• Title/Summary/Keyword: Construction Standard Production Rate

Search Result 29, Processing Time 0.031 seconds

Study on Construction-Standard-Production-Rate for Waterproof Work Based on Site Construction Status (현장시공실태에 따른 방수공사 표준품셈 개정 연구)

  • Oh, Jae-Hoon;Tae, Yong-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.304-305
    • /
    • 2018
  • Development of waterproof methods and materials resulted in the huge changes in waterproof construction materials. In consequence, the construction-standard-production-rate underwent overall revision in 2018. Especially, from the development of the specification standard and construction methods, the waterproof construction which had lower applicability in the existing construction production rate was revised. The construction methods which did not have applicability were removed. In addition, as there was a material difference based on parts, the constructionstandard-production-rate was revised by distinguishing vertical part and floor. Furthermore, by suggesting more clear work extent, the practicability in creating the standard for calculation of the estimated price in the construction field will increase.

  • PDF

Database establishment method for process scheduling by means of simulation (시뮬레이션 기법 기반 공정계획 수립을 위한 데이터베이스 구축 방법론)

  • Ko, Yong-Ho;Noh, Jae-Yun;Ngov, Kheang;Shin, Do-Hyoung;Han, Seung-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.69-70
    • /
    • 2022
  • The domestic process planning generally relies on calculations based on the construction-standard-production-rate. This method requires trial and error practice during the construction phase to deduce the optimized equipment combination for time and cost. Trial and error during construction can lead to cost overruns and schedule delays. Accordingly, this paper suggests an advanced method for establishing a productivity database based on combinations of equipment and also considering site conditions in order to reduce the timely effort for deducing the optimized equipment combination. For this purpose DES (Discrete Event Simulation) model was developed based on the information provided in the construction-standard-production-rate.

  • PDF

Discrete Event Simulation based Equipment Combination Optimization Method - based on construction equipment performance estimation of the Construction Standard Production Rate - (이산형 이벤트 시뮬레이션 기반 최적의 건설장비 조합 도출 방법 제시 - 표준품셈 건설기계 시공능력 산식을 기반으로 -)

  • Ko, Yongho;Ngov, Kheang;Noh, Jaeyun;Kim, Yujin;Han, Seungwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.21-29
    • /
    • 2022
  • Productivity estimation of construction operations is crucial to successful project delivery. Especially in the preconstruction phase, the adequacy and effectiveness of plans directly affect the actual performance of operations. Currently, productivity estimation is conducted by referring to existing references such as the Construction Standard Production Rate. However, it is difficult to promptly apply changing conditions of operations when using such references. Moreover, it is difficult to deduce the optimal combination of construction machinery for the given condition. This paper presents a simple simulation model that can be used to generate productivity data that considers site conditions and construction equipment combination. The suggested method is expected to be used as a decision making assisting tool for practitioners who rely on estimations using the Construction Standard Production Rate when establishing construction plans using heavy machinery such as backhoes, loaders and dumptrucks.

Ripple Effect Analysis of Construction Standard Unit Price in Public Construction (공공건설공사 표준시장단가 적용 파급효과 분석)

  • Jin, Zheng-Xun;Baek, Seung-Ho;Lee, Ju-Hyun
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.6_3
    • /
    • pp.1207-1219
    • /
    • 2022
  • 「Act On Contracts To Which The State Is A Party」 stipulates that the "Construction Standard Production Rate" and "Construction Standard Unit Price" be used as the criteria for determining the estimated price of construction works performed by public institutions. In this regard, issues such as the application scope of the Construction Standard Unit Price, and the effect of budget reduction continue. However, due to the lack of quantitative data on the actual application of Construction Standard Unit Price, it is difficult to objectively evaluate various issues. In order to prepare data for objective evaluation of the Construction Standard Unit Price, this study analyzed the ripple effect of applying the Construction Standard Unit Price based on the bill of quantity. As a result of the analysis, the Construction Standard Unit Price ripple effect in the civil engineering part was 9.2%, and it was analyzed that there was a ripple effect of about 1.9% based on the civil engineering direct cost. In the construction part, the ripple effect was analyzed to be relatively high at 17%, but it was found to have a ripple effect of about 3% in the construction direct cost. Based on the total direct cost, the ripple effect was calculated as 2.2%. Based on the analysis results, it is possible to evaluate the effect of applying the Standard Market Unit Price, and it is expected to be used as basic data to solve issues. As a future study, it is necessary to additionally analyze the ripple effect by Standard Market Unit Price application range (over 10 billion, over 20 billion won, etc.) and delivery system type (comprehensive evaluation, qualification examination, technical bidding, etc.). In addition, it is necessary to study the appropriate ripple effect of the Standard Market Unit Price.

Case Study on the Construction Standard Production Rate for Operation and Maintenance Technology (건설공사 유지보수품셈 사례조사 연구)

  • An, Bang-Yul;Park, Tae-Il
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.250-251
    • /
    • 2019
  • Lots of infrastructures have been newly constructed through the rapid economic growth of 1970's. Since the infrastructures has mostly deteriorated and this circumstance makes the need for maintenance and rehabilitation(M&R) of infrastructures to obtain the convenience and safety of users even more essential. Although markets for M&R project become larger, the construction standards for cost estimation of M&R work are insufficient. Thus, the purpose of this study is to examine the present state of standards for cost estimation of M&R works using case studies. Finally, this work could be utilized as the basis for the development of national standard for estimation of M&R work.

