Facilitating Post-Construction Evaluation and Management System)

  • 이강욱
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.379-380
    • /
    • 2023
  • The Post-Construction Evaluation and Management System has been operated over the past 20 years not only to analyze the performance of large-scale construction projects, and but also to provide useful reference data for future similar projects. Although the Post-Construction Evaluation and Management Center has been legally designated and operated since 2020, various problems have been occurring in the operation of the system. Accordingly, this study proposes strategies for facilitating Post-Construction Evaluation and Management System in terms of the following three aspects: (1) improving the implementation rate of post-construction evaluation; (2) improving the information management system related to post-construction evaluation; (3) improving the utilization of post-construction evaluation outcomes. Based on the results of this study, a specific action plan will be prepared, which is expected to contribute to the efficiency of construction project performance management in the future.

  • PDF

건설사업 수행성과평가에 대한 분석 고도화 연구 (A Study on Advanced Analysis of Construction Project Performance Evaluation)

  • 김경훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.329-330
    • /
    • 2023
  • The performance of the construction project is to be evaluated within 60 days of completion, according to relevant laws. It evaluates cost, construction period, design change, re-construction, safety, etc. for each project stage. And the project owners are inputting the evaluation results of the construction work into the construction project information system(CALS). The post-evaluation result information entered in this way can be referred to in the basic design of the construction project by referring to the related contents if there is a similar construction in the future. And It can also be used to predict and respond to the required period and cost by analyzing the accumulated data. In this study, in order to provide reference data that can be used in similar projects in the future, the latest analysis methods are reviewed and the possibility of future application is considered. Accordingly, this study intends to focus on the construction cost part among the indicators such as construction cost, construction period, design change, and re-construction that are currently being dealt with in post evaluation.

  • PDF

건설공사 사후평가 수행결과 활용도 개선 방안 (Improvement scheme of utilization of the results of the post-construction evaluation system)

  • 이두헌;박재우
    • 한국건설관리학회논문집
    • /
    • 제14권6호
    • /
    • pp.78-89
    • /
    • 2013
  • 건설공사 사후평가 제도는 공공건설사업 수행결과를 반영하여 향후 유사한 공공건설사업의 계획 수립 시 활용되어져야 하나, 현행 제도는 당초 기획 계획 당시에 추정한 수요, B/C비율, 공사비, 공사기간 등 예측치와 건설공사 완공후 일정기간(3년 내지 5년) 경과후에 측정한 실제 결과치를 단순히 비교하여 제시하는 수준에 그치고 있다. 또한 대부분 공공발주기관에서는 수동적인 사후평가 업무수행에 그치고 있어 제대로 환류가 이루어지않고 있다. 이에 본 연구에서는 공공발주기관을 대상으로 설문조사를 실시하여 건설공사 사후평가 제도의 수행현황을 파악하였으며, 국내 사후평가 제도와 유사한 미국과 일본의 건설사업 평가체계를 벤치마킹하였다. 또한, 건설공사 사후평가 제도와 관련된 국토부 실무담당자와의 수차례 업무회의를 실시하여 사후평가 수행의 적시성 확보 및 활용성 강화방안을 제시하였다. 이와 같이 건설공사 사후평가 제도 개선을 통해 건설사업 수행과정에서의 목표 및 성과에 대한 확인 점검 분석 체계를 내실화하고, 건설공사 특성별로 평가내용 및 방법을 차등화함으로써 발주청의 사후평가 수행에 대한 실천력이 제고될 것으로 기대된다.

Developing an IFC-based database for construction quality evaluation

  • Xu, Zhao;Li, Bingjing;Li, Qiming
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.301-312
    • /
    • 2017
  • Quality evaluation and control represent increasingly important concerns for construction quality management. There is an evident need for a standard data model to be used as the basis for computer-aided quality management. This study focuses on how to realize evaluation of construction quality based on BIM and database technology. In this paper, the reinforced concrete main structure is taken as an example, and the BP neural network evaluation model is established by inquiring current construction quality acceptance specification and evaluation standard. Furthermore, IFC standard is extended to integrate quality evaluation information and realize the mapping of evaluation information in BIM model, contributing to the visualization and transfer sharing of evaluation information. Furthermore, the conceptual entity model is designed to build quality evaluation database, and this paper select MySQL workbench system to achieve the establishment of the database. This study is organized to realize the requirement of visualization and data integration on construction quality evaluation which makes it more effective, convenient, intuitive, easy to find quality problems and provide more comprehensive and reliable data for the quality management of construction enterprises and official construction administratiors.

