• Title/Summary/Keyword: Construction Standard Production Rates

Search Result 14, Processing Time 0.027 seconds

A Study on Development of Construction Standard Production Rates and Cost Analysis for Off-Site Construction (OSC)-Based PC Structure Construction Costs - Comparison with RC Method - (OSC기반 PC구조 공사비 산정을 위한 품셈개발 및 공사비 분석 - RC공법과 비교 -)

  • Lee, Hansoo;Lee, Chiho;Han, Heesu;Lee, Jeongwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.2
    • /
    • pp.56-68
    • /
    • 2024
  • A construction standard production rates system for the factory built and on-site installation phases of OSC (Off-Site Construction)-based precast concrete (PC) structures in apartment buildings was recently proposed to establish an objective cost standard (Lee et al., 2021). In addition, the Korean government has taken steps to improve the institutional foundation for the systematic calculation of PC construction costs such as revising construction standard production rates for major components that can be applied to the on-site installation phase of PC method. In this study, we analyzed the results of a field survey of apartment building PC structures and collected expert opinions to develop factory-built and on-site installation standard production rates that can be applied to apartment building PC method. We also propose directions for improving the standard production rates so that they can be applied to the site and component of apartment buildings by comparing them with the current standard production rates. This study also derived the cost characteristics and cost reduction measures of PC construction by calculating the construction costs using the developed rates and comparing the construction costs with the RC methods of apartment buildings of the same scale. The construction standard production rates for PC construction derived in this study are expected to contribute to the spread of PC construction by ensuring the objectivity and consistency of the results of PC methods cost estimation.

A Study on the Development of Construction Production Rates System for Estimating Proper Construction Expenses of Off-Site Construction (OSC) Based PC Structure Factory-Built Assembly (OSC기반 PC구조 공장제작 적정 공사비 산정을 위한 품셈체계 개발 연구)

  • Lee, Jeongwook;Lee, Hansoo;Lee, Chiho;Noh, Hyunseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.89-100
    • /
    • 2022
  • The development of the Construction Production Rates System for appropriate construction cost calculation has recently come to the fore as a means of invigorating OSC based PC structure which currently needs institutional frameworks. PC structure based construction expenses consist of the factory-built assembly, transportation and on-site installation. Recently, in the field of transportation and site installation, research on product structure development is being conducted, such as presenting the standard product calculation system reflecting the results of field survey for each subsidiary materials (Lee et al., 2021). On the other hand, there is no ongoing research on estimating construction expenses of Factory-built assembly. This study suggests Construction Production Rates System which can be used for PC subsidiary materials based Factory-built assembly cost estimations. For the research, work types for the construction procedures have been categorized, and the standard input manpower suitable for the corresponding work characteristics has been derived from analyzing the associated Construction Standard Production Rates for each work type. Also, as the research referred PC subsidiary materials (such as columns, beams, walls, and slab, as well as on-site installation) and the standard number of workforce based on work types, one can calculate direct labor cost, using what the research shows. In addition, it suggests that the size of individual subsidiary materials be the extra cost factor, by using the characteristics that productivity changes depending on the size(m3) of subsidiary materials. It is expected that the research can contribute to objectively verifying factory-built assembly cost through of PC structure, which currently relies on estimates.

Data Collection Methodology of Activity Production Rates for Contract Time Determination

  • Huh Youngki;Kim Changwan;Song Jongchul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.114-123
    • /
    • 2004
  • Contract time determination for highway construction projects has never been easy despite considerable research efforts from academia as well as industry. High variations in crew production rates are considered one of the main barriers to accurate contract time determination. This paper presents a methodology for collecting field information on crew production rates which will help to enhance the accuracy of contract time determination for highway bridge construction. Based on a standard data collection tool developed, data on field crew production rates was collected from 14 on going projects in Texas, USA, over the past two years. The production rates based on the data collected were considered by industry practitioners to be more realistic and practical than those available to the current practices. As more data becomes available, key drivers influencing production rates could be identified and provide site personnel with a means to better plan and control production in a project specific context.

A study on the Composition of the Production Rates System to Prepare Standards for Calculating the Construction Cost of PC Structure Apartments Based on Off-Site Construction (OSC) (OSC 기반 PC구조 공동주택 공사비 산정기준 마련을 위한 품셈 체계 구성에 관한 연구)

  • Lee, Hansoo;Lee, Chiho;Lee, Jeongwook;Noh, Hyunseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.96-106
    • /
    • 2021
  • The PC structure based on the OSC (Off-Site Construction) is mentioned as a representative method of innovation in the construction industry that converts the existing construction environment from site-centered to factory production-transportation-site assembly. However, recent research on PC method has focused on improving the functions of subsidiary materials and improving the production system to increase productivity and institutional / policy R&D that can be universally applied to the life-cycle stage of ordering / design /construction is insufficient. In particular, the absence of standardized cost calculation standards makes it difficult to calculate and verify of objectified appropriate construction cost. So which is an obstacle to the activation of the PC method. In this study, the standards for construction costs of domestic and foreign PC method were surveyed and similar Construction Standard Production Rates were analyzed to confirm the product structure suitable for PC method. Subsequently, the construction procedures and input resources for each PC subsidiary materials were identified through on-site surveys to derive component for subsidiary materials, and the factors of change in the product according to the construction characteristics(height, weight of subsidiary material) were verified. As a result the standard product calculation system suitable for the site installation of the PC method for apartment was presented.