  • PDF

Analysis on the Factor of Revision of Pipe Laying Down Material and Connection Work Material (표준품셈 관부설 및 접합공사 품 개정 요인 분석)

  • Oh, Jae-Hoon;An, Bang-Yul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.302-303
    • /
    • 2018
  • This study analyzed the major revision factors and revision contents for 'Construction-Standard-Production-Rate for Construction Works in 2018. Part 16. Pipe Laying Down and Connection" which was revised by the construction expense estimation standard's middle and long-term plans. The main reasons for the revision was analyzed to be unclear construction scope, limitations in applicable pipe material based on the facility type, labor force mainly composed of ordinary workers, limitations of labor force, and incomplete appropriation standard for the tool rent fee and equipment expenses. Through revision of factors, common items were newly established, organization was revised, the labor force was mainly composed of the technicians, and basis for appropriation of equipment expenses was arranged. In addition, through periodic revision, the appropriation standard for bend and special pipes was set. Consequently, more practical construction cost estimate standard is arranged through revision.

  • PDF

Comparison between Labor Inputs by Quantity per Unit Method and by Actual Data Method in the Apartment Housing Construction Work - Focusing on Masonry Plaster Waterproofing Tile Labors - (공동주택 건설공사의 표준품셈과 실투입 노무량 비교 분석 - 미장, 방수, 조적, 타일공사를 중심으로 -)

  • Jeon, SangHoon;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.110-118
    • /
    • 2015
  • The standard production unit system is the most basic element in our country construction. However, this standard production unit system shows a large difference in the actual amount of labor input for works at the Apartment housing construction, Therefore, it may be a reasonable alternative to estimate the cost of construction by historical cost data, works will be calculated the cost of labor must determine the exact amount and It is necessary to determine the exact amount of labor input for the construction progress management. This study examines the results of comparing the standard production unit system and the actual amount of labor counting in apartment housing construction was completed in the metropolitan area since 2000, the following results were obtained. the actual amount of labor input are looked for 1.184person/1000 of masonary, $0.084persons/m^2$ of plaster, $0.039persons/m^2$ of Waterproofing, $0.059persons/m^2$ of tile at the Apartment housing construction. in the actual amount of labor counting Compared with standard production unit system, masonry ratio of 59.8%, plaster ratio of 41.3%, waterproofing ratio of 31.5%, tile ratio of 34.3% and The labor rate in the works was the lowest in the plaster. was relatively high in the masonary. Therefore, the amount of labor country apartment housing construction is preferably calculated on historical cost data. But it seems that the amount of labor necessary complement ongoing close enough to the actual standard production unit system a major variable in construction management.

Data Collection Methodology of Activity Production Rates for Contract Time Determination

  • Huh Youngki;Kim Changwan;Song Jongchul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.114-123
    • /
    • 2004
  • Contract time determination for highway construction projects has never been easy despite considerable research efforts from academia as well as industry. High variations in crew production rates are considered one of the main barriers to accurate contract time determination. This paper presents a methodology for collecting field information on crew production rates which will help to enhance the accuracy of contract time determination for highway bridge construction. Based on a standard data collection tool developed, data on field crew production rates was collected from 14 on going projects in Texas, USA, over the past two years. The production rates based on the data collected were considered by industry practitioners to be more realistic and practical than those available to the current practices. As more data becomes available, key drivers influencing production rates could be identified and provide site personnel with a means to better plan and control production in a project specific context.

Present Condition and Development of Mechanical Utility System for Modular Construction (모듈러 건축용 기계설비 시스템 현황 및 개발에 관한 연구)

  • Lee, Jae-Soo;Choi, Jun-Sok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.19-20
    • /
    • 2016
  • Domestic construction industry has experienced many difficulties as it has been on a downward. It's a way that active modular structure market to solve this problem. However, as Modular structure technical standard in Korea is in the early stages, our modular factory maufactured rate is almost 40% lower than overseas. Besides, there is less design diversity so it just applies for a few buildings like low-rise building and general group barrackes. To deal with these problems, it is essential to modulating the equipment which can improve the production rate. This will help to ensure the quality, shortening of the construction period, the reduction of labor costs. We have defined the name of segmented by each installation location of the equipment to modulating equipment. And it was examined the suitability of the modulating of the location-specific utility system. The results of the analysis are discussed on the page.

  • PDF

A Mixed Integer Nonlinear Programming Approach towards Optimal Earthmoving Equipment Selection (혼합 정수 비선형 계획법 기반 토공사 최적 장비 선정 방법 제시)

  • Ko, Yong-Ho;Ngov, Kheang;Lee, Su-Min;Shin, Do-Hyoung;Han, Seung-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.223-224
    • /
    • 2023
  • Optimal fleet management in the planning stage is one of the most critical activities that guarantee successful construction projects. In South Korea, the construction standard production rate database (CSPRD) is normally employed. However, when it comes to a trade-off problem that involves decision-making on optimal sets of equipment to perform a certain task, the method will require the planners' in-depth knowledge and experience regarding the target process and a time consuming estimation of the performance of every possible scenario must be conducted for the deduction of the optimal fleet management. On this account, this research paper proposes a lightweight method of using mixed integer nonlinear programming (MINLP) in multi-objective problems based on CSPRD-based mathematical equations to assist planners in the preplanning stage of choosing the optimal sets of types and size machinery to efficiently arrange the construction scheduling and budgeting.

  • PDF