1 |
Alistair, G., and Frank I. (2003). "Re-engineering Through Pre-assembly: Client Expectations and Drivers." Building Research & Information, 31(2), pp. 146-160.
DOI
|
2 |
Bae, B. Y., Kime, K. R., Cha, H. S., and Shin, D. W. (2012). "To Improve Production Process of the Modular Using the Conveyor System." Korean Journal of Construction Engineering and Management, KICEM, 13(5), pp. 103-112.
DOI
|
3 |
Cho, B. H., Kim, H. J., and Ko, G. H. (2007). "The State of art in the Modular Construction in Korea." International Journal of Steel Structures, 19(1), pp. 112-119.
|
4 |
Claire S. (2013). "Gammon Steel Tracks Modular Components for Buildings." RFID Journal, (Jan. 07, 2013).
|
5 |
Empire State Development. (2015). "B2 Truck Protocol" (April. 26, 2016).
|
6 |
Field Condition. (2014). "Atlantic Yards B2 Modular / February 20, 2014" (April. 22, 2016).
|
7 |
Kim, D. M., Seo. H. C., Kim. J. H., and Kim. J. J. (2012). "A Study for Analysis about Hindrance Factor of the Modular Construction in Korea."Proceeding of Autumn Conference Architecture Institute of Korea, 32(2), pp. 625-626.
|
8 |
Kim, T. Y., Park, M. S., Lee, H. S., Suh, S. W., Lee, J. H., and Kim, S. Y. (2013). "Optimization Methodology of Modular Unit Factory Production Process Using DSM." Journal of The Architectural Institute of Korea Structure & Construction, 29(6), pp. 113-122.
DOI
|
9 |
Lee, C. J., and Lim, S. H. (2012). "The Study on the Developing Process of BIM Modeling for Urban-life-housing Based on Unit Modular." Journal of The Korea Institute of Ecological Architecture and Environment, 12(6), pp. 77-84.
|
10 |
Lee. D. H., and Kim, K. T. (2013). "A Fundamental Study for Applying of Unit Modular Housing Production System in the Domestic." Korean Journal of Construction Engineering and Management, KICEM, 14(5), pp. 3-11.
DOI
|
11 |
Lee, K. B., Kim, K. R., Shin, D. W., and Cha, H. S. (2011). "A Proposal for Optimizing Unit Modular System Process to Improve Efficiency in Off-site Manufacture, Transportation and On-site Installation." Korean Journal of Construction Engineering and Management, KICEM, 12(6), pp. 14-21.
DOI
|
12 |
Lee. Y. H., Lee. D. H., and Kim. K. T. (2012). "Considerations in the early stage of Designing the Unit Modular Building." Korean Journal of Construction Engineering and Management, KICEM, 13(6), pp. 133-142.
DOI
|
13 |
Modular Building Institute (MBI) (2015). Permanent Modular Construction 2015 Annual Report, MBI Research Report, pp. 39-40.
|
14 |
SKANSKA (2014). "Skanska Termination Letter Atlantic Yards B2 Project" (April. 22, 2016).
|
15 |
Ovidiu Cretu, Robert B. Stewart, and Terry Berends. (2011). Risk Management for Design and Construction. 1st ed, John Wiley & Sons, Inc, United States, pp. 149-168.
|
16 |
RIST (2004). Factory Manufacture and On-Site Installation Methods of Stud Frame Panel - Modular Units Structural Systems. RIST.
|
17 |
SH Corporation (2015). Modern Modular Housing-New Chances in Urban Housing Through the Modular Construction, SungJin, AnYang, pp. 10-17.
|
18 |
Tomas U. G. Jr., and M.ohammed A. (2014). "Prefabricated Technology in a Modular House" International Journal of Advanced Science and Technology, 73, pp. 51-74.
DOI
|