• Title/Summary/Keyword: Construction Process

Search Result 7,135, Processing Time 0.036 seconds

CONCEPTUAL MODEL OF RFID APPLICATION IN PREFABRICATION INSTALLATION PROCESS

  • V. Peansupap;T. Tongthong;B. Hasiholan
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.279-288
    • /
    • 2007
  • Attempts to achieve a higher productivity have led studies to focus on process improvement. Information has been found as an essential element for process improvement. This research has introduced and focused on two types of information, namely: related jobsite information along the process and feedback information. Related jobsite information along the process which needs to be processed and delivered in a timely manner, accurate, and real time is required to streamline the decision making process. Whereas feedback information about process' current practices which have to be captured and stored is a useful for continuous improvement in identifying the problem origin and determining corrective action. In the current practices, although these two types of information are essential for process improvement, construction process has faced barriers in obtaining that information. Therefore, this research will propose a new information system to overcome the aforementioned barriers. The new information system consists of RFID as an automatic identification and data collection device integrated with database to support construction processes. The new system attempts to provide related jobsite information along the process and feedback information to support decision making process and continuous process improvement respectively. A case study of prefabrication installation process in housing projects has been selected to be implemented in conceptual model of RFID application in construction industry. Conceptual model will be presented in this paper as an initial stage of this ongoing research. Expected outcomes of the new system and future works will be discussed briefly.

  • PDF

Modular Building Construction Process Development by Benchmarking International Best Practices (선진 사례 벤치마킹을 통한 국내 모듈러 건축 시공 프로세스 제안)

  • Shin, HyunKyu;Ahn, YongHan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.6
    • /
    • pp.3-12
    • /
    • 2016
  • The purpose of this study is to provide a domestic applicable modular building construction process by benchmarking international best practices. In this study, we derive the risk factors that may occur in performing a modular construction projects and the modular construction management factors through case analysis. In order to effectively respond to risks in performing a modular building projects, we propose the modular building construction process which is separated by a transportation, lifting, assembly steps based on the unit module construction sequence. It is the key to providing management information and guidelines for the design, production, construction participants by reflecting the information for each step in the process. This study would prevent a potential hazard which may occur in the construction process. Consequently, It could result in saving the entire cost of modular construction project as shortening the project schedule and could improve workability of modular construction.

LEAN CONSTRUCTION MANAGEMENT OF BPIMT(BUILDIN-CONSTRUCTION PROCESS INNOVATION MANAGEMENT TOOLS & TECHNIQUES) THAT BASED VSM &TACT

  • Sang-Hyuk Lee;Chul-Woo Lim;Chang-duk Kim;Sang-Wook Suh;Yoon-Ki Choi;Jae-Youl Chun;Jung-Ho Yu
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1089-1093
    • /
    • 2005
  • Proving the effect of lean construction has yet to be done for its staying poor basic building though there has been efforts and wants to introduce the theory and concept of lean construction in practical site. Therefore, we need to specify the methods of productivity improvement and construction process through various adaptations in the site. Also, to apply such improvement methods systematically, we need active participation of owners, contractors and supply chain members in relation to construction industry and are also require appropriate methods to adapt. At first, this study thinks over the techniques of lean construction that has been verified through studies carried before. For second, it selects the technique of lean construction with the practicality in the construction site. For third, it is aimed to make a manual of lean process management by the use of TACT and V.S.M. For fifth, it will show the method of management for repeated activity and develop a guide-line and procedure that applies the concept of work sequence and resource equalization to each phase of process management. At last, it will show methods of reflecting V.S.M. to improve and grasp the waste factor from the step of managing an activity process and develop the form to analyze the waste in construction site by mapping the value flow.

  • PDF

Improvement Plan of Daily Work Accomplishment Index based Process Management based on Lean Construction Principles

  • Yoo, Dong Uk;Hong, Eun Hwa;Choi, Byung Sun;Chae, Myung Jin;Chun, Jae Youl
    • Architectural research
    • /
    • v.20 no.4
    • /
    • pp.147-152
    • /
    • 2018
  • As construction projects become larger, process plans become more complex, and inadequate process management leads to waste of time and resources. Effective process management requires process management techniques that can identify problems inherent in the process, continuously improve, and reflect interdependent process characteristics. In the field, the day's details by work type and work status are to be entered in the work daily report. However, even when important information is written, it is not directly linked to the overall process management. This study aims to propose specific process management and decision-making plan based on actual worker by visualizing and quantifying the information described in the existing work daily report. It is expected efficient process management to increase reliability and productivity through process management, which can increase the utilization of work daily reports and facilitates organic communication among participants.

A Study on the Management Effectiveness Analysis of Construction Process Management (건설 프로세스 경영의 경영효과 분석에 관한 연구)

  • Kim, Young-Seop;Hwang, Ug-Sun;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.81-89
    • /
    • 2008
  • The purpose of this study Management Effectiveness Analysis of Construction Process Management. This study is to analyze the effects that process management has in outcome has been done by setting 5 elements of process management system as independent variables, making hypothesis, surveying and analyzing. The results of this analysis showed that process management operation level can be measured effectively through the application of Business Process Management System, and Process management strategy is found out to be contributed to improving strategy operation support, process management and IT connection technology. By seeing this research result, through optimally applying 'process management' in construction industry, process management can be used to improve the construction industry's potential competitiveness by improving effectiveness in works in the fields of strategy operation, process management, IT connection etc. So, by practically verifying the effectiveness of 'process management system', the purpose of this research is to come up with the necessity and the development of 'process management system' in construction industry.

