• Title/Summary/Keyword: Construction Contractor

Search Result 397, Processing Time 0.024 seconds

Determination of concrete quality with destructive and non-destructive methods

  • Kibar, Hakan;Ozturk, Turgut
    • Computers and Concrete
    • /
    • v.15 no.3
    • /
    • pp.473-484
    • /
    • 2015
  • In this study, the availability of Schmidt hammer has been investigated as a reliable method to determine the quality of concrete in irrigation networks. For this purpose, the 28-day compressive strength of concrete material used in the construction irrigation channel of Bafra lowland, which is one of the most fertile plains in Turkey was examined by means of concrete compression and as well as concrete Schmidt hammer in laboratory conditions. This study was carried out on cylindrical samples to represent the everyday concrete party ($150m^3$) produced by contractor firm as 3 replications. The statistical analysis of experimental data showed that the correlations between the values of 28-day compressive strength of Schmidt hammer and the rebound number was found to be 0.98. Differences of the compressive strength between compression testing and Schmidt hammer were statistically significant at P<0.01. In this context, it was found that the reliability of compressive strength of the concrete compression test are excellent, also the reliability of compressive strength of Schmidt hammer are fair in assessing the quality of concrete irrigation channels.

A Study on the Design Change of High-Risk Temporary Structures (재해 위험도가 높은 가설구조물의 설계변경에 관한 연구)

  • Oh, T.K.;Kim, Y.G.;Lee, M.G.;Paik, S.W.;Woo, I.S.;Song, C.G.
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.1
    • /
    • pp.37-40
    • /
    • 2014
  • Article 29(3) of Occupational Safety And Health Act, which states a contractor can request a design change to an employer of businesses under the risk condition of construction of temporary structure, was established. Accordingly, in this study, recent fatal accidents caused by temporary structures were analyzed, and the level of inclusion of temporary structures in the design document were examined, and high risk temporary structures were classified. In addition, the requirements of design change of temporary structures were presented, and the qualifications of expert to certify the design change were proposed.

Modern High-Power TBM with Advanced Procurement System (오늘날의 고성능 TBM과 선진 장비조달 방안)

  • Jee, Warren W.
    • Tunnel and Underground Space
    • /
    • v.23 no.3
    • /
    • pp.161-168
    • /
    • 2013
  • Recently, the application of High-Power mechanized tunnelling technology has been expended around the world. Especially, High-power Modern TBM machines are used in a successful results. Essential for the great success of this modern TBM in difficult rock conditions are based on the development of machine power, suitable better cutter developments, and also developed assesment technology regards on the extensive site investigations. OPP (Owner Procurement Process) system is a proven alternative contract delivery method that is potentially applicable to many tunnel projects. Using the OPP, the owner specifies and procures the TBMs and tunnel lining in advance of the tunnel contract procurement and provides TBM to a tunnel contractor with a goals of reducing project risks and accelerating project schedule. Depending on the blasting vibrations and noises, mechanized tunnelling will be more important particularly in city areas.

Formalization of Productivity Metrics for Equipment in Multi-sectioned Road Construction Projects (다(多)공구 도로 공사 현장 장비들의 운영 실태 파악을 위한 생산성 지표 정립에 관한 연구)

  • Kim, Hong-Yeul;Koo, Bon-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.100-109
    • /
    • 2012
  • Large road construction projects are typically partitioned into sections that are then contracted individually to contractors. Each section requires using similar heavy equipment including excavators, dump trucks and pavers, which constitute the highest cost. Normally the equipment is not shared between them, as each contractor wishes to have their equipment readily available. However, such practices result in very low utilization of these equipment. The goal of this research is to develop a programmatic resource sharing system in which contractors can share equipment depending on the changing needs of a multi-sectioned road project. This paper introduces the results of a survey performed to investigate how contractors currently manage the supply and demand of equipment and the equipment that are practical for sharing across a project. More importantly, the paper describes a set of metrics (DPR, nDPR, SDI) needed to quantify the amount of supply/demand variance occurring in each section. The metrics were used on an actual road construction project, and the results show that each section suffers from an imbalance between its monthly planned and actual utilization of equipment. The results also indicate that the sharing of the equipment can lead to potentially large savings as equipment requirements can be met within a project as to short leasing from outside vendors.

