DOI QR코드

DOI QR Code

Modular Building Construction Process Development by Benchmarking International Best Practices

선진 사례 벤치마킹을 통한 국내 모듈러 건축 시공 프로세스 제안

  • Shin, HyunKyu (School of Architecture & Architectural Engineering, Hanyang University ERICA) ;
  • Ahn, YongHan (School of Architecture & Architectural Engineering, Hanyang University ERICA)
  • Received : 2016.04.26
  • Accepted : 2016.09.20
  • Published : 2016.11.30

Abstract

The purpose of this study is to provide a domestic applicable modular building construction process by benchmarking international best practices. In this study, we derive the risk factors that may occur in performing a modular construction projects and the modular construction management factors through case analysis. In order to effectively respond to risks in performing a modular building projects, we propose the modular building construction process which is separated by a transportation, lifting, assembly steps based on the unit module construction sequence. It is the key to providing management information and guidelines for the design, production, construction participants by reflecting the information for each step in the process. This study would prevent a potential hazard which may occur in the construction process. Consequently, It could result in saving the entire cost of modular construction project as shortening the project schedule and could improve workability of modular construction.

본 연구의 목적은 모듈러 건축 프로젝트를 수행하는데 발생할 수 있는 위험요인을 도출하고, 해외 선진사례 분석을 통해 도출한 관리요소를 벤치마킹함으로써 국내 적용 가능한 모듈러 건축 시공 프로세스를 제안하는 것이다. 본 연구를 수행하기 위해 해외 대표적인 모듈러 건축 사례인 미국 애틀랜틱 야드 B2 프로젝트를 분석하고 내용분석법을 통해 모듈러 건축 시공 단계에서 발생할 수 있는 위험요인을 도출하였다. 본 연구결과인 모듈러 건축 시공 프로세스를 기반으로 모듈러 건축 설계, 제작 단계부터 시공 단계에 발생되는 위험요인을 고려하여 관리한다면, 시공 과정에서 발생할 수 있는 잠재적인 위험요인을 사전에 방지하고, 시행착오를 줄여 모듈러 건축 시공성도 향상시킬 수 있을 것이다. 또한, 모듈러 건축 프로젝트를 효율적으로 관리함으로써 모듈러 공법의 장점인 공기 단축 및 공사비 절감을 실현하고, 결과적으로 시공품질을 확보하여 모듈러 건축 활성화에 기여할 수 있을 것이다.

Keywords

References

  1. Alistair, G., and Frank I. (2003). "Re-engineering Through Pre-assembly: Client Expectations and Drivers." Building Research & Information, 31(2), pp. 146-160. https://doi.org/10.1080/09613210302000
  2. Bae, B. Y., Kime, K. R., Cha, H. S., and Shin, D. W. (2012). "To Improve Production Process of the Modular Using the Conveyor System." Korean Journal of Construction Engineering and Management, KICEM, 13(5), pp. 103-112. https://doi.org/10.6106/KJCEM.2012.13.5.103
  3. Cho, B. H., Kim, H. J., and Ko, G. H. (2007). "The State of art in the Modular Construction in Korea." International Journal of Steel Structures, 19(1), pp. 112-119.
  4. Claire S. (2013). "Gammon Steel Tracks Modular Components for Buildings." RFID Journal, (Jan. 07, 2013).
  5. Empire State Development. (2015). "B2 Truck Protocol" (April. 26, 2016).
  6. Field Condition. (2014). "Atlantic Yards B2 Modular / February 20, 2014" (April. 22, 2016).
  7. Kim, D. M., Seo. H. C., Kim. J. H., and Kim. J. J. (2012). "A Study for Analysis about Hindrance Factor of the Modular Construction in Korea."Proceeding of Autumn Conference Architecture Institute of Korea, 32(2), pp. 625-626.
  8. Kim, T. Y., Park, M. S., Lee, H. S., Suh, S. W., Lee, J. H., and Kim, S. Y. (2013). "Optimization Methodology of Modular Unit Factory Production Process Using DSM." Journal of The Architectural Institute of Korea Structure & Construction, 29(6), pp. 113-122. https://doi.org/10.5659/JAIK_SC.2013.29.6.113
  9. Lee, C. J., and Lim, S. H. (2012). "The Study on the Developing Process of BIM Modeling for Urban-life-housing Based on Unit Modular." Journal of The Korea Institute of Ecological Architecture and Environment, 12(6), pp. 77-84.
  10. Lee. D. H., and Kim, K. T. (2013). "A Fundamental Study for Applying of Unit Modular Housing Production System in the Domestic." Korean Journal of Construction Engineering and Management, KICEM, 14(5), pp. 3-11. https://doi.org/10.6106/KJCEM.2013.14.5.003
  11. Lee, K. B., Kim, K. R., Shin, D. W., and Cha, H. S. (2011). "A Proposal for Optimizing Unit Modular System Process to Improve Efficiency in Off-site Manufacture, Transportation and On-site Installation." Korean Journal of Construction Engineering and Management, KICEM, 12(6), pp. 14-21. https://doi.org/10.6106/KJCEM.2011.12.6.14
  12. Lee. Y. H., Lee. D. H., and Kim. K. T. (2012). "Considerations in the early stage of Designing the Unit Modular Building." Korean Journal of Construction Engineering and Management, KICEM, 13(6), pp. 133-142. https://doi.org/10.6106/KJCEM.2012.13.6.133
  13. Modular Building Institute (MBI) (2015). Permanent Modular Construction 2015 Annual Report, MBI Research Report, pp. 39-40.
  14. Ovidiu Cretu, Robert B. Stewart, and Terry Berends. (2011). Risk Management for Design and Construction. 1st ed, John Wiley & Sons, Inc, United States, pp. 149-168.
  15. RIST (2004). Factory Manufacture and On-Site Installation Methods of Stud Frame Panel - Modular Units Structural Systems. RIST.
  16. SH Corporation (2015). Modern Modular Housing-New Chances in Urban Housing Through the Modular Construction, SungJin, AnYang, pp. 10-17.
  17. SKANSKA (2014). "Skanska Termination Letter Atlantic Yards B2 Project" (April. 22, 2016).
  18. Tomas U. G. Jr., and M.ohammed A. (2014). "Prefabricated Technology in a Modular House" International Journal of Advanced Science and Technology, 73, pp. 51-74. https://doi.org/10.14257/ijast.2014.73.04