• 제목/요약/키워드: Construction Period

검색결과 2,705건 처리시간 0.028초

온도추종 양생 장치에 의한 플라이애쉬 치환 콘크리트의 강도 발현 성상 (Study on the Strength Development of Fly ash Replace Concrete by a In-situ Temperature System)

  • 이건철;윤승조;이건영;최중구;김경민
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.126-127
    • /
    • 2014
  • At construction sites, due to the reason of inconvenience and difficulties of producing and using curing equipment and when it comes to measuring compression strength of the actual structure, strength of structure concrete according to general standards which are suggested in concrete standard specification are assessed. However, this method does not consider various variables of the sites such as kinds concretes and sizes of frame works so that it is not easy to measure proper curing period and strength. Thus, this study reviews description of strength development according to In-situ temperature system and analyzes and compares properties of strength development of the existing curing methods such as sealing curing so that it provides basic materials for period of removal of molds.

  • PDF

Improvement of Coastal Wave Observation Reliability by Using Composite Type Cables

  • Nagai, Toshihiko;Kado, Hiromi;Nakayama, Masakatsu;Nakashima, Hiroyasu;Inoue, Mitsuru;Simizu, Yasuo;Nakagawa, Tohru
    • 한국해안해양공학회:학술대회논문집
    • /
    • 한국해안해양공학회 2003년도 한국해안해양공학발표논문집
    • /
    • pp.10-17
    • /
    • 2003
  • Acoustic and pressure type seabed installed wave sensors have advantage in observing long period infra-gravity wave and tsunami, while buoy type wave gauges which measure acceleration of the moored buoy motion are not able to detect long period waves. That's why most of the Japanese coastal wave observation sensors are seabed installed typed ones. Nationwide Japanese coastal wave observation systems with seabed installed sensors are gradually clarifying long-period tsunami profiles and infra-gravity wave characteristics (Nagai.et.al., 1996, 1997,2000,2002a,2002b). (omitted)

  • PDF

BRIEF HISTORY OF KOREA'S OVERSEAS CONSTRUCTION: LESSONS AND FUTURE STRATEGY

  • Jong-Hoon Kim
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.862-868
    • /
    • 2005
  • The history of Korea's overseas construction began in 1965, and the cumulative contract amount is about $180 billion over the last 40 years. During the period, Korea's overseas construction industry has played an important role for economic development. However, it seems that the industry is in a sea of trouble. Overseas construction orders have declined due to various reasons such as companies losing confidence, limited financing, lack of competitiveness, and so on. This paper addresses the brief history of Korea's overseas construction industry and the problems that the industry is facing. Then it suggests a few measures for the improvement of the industry.

  • PDF

한옥의 모듈러 공법 적용에 관한 연구 (Study on the Application of Modular Technologies to Han-ok)

  • 이창재;임석호
    • 한국주거학회논문집
    • /
    • 제23권4호
    • /
    • pp.49-57
    • /
    • 2012
  • This study was conducted to apply the modular construction method to Han-ok. The modular method, which is differentiated from the existing one, means a construction method that equipments, windows and interior materials are prefabricated as a six-sided object at a plant and then they are assembled at the least process on the spot. As for the theoretical observation, the theoretical basis to apply the modular method to the modular housing and Hanok was divided into environmental and economic aspect. In order to apply the modular method to Hanok, the unit scale and size were selected and the plane of unit module Hanok was developed. And a standard with regard to the unit combination and material lifting transportation method was set and planned. In addition, through the comparison the unit modular Hanok to the existing Hanok, the difference was analyzed and the strength was identified in terms fo design method, structure, construction method, period and cost. In final, the conclusion, with regard to the economic, technical application in future, was drawn through arranging the study contents. The unit modular Hanok to carry out the high-quality dwelling through construction period reduction, standardized construction materials and improved insulation performance can meet the demands for a paradigm of new construction technology.