Development of Construction Process Safety Information Management System for Safety Accident Prevention (안전사고 예방을 위한 건설업 공정 안전 정보 관리 시스템 개발)

  • Jun Hyun Jong;Yang Kwang Mo;Kang Kyung Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.7 no.1
    • /
    • pp.11-23
    • /
    • 2005
  • It is difficult to put it into practice in that it requires bearing too much burden to draw out the planning itself in a case of large construction work. Consequently in this paper we select evaluation criteria by construction progress, classify into several categories, and regard potential danger which often occurs, as a evaluation criterion. Further step is to allow workers or collaborated companies to express their expert opinions or experiences and to encourage quality and process control and autonomous safety control by applying PSM(Process Safety Management) method using AHP(Analytic Hierarchy Process) and to development of PSIM(Process Safety Information Management) evaluation method in the construction. The reason why PSIM method should be quantitative and substantial progress is because it contributes Korean constructing companies to enhancing their safety control ability and to taking an equal stance just like developed countries, thereby strengthening their competitive edges.

Management Method in the Education Facilities of the Construction Process through Value Engineering(VE) Case Study (VE 사례분석을 통한 교육시설 건축공사 단계별 관리방안)

  • Kim, Hag-Joo;Mun, Gwang-Bae;Go, Seong-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.129-132
    • /
    • 2012
  • Value Engineering(VE) process is going to make a series of improvements for the effective construction project management or optimal proposal to improve quality, performance improvement, cost reduction and customer satisfaction. For making the quality model based on better than the architecture that is required in the VE, such a project promoting creative plan, functionality and constructability reflecting the materials and improved construction methods and building life cycle for reviewing the smooth progress of the construction projects may be necessary for management techniques. This study is to establish a management plan in the educational facilities construction process through education institution's recent orders completed by VE case study.

  • PDF

A Study on the Construction Process of Agricultural Facilities (농촌 시설물 건설 프로세스 분석)

  • Shin, Han-Woo;Kim, Tae-Hui;Kim, Gwang-Hee;Cho, Hyung-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.151-154
    • /
    • 2008
  • In today's agriculture, there has been an increase in the construction of agricultural facilities due to the need to maximize land usage and many customer demands for products. But many agricultural facilities are constructed by not qualified construction company so it often causes many accidents like breakdowns and repairs. this study is to understand the construction process of agricultural facilities. The results of this research are that greenhouse is lack of the law of contract and the performance and need for the construction process supervision. Vinyl House is needed to supervise the design of the structure.

  • PDF

A Study on Simulation Numerical Formula Model for Construction Process Efficiency (시공공정 효율화를 위한 시뮬레이션 수식모형 구축에 관한 연구)

  • Park, Jong-Hyuk;Jeon, Yong-Bae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.87-95
    • /
    • 2007
  • If construction process operate composing work team by judgment manager's experience, possibility that progress of construction process becomes as inefficient is much. But, If produce optimal proposal of resources allocation, construction cost and duration through simulation at work plan step, work schedule because do quantification efficient operate do on. When plan construction process in this research, resources allocation by change of work team operation change, resources cost loss, total cost, optimal proposal of construction duration tentative plan of numerical formula model that can do simulation propose. Apply and revealed to apartment house framework which horizontal work area of process and vertical work area are composed as is each different construction process to verify proposed numerical formula model. Achieved efficiency than work team's operation results which apply numerical formula model that is presented in this research and enforce simulation is applied in actuality example construction.

A Study on the Establishment of Design and Construction Process Standardization through Building BIM Application Case (건축물 BIM 적용사례를 통한 설계 및 시공프로세스 표준화 수립에 대한 연구)

  • Jeong, Hee-woong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.4
    • /
    • pp.347-358
    • /
    • 2022
  • In order to satisfy the extraction and use of information such as estimates and processes required in the design and construction stages of BIM, which is an expectation of overall construction operation for the design and construction stage of domestic buildings, it is insufficient to supply and apply mobile technologies or terminals. In this paper, standardization of BIM-based processes from the design stage to the construction stage is proposed as an efficient construction system method through mobile-based simulation and test-bed case analysis review. The current status and potential of BIM application were identified through theoretical review of BIM and case studies at home and abroad. In addition, the overall flow of the project and the direction of effective process construction were investigated through each process by 3D, 4D, and 5D execution stage and the role of each collaborator. 4D building process BIM simulation system using mobile was implemented by applying a visualization engine that simulates process information, object information connection module, and related object information. Therefore, it was possible to minimize the possibility of re-construction of the BIM design and construction process model through the visualization of 2D drawings based on the 3D model of the building and the review of errors and interferences in the drawings. In addition, in the implementation of simulation for each process of the construction process through mobile devices, it was possible to support construction progress and process management according to the optimal option selected by the user.