  • PDF

일본의 건설정책 평가제도 고찰 (A study of the Japanese Construction Policy Evaluation System)

  • 이영호;이교선
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.185-188
    • /
    • 2012
  • As a separate project unit, the domestic construction policy evaluation is independently evaluated and managed by different involvements, so that it has been difficult to have a consistent policy evaluation to be performed. In this paper, thus, it is aimed to give an overview of the evaluation system and issues of domestic construction policy and suggest strategies of a improved evaluation system by a comprehensive benchmarking of construction policy evaluation system of Japan. The implications of this paper will serve a basis of improvement of a better construction policy evaluation system in Korea.

  • PDF

A STUDY ON THE IMPROVEMENT OF POST-EVALUATION ITEM FOR PERFORMANCE MEASUREMENT IN THE BUILDING CONSTRUCTION

  • Lee, Eun-Ji;Ha, Hee-Yoon;Ko, Hyun;Kim, Jae-won;Kim, Jae-Jun
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.407-416
    • /
    • 2007
  • The construction industry in South Korea is experiencing great changes: it is becoming developed on a larger scale, specialized to a high degree and rapidly incorporating with other industries. This development has resulted in higher demand of construction industry. Accordingly, the transparency and an objective method of evaluation in the process of projects in the construction industry are gaining more importance. Clients' and customers' needs also require more specific objective evaluation to find whether their projects are successfully performed or not. This study aims to discuss problems on the current post-evaluation items including the qualitative item analysis such as customer satisfaction. Moreover, this paper suggests the improved ways in which enable the application of the effective evaluation system to the construction industry.

  • PDF

건설안전 분야 평가항목에 대한 연구 -국내 건설공사현장을 중심으로- (Research on construction safety assessment topic areas -Focusing on domestic construction site-)

  • 안광용;강경식
    • 대한안전경영과학회지
    • /
    • 제17권4호
    • /
    • pp.1-12
    • /
    • 2015
  • Recent construction site large disaster occurs in, even normal disaster not be reduced, the efforts of pre-disaster prevention for this is also a need to study the evaluation index. By comprehensive examination zero reform the current lowest bid system has included the social responsibility index is scheduled, objective and quantitative evaluation indicators making construction safety areas that are included in the item of social responsibility is required ing. In this study, the construction, in order to prevent disasters, efforts pre disaster prevention be presented metrics in the construction safety in the field of comprehensive examination system and the evaluation index, it is intended to examine the evaluation items for the evaluation indices.

건설사업관리자(CMr) 측면에서 건설기술용역 평가의 CSFs 추출 및 AHP 중요도 분석 (CSFs Extraction and AHP Importance Analysis for Construction Technology Services Evaluation in terms of Construction Manager)

  • 양진국;홍성욱
    • 대한건축학회논문집:구조계
    • /
    • 제36권3호
    • /
    • pp.129-134
    • /
    • 2020
  • The current evaluation time period for the construction management service is the project completion or after project completion. Therefore, the construction manager has the following problems. First, it is difficult to prepare the evaluation due to the new field movement of the existing participating engineer. Next, the CM work is complex as well as extensive. Therefore, the critical success factors of the construction technology services evaluation are required as a systematic performance standard of CM work. In this study, we extracted the critical success factors that can systematically prepare the evaluation from the early stage of the project through in - depth interviews with experts. And, this study was analyze the priority of each factor by using AHP technique. As a result, the most important factors were related to the systemization of the preparation process, the construction manager work capabilities and practical construction management. And the priorities of all factors were analyzed high in the factors suggested by the owner groups. The results of this analysis are expected to provide the standards that construction management service performer carry out structured management of construction management throughout the project.