공동주택 리모델링공사 표준공기 설정에 관한 연구 (A Study on Estimating Normal Project Duration of Apartment Remodeling Project)

  • 윤종식;유일한
    • 한국건설관리학회논문집
    • /
    • 제18권2호
    • /
    • pp.12-20
    • /
    • 2017
  • 리모델링을 선호하는 가장 큰 이유는 조합 구성 후 8~9년이 소요되는 재건축에 비해 상대적으로 짧은 사업기간(5~6년)에 있다고 할 수 있다. 그 외에도 입주민의 이주 시 임시거주를 위한 전세기간이 통상 24개월이라는 점을 감안할 때 공기단축의 필요성은 더욱 커진다. 또한 기존 증축형 리모델링공사의 기간이 평균적으로 28~35개월로 예측되기 때문에 전세 24개월이라는 공사기간을 만회하기 위한 전략과 노력이 필요하다. 이에 본 연구는 리모델링공사의 사업기간을 개략적으로 판단할 수 있는 리모델링 표준공기 산정모델을 개발하였다. 신축공사 표준공기를 토대로 리모델링공사와의 차이점 분석을 통해 리모델링 특성에 맞는 표준공기(안)을 개발하였다. 리모델링공사에서 새롭게 정의해야 할 표준공기 기준은 철거공사에 따른 공기변화, 보강공사에 따른 공기변화, 증축공사에 따른 공기변화로 크게 3공종으로 구분된다. 작성된 표준공기(안)에 대하여 사례연구와 전문가 인터뷰를 통해 적정성에 대해 검증하였다. 본 논문에서 개발한 리모델링공사 표준공기는 설계 대안별로 개략공기를 산출할 수 있는 기준이 될 것이며 리모델링 사업주체들간 전략적 의사결정에 도움이 될 수 있을 것이다.

중수로형(重水爐形) 원자로 건물의 Open Top시공공법 (The Open Top Construction Method for the PHWR Reactor Building)

  • 이수득
    • 기술사
    • /
    • 제34권3호
    • /
    • pp.41-45
    • /
    • 2001
  • The nuclear power plant(NPP) construction is a mammoth project, which requires a huge construction budget and the long construction duration of about 7 years. Recently there is a trend to shorten the construction period, to save the construction cost and to ensure the competitiveness through adopting the open top construction method. In this method, the major equipment are moved into the building through its top, and the internal works of the reactor building are being in process without installation of a dome roof.

  • PDF

국내 골프장 연못의 방수기술 (Water-Proof Technology for Water Hazard in Golf Course in Korea)

  • 김원조;이인환;이재필;김두환
    • 아시안잔디학회지
    • /
    • 제18권2호
    • /
    • pp.77-95
    • /
    • 2004
  • This study was conducted to find out definition, specification and characteristics of water-proof method for pond at golf courses that located in the mountain in Korea. Water-proof method of pond was selected by location, kind of soil, area, depth, cost, construction period and so on. 1. Soil Bentonite Sealing Liner(SBL) is to mix soil with a good quality bentonite. Then the mixed material was dressed on the bottom of pond. $\\$Merit of SBL is to purify the water and planting is possible. It can also reduce construction period and is economical. It's easy to find out the leak points. Demerit of SBL is expensive, if good quality soil is not in constructing site. Shape of pond edge is simple. 2. Ethylen Propylene Diene Monomer Sheef(EPDM-Sheet) makes use of sheet that resists to acid and alkaline. EPDM-Sheet spreads out as a mat on the pond for water-proof. Merit of EPDM-Sheet is to perfectly prove water and make a diverse shape of pond edge. Demerit of EPDM-Sheet is not friendly to environment. It needs drain system, air ventilation and long period of construction. It is also difficult to find out leaking points in this method. 3. Water proof of ESS-13 uses ESS-13 that is resin of vegetable matter and friendly to environment. To prove water of pond, ESS-13 is delicate with water in the pond. After that, Ess-13 in the water is expanded at pore space in the soil and cover with soil. ESS-13 can be to prove a leaking pond in golf course under business. ESS-13 is cheap and it needs short construction period. It does not need to switch the old water-proof system, additionally. It needs to move fishes to other place before utilizing ESS-13.

