• 제목/요약/키워드: Construction Design

검색결과 11,630건 처리시간 0.04초

DTC(Design to Cost)기반의 설계단계 사업비관리 프로세스 개발 (Development of Cost Management Process during Design Phase based on Design to Cost)

  • 박소현;문현석;현창택
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 추계 학술논문 발표대회
    • /
    • pp.209-212
    • /
    • 2009
  • The Development of Cost Management is embossed efficiently to use the budget for the construction industry. The government is exploring every efforts and polices to control increasing the budget for the construction industry. However, despite of the government's efforts, researches are insufficient for a cost management of development. Also, the changed cost of construction by frequent plan change is caused of decline in quality etc during an accomplishing project. Therefore, in this study, analyzed about principal official phase of design phase to solve the problem. In order to define clearly the target cost concepts in the planning phase apply to the DTC(Design To Cost) concept and technique at the development of cost management process which will be able to manage the enterprise expense. It's process is expected with the fact that will be the possibility efficiently of fixing target cost in the planning phase by the construction client and designer.

  • PDF

설계 안전성 검토에 의해 선정된 공법의 공기와 공사비 영향 분석 - 외벽 바탕 구조물 공법 사례를 중심으로 - (Effect Analysis of Duration and Costs According to Construction Method Selected by Design for Safety - Focused on Structural Frame for Exterior Wall Cladding -)

  • 김민규;김진동;이영도;김광희
    • 한국건축시공학회지
    • /
    • 제20권3호
    • /
    • pp.297-304
    • /
    • 2020
  • 건설안전사고 발생을 근본적으로 축소하기 위해 설계단계 설계안전성 검토를 도입해 시행하고 있다. 따라서 본 연구에서 안전을 고려한 설계를 위해 선정된 공법이 안전사고를 줄일 수 있으나 공기와 공사비에 미치는 영향을 검토하여 여러 측면의 효과를 확인하고자 하였다. 추락재해 요인을 내포하고 있는 건물외벽 마감재 바탕 구조물 시공공법을 안전을 고려해 선정한 후 공기와 공사비 측면에서 비교분석하였다. 그 결과 안전뿐만 아니라 공기나 공사비 측면에서도 효과가 있는 것으로 나타났다. 따라서 설계단계 설계안전성 검토에 의해 선정된 공법이 프로젝트 전체에 긍정적인 영향을 미칠 것으로 사료된다.

인테리어현장 적응을 위한 실기실 구성에 관한 연구 (A Study of Practical Room Composition for Interior Site Adaptation)

  • 박의정
    • 한국실내디자인학회논문집
    • /
    • 제40호
    • /
    • pp.3-9
    • /
    • 2003
  • Today the social concern about Interior Design gradually requires wide comprehension. Also according to demanders' requirement. Colleges cope with speed. Interior Design made by experts for the function and purpose in the conception of decoration. Therefore, Colleges are responsible to educate for more capable professional designers. But management is the first concern for Interior Design Company students are going to work at. Interior Design has not the important state yet in Korea, it is hard to manage the company with only design works on the table. As architectural design side must get some admission, design is apart from construction. but they are worked together in Interior Design. Also, as the architectural design with process detail drawings, interior design is required the detail design for construction. But it is the facts that the college is interested in and concentrated on rather education for design and space plan than intensive education for construction because of the restricted environment of practice room. I propose component and practical use of nude construction department to understand detailed design.

Application of Big Data and Machine-learning (ML) Technology to Mitigate Contractor's Design Risks for Engineering, Procurement, and Construction (EPC) Projects

  • Choi, Seong-Jun;Choi, So-Won;Park, Min-Ji;Lee, Eul-Bum
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.823-830
    • /
    • 2022
  • The risk of project execution increases due to the enlargement and complexity of Engineering, Procurement, and Construction (EPC) plant projects. In the fourth industrial revolution era, there is an increasing need to utilize a large amount of data generated during project execution. The design is a key element for the success of the EPC plant project. Although the design cost is about 5% of the total EPC project cost, it is a critical process that affects the entire subsequent process, such as construction, installation, and operation & maintenance (O&M). This study aims to develop a system using machine-learning (ML) techniques to predict risks and support decision-making based on big data generated in an EPC project's design and construction stages. As a result, three main modules were developed: (M1) the design cost estimation module, (M2) the design error check module, and (M3) the change order forecasting module. M1 estimated design cost based on project data such as contract amount, construction period, total design cost, and man-hour (M/H). M2 and M3 are applications for predicting the severity of schedule delay and cost over-run due to design errors and change orders through unstructured text data extracted from engineering documents. A validation test was performed through a case study to verify the model applied to each module. It is expected to improve the risk response capability of EPC contractors in the design and construction stage through this study.

