Design Requirements Review and Time-dependant CP Performance Analysis for Corrosion Protection Design Optimization of Offshore Structure (해상구조물의 방식설계 최적화를 위한 설계요건 분석 및 시간의존적 방식성능 해석)

  • Park, Jae-Cheul;Choi, Yoo-Youl;Pyeon, Kang-Il;Chun, Kang-Woo;Jang, Hwa-Sup;Roh, Gill-Tae
    • Journal of the Korean institute of surface engineering
    • /
    • v.49 no.5
    • /
    • pp.408-415
    • /
    • 2016
  • The offshore structures exposed to harsh corrosive such as the marine environment is essential for the quality management technique throughout the life cycle of initial design, construction and operation. Also, it should satisfy the design life and ensure the safety of the substructure with optimization of design process. This study focused on optimization of design condition for corrosion protection of wind turbine structure and computational analyzing was performed to evaluate the performance of corrosion protection with utilizing practical experimental data. We expect this analytical study contribute to improve the corrosion maintenance stability and economical efficiency of designing wind turbine structures. As a result, the design of cathodic protection system using sacrificial anodes required accurate identification of current density in order to meet the long term design life, which can be seen that a change of structure surface's coating breakdown factor is one of the key influencing factors.

Prediction Model for Gas-Energy Consumption using Ontology-based Breakdown Structure of Multi-Family Housing Complex (온톨로지 기반 공동주택 분류체계를 활용한 가스에너지 사용량 예측 모델)

  • Hong, Tae-Hoon;Park, Sung-Ki;Koo, Choong-Wan;Kim, Hyun-Joong;Kim, Chun-Hag
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.110-119
    • /
    • 2011
  • Global warming caused by excessive greenhouse gas emission is causing climate change all over the world. In Korea, greenhouse gas emission from residential buildings accounts for about 10% of gross domestic emission. Also, the number of deteriorated multi-family housing complexes is increasing. Therefore, the goal of this research is to establish the bases to manage energy consumption continuously and methodically during MR&R period of multi-family housings. The research process and methodologies are as follows. First, research team collected the data on project characteristics and energy consumption of multi-family housing complexes in Seoul. Second, an ontology-based breakdown structure was established with some primary characteristics affecting the energy consumption, which were selected by statistical analysis. Finally, a predictive model of energy consumption was developed based on the ontology-based breakdown structure, with application of CBR, ANN, MRA and GA. In this research, PASW (Predictive Analytics SoftWare) Statistics 18, Microsoft EXCEL, Protege 4.1 were utilized for data analysis and prediction. In future research, the model will be more continuous and methodical by developing the web-base system. And it has facility manager of government or local government, or multi-family housing complex make a decision with definite references regarding moderate energy consumption.

A Case Study on Improvement for Optimal Organization of Work Items in Construction Bill of Quantities (건축공사 내역서 세부항목 구성에 대한 사례연구)

  • Noh, Hae-Ra;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.10a
    • /
    • pp.67-68
    • /
    • 2016
  • In construction management, BoQ(Bill of Quantities) has been commonly used for the cost estimation. However, many problems have been recognized about the work items used in the BoQ that could be varied by the experience and knowledge of the estimators or the project. Also, there are lots of work items that have to be written in BoQ even though the cost proportion of those items is relatively lower than the others. In this study we consider the way how to organize optimally the work items through the analysis of case. The results of this study could be useful for improving the efficiency of preparing construction BoQ and conducting Quantity take-off in our construction management practices.

  • PDF

A Proposal of Quality Model for Alternative Evaluation of Major Construction Projects (건설공사에서 주요공종 대안평가를 위한 품질모델 제안)

  • Lee, Jong-Min;Seo, Bo-Ram;Son, Hyun-Jeong;Lee, Tae-Shim;Yang, Jin-Kook;Lee, Sang-Beom
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.43-44
    • /
    • 2019
  • Major construction projects will be directly related to construction costs and disclosure period depending on the selection of the construction method. However, there are some sites that choose without taking into account sufficient conditions. Therefore, the company wants to present a quality model that suits the characteristics of major engineering fields.

  • PDF

Productivity Analysis for Asphalt Paving by Means of Simulation Technique for Site Conditions (조건별 세부공종 시뮬레이션을 통한 아스팔트 포장공사의 생산성 분석)

  • Kim, Yujin;Lee, Sumin;Noh, Jaeyun;Han, Seungwoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.34-35
    • /
    • 2021
  • Currently, the Korean Smart Construction Corporation aims to stimulate overseas expansion of smart construction technology centered on Expressway development. In addition, the integrated classification system of construction information with Work Breakdown Structure(WBS) is currently being established in Korea, but its application to the construction industry is limited. In this study, data generation using simulation is carried out at the lowest level of WBS presented by the Korea Expressway Corporation, and detailed process productivity is predicted by site conditions.