고속철도 횡단 강거더 설치공사에서의 BIM 기반 가상건설 장비운영 시뮬레이션의 적용 (BIM-Based Virtual Construction Simulation for Steel Girder Installation Crossing the High-Speed Railway)

  • 박준원;이상호;김성훈;원정훈;윤영철
    • 한국안전학회지
    • /
    • 제33권2호
    • /
    • pp.76-85
    • /
    • 2018
  • The interest in the Building Information Modeling (BIM) technology has risen remarkably due to the effects on construction work period reduction, cost reduction, work safety improvement, and other factors. In civil engineering field, BIM applications mainly focus on data modeling and virtual construction. In this study, we present the BIM-based virtual construction and analyze the effects of BIM for the railway facilities so that the conventional approach to the equipment operation plan can be improved in order to prevent safety accidents which can result from unclear information during the operation plan. The BIM-based virtual construction technology is applied to establish the construction plan for the site with constraints, the installation of steel girder needs to be completed, avoiding interference with the existing high-speed railway operation within a given limited time. A virtual construction model consisting of topography, structures, equipments, and avatar was built and more detailed model, including safety guard rails, was then created. Specifications of the construction equipment were input as a database, and the virtual construction model was manipulated in the equipment operation planning. Through the BIM-based virtual construction, including the verification of alternative construction method, 311 million won was saved and the construction period was shortened by 87 days compared to the original plan. In addition, it was shown that the interest and participation of the construction workers can be increased by providing the 3D virtual scene for real construction work and various safety hazards occurring during equipment operation can be effectively removed in advance by the interactive worker education.

표준시장단가 공고시기 조정에 따른 영향분석 연구 (Analysis of the Influence of Changing the Announcement Date of Standard for Construction Cost Estimation)

  • 이주현;백승호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.204-205
    • /
    • 2020
  • Construction Standard Unit Price is the unit price calculated based on the market price for work items in construction projects that have already been conducted. It is used as basic data for calculating the budget price of public construction projects. In the Construction Standard Unit Price Book implemented in the second half of 2020, there are 1,810 types of unit prices. Since 2017, 100-150 construction standard unit prices have been revised semiannually (on January 1 and July 1 of each year) through Construction Site Surveys. Other work items have been set based on the rate of inflation during the corresponding period. Later in 2020, this procedure was changed, with on-site survey period extended to one year to strengthen the construction standard unit price investigation. The revisions previous announced during the second half of the year were changed only to reflect the price inflation rates. With such changes in the revisions to construction standard unit prices, one important issue that was raised: The timing of announcing the revisions during the second half of the year (reflecting the price inflation rates). The market unit wage, which is the unit price standard of labor cost that takes up a large part of the construction cost, is announced in January and September. The figures announced in September is reflected on the construction standard unit price four months later in January, but the market unit wage announced in January is reflected only six months after in July, which causes a timing issue. As such, the current study analyzed problems rising from the changed timing of the announcements of the construction standard unit price during the second half of the year, in addition to analyzing their impact on public construction projects.

  • PDF

경쟁체제 도입기의 수급안정화를 위한 설비투자 인센티브 설정 연구 (Investment Incentive for Capacity Supply in a Period of Introduction of competition)

  • 김창수;이창호;진병문
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2000년도 하계학술대회 논문집 A
    • /
    • pp.406-408
    • /
    • 2000
  • Recently, Korea's electric industry is in the midst of a period of profound changes in the structure and function, including the introduction of market competition in the generation sector. Therefore, it is difficult to promote long-term capacity planning and new generating capacity construction which have been driven by KEPCO so far, after the introduction of market competition, so new generating capacity construction and security of reserve margin is needed through self·regulation plan of private generation producers by market mechanism. According to the competition in the generation sector, a new paradigm is necessary to the long-term capacity planning driven by the Government. This paper analyzes the plan and the incentive level able to guide the new generation capacity construction considering the uncertainty risk in a period of introduction of competition. In addition, this paper analyzes the plan able to guide the new capacity construction by market function at the stage which market become established and Government's role to solve the anxiety about the capacity supply and demand.

  • PDF