  • PDF

건설사업 관리에 있어서 설계이전단계의 인력투입 적정성 분석 (An Analysis on the Propriety of Labor Input at Design Stage in Construction Management)

  • 안양환;김영애;김용수
    • 한국건설관리학회논문집
    • /
    • 제10권3호
    • /
    • pp.32-41
    • /
    • 2009
  • 건설사업관리 업무를 수행하는데 있어 설계이전단계인 사업기획단계, 기본설계 및 실시설계단계가 시공단계보다 중요한 비중을 차지하고 있다. 그러나 건설기술관리법상 건설사업관리 대가 기준으로 본 인력투입기준은 설계이전단계의 중요성을 고려하지 않고 있는 실정이다. 이러한 현실적 상황에 따라 본 연구에서는 건설사업관리 업무의 설계이전단계 인력투입 적정성을 분석하여 개선방안을 제시하는 것을 목적으로 건기법의 용역대가기준과 건설사업관리 용역 4곳의 현장을 비교 분석 하였다. 연구결과 사업수행에 있어 개선된 인력투입의 적정성 분석은 다음과 같이 나타났다. 1)실제 건설사업관리 용역의 단계별 대가평균기준의 인력투입현황을 사업기획단계 신설(6.6%), 기본설계단계(3.9%$\rightarrow$5.6%), 실시설계단계(7.6%$\rightarrow$13.5%), 시공단계(88.5%$\rightarrow$64.0%), 유지관리단계 신설(10.3%)로 제안하였다. 제안된 대가평균기준을 총공사비 기준으로 분류하여 개선후의 요율과 단계별로 산정하여 제시하였다. 2) 건설기술관리법 기준인 3단계기준을 사업기획단계, 유지관리단계를 포함하여 단계별 업무를 구분하여 5단계로 제시하였다. 이와 같은 결과는 건설사업관리 용역현장의 대가 표준 산정이 현실적이고 탄력적으로 운용되고 단계별 인력투입에 대한 제도개선이 현실적으로 이루어져야하는 것으로 볼 수 있다.

IMPACTS OF DESIGN-BUILD DELIVERY SYSTEM ON THE CONSTRUCTION INDUSTRY IN TAIWAN

  • Min-Ren Yan;Wei Lo;Chien-Liang Lin
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1007-1012
    • /
    • 2005
  • Although the design-build (DB) delivery system has been taking great strides in the world and relevant researches have also been quite abundant, few studies have dealt with its potential impacts on the construction industry as a whole. This research first identified the potential entry barrier factors, which may hinder the market access, based on the theory of industrial economics and characteristics of DB project. Then through a nation-wide questionnaire survey involving 103 construction contractors and engineering consultants, the influences of each factor on company's competitiveness and corporate strategies were scrutinized, and consequently, the evolution of the construction industry was examined. It is found that as opposed to the traditional design-bid-build delivery system, the DB delivery system elevates competitive advantages of large organizations in terms of the financial capability, working experience, human resource, and administrative strength, and among them, the financial strength was concluded to be the most significant force in differentiating corporate strategies and widening the gap of competitiveness between companies. It is inferred if the government extensively adopts DB delivery system, large organizations that already possess the competitive advantage tend to obtain both design and construction abilities, and dominate the DB market. Small and medium sized companies will find little room to maneuver and be forced to become specialty sub-contractors.

  • PDF

건설공사 발주자의 계획, 설계, 공사단계 안전보건관리 역할 분석 (Analysis on Construction Clients' Role for Safety and Health Management in Plan, Design, and Construction Stage)

  • 임세종;정성춘;나예지;원정훈
    • 한국안전학회지
    • /
    • 제35권3호
    • /
    • pp.24-31
    • /
    • 2020
  • The duty of construction clients in WSH (Workplace Safety and Health) system was included in the amendment of Occupational Safety and Health Act (enforced on 16 January 2020), which was estimated the shift of paradigm in the prevention of construction accidents. The purpose of this paper is to introduce the analysis results of construction clients' role in the construction project, which were performed by authors over the recent years in order to impose the duty on construction clients, and to suggest their role according the plan, design, and construction stage. Utilizing the systematic literature review process based on Meta analysis, the related papers were selected. For the selected papers, related domestic and foreign regulations, and other prominent report, the construction clients' role was analyzed by reflecting the experts' advice. Results show that the construction clients should control the designer and contractor for implementing the WHS system during the whole process of the construction project. They should supply sufficient source and time to ensure the workers' safety. In the plan stage, the key role of construction clients is to identify intensively controlled hazard and risk reduction plan and to transfer the results. In the design stage, their key role is to select the designer with the capacity in WSH and to assist the designer for the safety design. The main key role of construction clients in the costruction stage is to select the contractor with specialty in WSH including a contract reflecting the WSH requirement and to check implementation of WSH plan, WSH cost, WSH education, and accident report. In addition, it is thought that the construction clients' participations in the site WSH activity and adjustment of safety and health problem among contractors can be effect in the prevention of construction accidents.