Estimation of Construction Equipment Production Rates based on Simulation;Cycle time of backhoe & loader (시뮬레이션에 의한 건설기계 시공능력 산정;굴삭기&로우더의 사이클타임)

  • Han, Ye-Ryeong;Park, Hee-Sung;Chang, Chul-Ki
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.6
    • /
    • pp.105-111
    • /
    • 2009
  • Construction equipment is a very important factor for successful construction. Also, the cost for construction equipment is a major part of the cost of construction. Therefore, the estimation of the equipment cost is a critical task in construction planning. A formula for production rates shown in 'Standard Unit Labor' has been used to estimate construction equipment capability and cost. Although the performance of the equipment has improved over time, the variables in the formula have not been updated in a timely manner. Therefore, this paper has analyzed the preceding research, and performed several site visits to measure the cycle time of a backhoe and a loader. Construction equipment production rates were calculated with collected cycle times and variables given in 'Standard Unit Labor'. In addition,production rates were estimated considering the circumstances of various sites with the simulation program 'crystal ball.'

Case Study on the Construction Standard Production Rate for Operation and Maintenance Technology (건설공사 유지보수품셈 사례조사 연구)

  • An, Bang-Yul;Park, Tae-Il
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.250-251
    • /
    • 2019
  • Lots of infrastructures have been newly constructed through the rapid economic growth of 1970's. Since the infrastructures has mostly deteriorated and this circumstance makes the need for maintenance and rehabilitation(M&R) of infrastructures to obtain the convenience and safety of users even more essential. Although markets for M&R project become larger, the construction standards for cost estimation of M&R work are insufficient. Thus, the purpose of this study is to examine the present state of standards for cost estimation of M&R works using case studies. Finally, this work could be utilized as the basis for the development of national standard for estimation of M&R work.

  • PDF

Case Study on the Cost Estimation standard for Smart Construction - Focused on Japan (스마트건설 공사비산정기준 사례조사 연구 - 일본사례를 중심으로 -)

  • Song, Tae-Seok;An, Bang-Yul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.171-172
    • /
    • 2020
  • Recently, the need for smart construction technologies related to the Fourth Industrial Revolution has been increasing in order to improve productivity of the construction industry. The Ministry of Land, Infrastructure and Transport has established Smart construction technology road map to commercialize the smart construction, and research and development is also underway. However, due to the lack of cost estimation standards for such smart construction technologies to be deployed to actual sites, smart construction technologies are not actively applied to construction sites. In particular, cost estimation standards are needed for construction machinery equipment with ICT technology that is currently available for commercialization. Therefore, as a preliminary study for the development of smart construction cost estimation standards, a case study was conducted on ICT construction estimation standards in Japan and present them as basic data for standards in Korea.

  • PDF

Estimation of Construction Equipment Production Rates: Focus on Efficiency Rate (건설기계 시공능력 산정에 관한 연구 : 작업효율 중심으로)

  • Park, Hee-Sung;Han, Ye Lyeong;Huh, Youngki;Ahn, Bang Ryul
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.1D
    • /
    • pp.67-72
    • /
    • 2008
  • Heavy equipment is a very important factor for successful construction implementation. Also, the cost for heavy equipment is a major part of construction cost. Therefore, the estimation of equipment cost is a critical job in the construction planning phase. A formula for production rates shown in 'Standard Unit Labor' has been used to estimate construction equipment capability per hour and cost. Although the performance of equipment has been improved, the efficiency rates in the formula are not updated lately. Therefore, this research performed several site visits to measure construction equipment working time and then calculates the efficiency rates for hydraulic backhoe, loader, and dump truck. The results show that the measured efficiencies of backhoe and loader are higher than current ones and vice versa for dump truck. This research proposes the needs for a standardized calculation formula and systematic and long-term data collection and measurement for updating efficiency rates for heavy equipment.

A Study on Improving the Occupational Safety and Health Management Cost Calculation Standards (산업안전보건관리비 계상기준 개선방안 연구)

  • An, Bang-Yul;Song, Tae-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.169-170
    • /
    • 2020
  • Occupational Safety and Health Management Cost, used to protect workers in Korean construction worksites and to create safe working environments, is a legally managed expense item. As this cost item is grounded on the Occupational Safety and Health Act, it is always implemented. However, because there is a ceiling on its rates, insufficient amounts of Safety Management Costs are often allocated to worksites, with the money not being used to areas essential to worker safety. As such, the current study raises the need to develop a set of standards to enable some items under the Occupational Safety and Health Management Costs-appropriated under the rate of indirect costs-to be appropriated as direct construction costs. As a preliminary step in this effort, the current study will provide basic data that can be used to create construction cost calculation standards for items that can be calculated as direct construction costs.

  • PDF

The Impacts of Reduced Labor Hours on the Construction Period and Cost of Tunnel Project (근로시간 단축에 따른 터널 공사의 표준 공기 및 공사비 영향 분석)

  • Park, Taeil;Kim, Kyunghoon;Shin, Eun-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.37-43
    • /
    • 2019
  • After the new standards for labor hours has been released, various problems come up in construction field, such as income reduction of employees, extension of construction period and increased construction cost. Although it is expected that the impact of the new standard on the construction industry is more worse than other industries form the view of productivity, not much works have been done to identify those impacts. Thus, this research proposes the standard construction processes, excavation cycle, and unit construction period for NATM tunnel project based on 'Construction Standard Production Rates.'The study also investigated the impact of reduced labor hours on the management of work crews, construction periods and costs of tunnel projects. The results showed that under the 52 labor hour standard, the construction periods for the excavation work and whole project was increased by 20% and 8.9%, respectively, but the construction costs for the excavation work and whole project was decreased by 1.4% and 0.6%, respectively.