Business Process Model for Progress Phase of Design-Build Project (설계시공일괄방식 사업의 진행단계별 업무프로세스 모델)

  • Song, Young-Woong;Son, Bo-Sik;Chun, Jae-Youl;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.38-49
    • /
    • 2009
  • In public project market, design-build projects have been increased because of market trend change which enables technical competition. In this condition, its importance is also getting important. Generally, life cycle of design-build project consists of planning, preliminary design, procurement, contract, detail design, start of construction, construction, end of construction, and evaluation. From contractor's viewpoint, it has problems such as difficulties in project management and information sharing because of frequent change of charged division. To solve these problems, it is desirable to change from function-based management system to process-based management system. The purpose of this study is to develop management process model for design-build project by progress phases. This study analyzed main conflicts and decision making factors of each stage in design-build projects, then systemized management subjects' responsibilities and management points' change. And also this study defined the key information that is the key point by project characteristics and progress phases. Based on this analysis, this study did business process modeling from planning stage to construction design check stage. At last, we proposed the way to manage business process by design-build project progress.

A Model for Evaluating Eco-friendly Demolition Works for Remodeling in the Pre-construction Stage (친환경 리모델링 철거공사 수행을 위한 사전검토 모델 개발)

  • Chae, Seong-Hyun;Kim, Kyung-Rai;Shin, Dong-Woo;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.14-23
    • /
    • 2012
  • Due to the increase of aged housing demolition in preparation for the rapid growth of the market, Eco-friendly remodeling demolition work which can minimize environmental destruction have been studied. However, the owner or contractor to apply for eco-friendly remodeling demolition work does not reflect the characteristics of the site can not have a potential for many variables. In addition, There is no standard which can find effective part and catch a problem by performing eco-friendly remodeling demolition. Therefore, the project owner and construction company executives in the Pre-construction stage to the implementation of eco-friendly remodeling demolition construction by providing a model for the pre-evaluating the project. In this paper, the performance of eco-friendly remodeling of demolitions is proposed for the pre-evaluating model. After the eight items were drawn affecting the performances which are influence to accomplishment of the eco-friendly remodeling demolition, evaluation criteria was suggested for each item. Also By classifying and assessing the evaluation items, It will be able to identify the problems and supplements for eco-friendly remodeling demolition. Through the final evaluation sheet, The works of the appropriacy and supplement will be checked for the eco-friendly remodeling demolition. Finally The preinvestigation model is helpful for making the plan of systematic demolition, futhermore It is contribute to the expansion of the eco-friendly remodeling demolition.

Identification of On-site Environmental Management Factors and Analysis of Responsible Parties in Public Housing Construction Sites (공공 주택건설사업의 현장환경관리 업무요소 도출 및 수행주체 분석)

  • Sohn, Jeong-Rak;Song, Sang-Hoon;Jun, Myoung-Hoon;Park, Seong-Sik
    • Land and Housing Review
    • /
    • v.4 no.4
    • /
    • pp.383-393
    • /
    • 2013
  • The trends of green growth and eco-friendliness came to be the core development indicator for the sustainable global environment. Korean government reflected these trends in the main flows of the national development index, and suggested diverse directions for green construction technologies and high quality construction environment through Third master plan for construction environment. However, the efforts to follow these trends during the construction process as a step for production phrase are not being considered enough yet. In this study, we identified the basic environmental management factors in order to enhance the eco-friendliness of public housing construction sites, and suggested the reasonable conducting parties and process for those respective factors. The results of this study are expected to be the valuable reference in defining the required activities and participants' responsibilities, and improving the work process for systematic on-site environmental management. In applying those results, the discussion should be followed on the executing party of each unit activity and the responsibility assignment for each process. At the same time, the legislation and standard related to environment need to be essentially amended. In the future, the method of evaluating the environmental management activities, and the technical solution to environmental problems are to be reviewed as a further research for successful environmental management.