  • PDF

WBS Development for Acquisition and Analysis of public Housing Productivity Data (공동주택 생산성 데이터 수집/분석을 위한 WBS 개발)

  • Kim, Jae-Woo;Kim, Yea-Sang;Kim, Young-Suk;Kim, Sang-Bum
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.5
    • /
    • pp.86-94
    • /
    • 2008
  • Productivity is one of key management indexes for evaluating soundness of a manufacturing organization and its efficiency. In many aspects of productivity management in the construction industry, however, intuition of an experienced field manager still plays a greater role while productivity data is not utilized efficiently for the construction management purposes, because the collection and analysis of the productivity-related information are not systematic. Lack of systematic method in collecting and analyzing the productivity data results in such problems. The existing WBS should therefore be improved to solve them. The authors developed a new WBS for productivity data collection and analysis by following the research direction that was determined by literature reviews, overseas cases, and interviews with field engineers. The new breakdown structure was then evaluated for its feasibility as a productivity analysis framework. It is expected that the productivity data collected by the WBS will be used for OLAP and mining for future productivity forecast.

A Study on the Cost Hierarchical System of Nuclaer Power Plant Construction Project for Introcusting Earned Vaule Management System (성과관리시스템(EVMS) 도입을 위한 원전 건설사업비 관리체계 세분화 방안에 관한 연구)

  • Lee, Sang-Hyun;Kim, Woo-Joong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.230-231
    • /
    • 2019
  • The nuclear power plant construction project is large-scale, has various stakeholders and computer system, and is produced and managed a large amount of information. The domestic nuclear power plant construction project has accumulated data based on many years of experience in the system. It has the competitiveness to suggeest alternatives that meet the requirement of the client in the overseas nuclear power plant project. Earned value management, which integrates schedule and cost, is possible to risk management. It was developed the earned value management system considering the the actual data properties and types of the preceding nuclear power plant construction projects. It will be able to increase the nuclaer power plant export competieiveness. Therefore, it was palned to carry out future stuies so that it be able to complement the measure to integrate cost and schedule in consideration of actual data(quantity of activity, etc.).

  • PDF

Concept and Structure of Parametric Object Breakdown Structure (OBS) for Practical BIM (BIM 객체분류체계 (OBS) 개념 및 구조)

  • Jung, Youngsoo;Kim, Yesol;Kim, Min;Ju, Taehwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.88-96
    • /
    • 2013
  • Recent proliferation of building information modeling (BIM) has actively stimulated integrated utilization of geometric (graphic) and non-geometric (non-graphic) data. Nevertheless, physically and logically, linking and maintaining these two different types of data in an integrated manner requires enormous overhead efforts for practical implementation. In order to address this problem, this paper proposes a concept and structure of the object breakdown structure (OBS) that facilitates advanced BIM implementations in an automated and effective manner. Proposed OBS numbering system has secure rules for organizing graphic objects in full considerations of effectively integrating with non-geometric data (e.g. cost and schedule). It also removes repetitive linking process caused by design changes or modifications. The result of applying this concept to a housing project revealed that only 120 definitions controled over 6,000 graphic objects for full integration with cost and schedule functions.

A Plan of Project Information Management through Analysis of Drafting Process for Transportation Planning (양중계획입안 프로세스의 구조화를 통한 프로젝트 정보관리 방안)

  • Kim, Jin-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.3
    • /
    • pp.101-109
    • /
    • 2008
  • As the number of high-rise building construction projects grows up, the subject of the transportation planning has become one of the grave issue. however important decision making are made by the experience of the a planner without the rational plans for information sharing. therefore, the purpose of this study is to suggest a plan of prefect information management not only for describing drafting process for transportation planning but also for systematizing information used in the procurement, transportation and construction phase to achieve these objectives, this study 1)analyzes the prior theory about transportation planning, 2)performs a case study of actual project to embody the problems of site management by analyzing the results of interviewing experts. In conclusion, the following factors are systematized : 1)the structure of drafting process for transportation planning, 2)the contents of information used in the procurement, transportation and construction phase, 3)the actual condition of code breakdown structure in transportation Planning phase. It is anticipated that the proposed methodology would be able to improve information management among the related engineers and accumulated data that might be used in similar construction projects in Korea.

건설 프로젝트 공정표 생성을 위한 사례기반 전문가시스템의 설계

  • 김현우;이경전;이재규
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.04a
    • /
    • pp.709-712
    • /
    • 1996
  • Generating a project network of a specific construction project is very time consuming and difficult task in the field. To effectiviely automate and support the planning process, we design a case-based project planning expert system inspired by the fact a human expert project planner uses previous cases for planning a new project. A construction project case consist of its specific characteristics and the corresponding project network (i.e. project plan). Using frame based representation. we represent the project features affecting the progress network and the entities composing the project plan such as the buildings, construction methods, WBS (work breakdown structure), activities, and resources. The project planning process runs through most similar case retrieval, case adaptation, and user requirement satisfaction. We represent the construction domain knowledge for each procedure using constraints and rules. We develop the methodology for constraint-based case adaption. Case adaptation process mainly consist of activity generation/deletion and predecence constraint satisfaction, for which we develop the dynamic constraint generation method and connect user-level requirement representation the system-level network modification knowledge. The methodology is being applied to the prototype for apartment construction project planning.