USING GIS TO IMPROVE ROADWAY CONSTRUCTION PLANNING

  • Sanghyeok Kang;Jongwon Seo
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.643-648
    • /
    • 2005
  • The planning process for roadway construction involves a large amount of information on design, construction methods, quantities, unit costs, production rates, and site conditions. Therefore, it is very important to acquire, manage, and process the necessary information efficiently to produce a rigorous construction plan. GIS (Geographic Information System) is a very effective tool for integrating and managing various types of information including spatial and non-spatial data required for roadway construction planning. This paper proposes a GIS-based system for improving roadway construction planning with its 'Interactive Space Scheduling' and 'Operation Level Planning' functions. The proposed system can assist construction planners in a unique way by integrating design and construction information and creating modularized design elements for space scheduling in real time. It is expected that the proposed system could improve the efficiency of roadway construction planning.

  • PDF

민간기업 조경공사에서 나타나는 식재설계 변경 타당성에 대한 전문가 인식 분석 (An Analysis of the Cognition of Professionals Regarding the Validity of Planting Design Change that Occurred in the Landscape Construction of a Major Private Company)

  • 박재영;조세환
    • 한국조경학회지
    • /
    • 제42권6호
    • /
    • pp.101-110
    • /
    • 2014
  • 본 연구는 민간기업에서 시행한 아파트 단지의 조경공사 중 식재설계변경의 유형과 변경의 타당성을 분석하여 공기업과 비교 고찰함으로써 조경공사 시에 발생하는 식재설계 변경을 객관적이고 효율적으로 관리하기 위한 기초 자료 제시를 목적으로 수행하였다. 본 연구의 결과 다음과 같은 다섯 가지를 얻을 수 있었다. 첫째, 민간기업에서 시행한 아파트 단지 조경공사에서 발생한 설계 변경 중 식재공사에서 발생한 비율이 61.8%를 차지하고 있음으로써 식재 부분이 설계변경의 주된 대상이 되는 것으로 나타났다. 둘째, 이러한 설계변경원인으로는 주로 공기부족 등 현장 여건과 관련되는 것이었고, 특히 체계적 설계변경보다는 현장에서 구두 설계변경승인으로 이루어지는 것으로 나타났다. 셋째, 식재설계의 설계변경은 한 건의 설계변경 승인에 7~48회의 동시다발적으로 발생하는 특징을 보이고 있었다. 넷째, 민간기업에서 발생하는 조경식재공사 설계변경 유형은 '이용자를 고려한 설계변경', '이미지 개선을 위한 설계변경', '유지관리의 용이성을 위한 설계변경', '설계내역 불일치로 인한 설계변경', '타 공종과의 관계로 인한 설계변경', '현장조사 미비로 인한 설계변경', '시공성을 고려한 설계변경' 등 총 7가지의 조경식재공사 설계변경 유형으로 구분할 수 있었는데 이것은 공기업에서 추진하는 설계변경 유형과 크게 다르지 않은 것으로 나타났다. 넷째, 이들 7가지 중 민간기업의 경우, '이용자를 고려한 설계변경'과 '이미지 개선을 위한 설계변경'이 전체 설계변경의 빈도에서 과반수를 넘는 것으로 나타나 공기업의 '이용자를 고려한 설계변경'과 '설계내역 불일치로 인한 설계변경'으로 나타난 것과 상이한 점을 보이고 있었다. 다섯째, 식재공사 설계변경 과정의 경우 민간기업은 공기단축을 통한 공사비용 절감 차원에서 선(先)시공 후(後)승인의 관행을 보이고 있는 것으로 나타났지만, 공기업의 경우 현장에서 설계변경 사유가 발생하였을 시 현장 상황 및 변경내용을 검토하고 반영하여 설계변경 절차를 보이는 등 상이한 절차를 거치는 것으로 나타났다. 이상의 결과는 조경공사 중 식재설계 변경의 유형은 공기업, 사기업에 관계없이 7개의 범주로 설계변경의 유형은 동일하나, 설계변경의 주된 사유와 절차는 상이한 점이 있는 것으로 나타남으로써 식재설계 변경은 조경공사의 성격에 따라 합리성과 효율성 차원에서 유동성 있게 적용하는 것이 바람직한 것으로 사료되었다.

건축 구조체 공사비 산정모델 개발을 위한 데이터 분석 - 공공청사를 중심으로 - (Analyzing Data for Development of Structures Cost Estimating Model - Focused on Government Building Project -)

  • 김수민;조재호;이종식;전재열
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.212-215
    • /
    • 2008
  • 건축공사의 공사비 절감은 시공단계보다 사업초기단계 및 설계단계에서 정확한 공사비 예측을 함으로써 더욱 효율적으로 절감될 수 있다. 하지만 현행 공공 건설공사의 공사비 산정 및 관리는 실시설계 이후로 집중되어 있어, 계산견적을 중심으로 실시되는 기획 및 기본설계단계에서의 사업비관리는 매우 취약하다고 볼 수 있다. 이에 본 연구에서는 현행 공사비 산정 방법의 문제점 및 실적공사비 사례정보 분석하여 기본설계단계에서 구체적 비용 계획을 세우고 이에 부합되는 설계가 진행되는지 검토 가능한 공사비 산정모델 개발을 위한 예비적 연구를 수행하였다.

  • PDF