Probabilistic Earlier GMP Calculation Method for Apartment Using CM at Risk (CM at Risk를 적용한 공동주택의 확률론적 초기 GMP 산정방안)

  • Hyun, Chang-Taek;Go, Gun-Ho;Jin, Zhengxun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.3
    • /
    • pp.295-303
    • /
    • 2018
  • In the DBB delivery system, the design stage and the construction stage are separated. Because of this, design changes frequently occur, and problems such as construction cost overrun, schedule delay, and quality deterioration happen as well. Recently, in the construction industry CM at Risk(CM@R) delivery system, which can systematically solve the above-mentioned problems of DBB delivery system, meet various demands of clients, and overcome the limited cost and period. In the CM@R delivery system, the contractor negotiates for a maximum guaranteed price(GMP) with the client at the design stage, and the CM performer carries out the construction within the GMP. However, uncertainties are inherent in the GMP calculation because the calculation is based on unfinished drawings and documents. In this study, a Probabilistic Earlier GMP Calculation Method by combining a probabilistic tool of Monte Carlo simulation with a case based reasoning is proposed so that the uncertainty in GMP calculation is reflected. After the earlier GMP is calculated, a process to calculate the $2^{nd}$ GMP at the time of around 80 % of detailed deign and to negotiate with the client to fix the final GMP is proposed. The Probabilistic Earlier GMP Calculation Method is verified through the case study. In this study, researchers set the range of GMP through the proposed probabilistic GMP calculation and tried to reduce the risk through negotiation between the client and the CM performer. The proposed method and process would contribute to the successful introduction of CM@R in Korea.

Investigation of Disputes for Nominated Sub-contractor(NSC) -Focused on the Judicial Precedent of NSC issues in Singapore, Malaysia and Hong Kong- (아시아 건설 시장에서의 지정하도급자(NSC)문제에 관한 연구 - 싱가포르, 말레이시아 그리고 홍콩의 판례를 중심으로 -)

  • Cho, Jaeyong;Kim, Junggon;Park, Hyeonggeun;Kim, Youngsuk;Lee, Boknam
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.6
    • /
    • pp.112-123
    • /
    • 2015
  • Many disputes are happened with various causes in overseas construction projects. One of major disputes is closely related with nominated subcontractors (NSC). This paper investigates 30 judical precedents for Singapore, Malaysia and Hongkong to analyze the detailed disputes related with the NSC, and then the judical precedents are classified into 6 categories: Delay and Defect Trouble (T1), Contract Relation (T2), Payment Trouble (T3), Set-off (T4), Liquidation (T5) and so forth (T6). According to the analytical results, the frequency of occurrence of disputes is considerably related with social and economical changes, and the dispute between NSC and employer for residential and commercial building projects is the most frequently happened case. As the results of analysis, therefore, it is concluded that the employer needs to response aggressively to the problems related with NSC, and it is also important to make the council for communication among related bodies. Furthermore, the institutional reform that make the role and the responsibility of employer consistent under considering contract terms and conditions is considered as the most important and fundamental issue.

Deriving Key Risk Sub-Clauses of FIDIC Conditions of Standard Subcontract -Based on FIDIC Conditions of Subcontract for Construction, edition 2011- (FIDIC 표준하도급 계약조건 핵심 리스크 세부조항 도출)

  • Hong, Seong Yeoll;Jei, Jae Yong;Seo, Sung Chul;Park, Hyung Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.3
    • /
    • pp.439-448
    • /
    • 2022
  • Recently, domestic small and medium-sized subcontractors participating in the overseas construction market are suffering from the continuous loss and damage due to the insufficient recognition of the importance of risk Sub-Clauses among conditions of subcontracts. Therefore, the need to derive risk Sub-Clauses for conditions of the subcontract has been raised, but until now, previous studies have been conducted focusing on deriving risk Sub-Clauses for standard conditions of contract for construction between the Employer and the Contractor. In this study, 52 risk Sub-Clauses were derived on the basis of the influence size of the Sub-Clauses through the Delphi technique targeting 94 Sub-Clauses of conditions of standard subcontract for construction edition 2011, issued by the International Federation of Consulting Engineers (FIDIC) and In addition, 33 key risk Sub-Clauses were finally derived through the PI Risk Matrix by Probability and Impact. The results of this study provide will useful information on key risk Sub-Clauses that need to be reviewed in advance to minimize contractual risks at the stage of bidding and signing contracts for overseas subcontract construction projects.