Concept and Structure of Parametric Object Breakdown Structure (OBS) for Practical BIM

BIM 객체분류체계 (OBS) 개념 및 구조

  • 정영수 (명지대학교 건축대학) ;
  • 김예솔 (명지대학교 대학원 건축학과) ;
  • 김민 (명지대학교 대학원 건축학과) ;
  • 주태환 (명지대학교 대학원 건축학과)
  • Received : 2013.01.08
  • Accepted : 2013.01.30
  • Published : 2013.05.31

Abstract

Recent proliferation of building information modeling (BIM) has actively stimulated integrated utilization of geometric (graphic) and non-geometric (non-graphic) data. Nevertheless, physically and logically, linking and maintaining these two different types of data in an integrated manner requires enormous overhead efforts for practical implementation. In order to address this problem, this paper proposes a concept and structure of the object breakdown structure (OBS) that facilitates advanced BIM implementations in an automated and effective manner. Proposed OBS numbering system has secure rules for organizing graphic objects in full considerations of effectively integrating with non-geometric data (e.g. cost and schedule). It also removes repetitive linking process caused by design changes or modifications. The result of applying this concept to a housing project revealed that only 120 definitions controled over 6,000 graphic objects for full integration with cost and schedule functions.

건설정보화의 다양한 노력 중, 최근 Building Information Modelling (BIM) 활용이 급속히 확대되고 있으며 그 활용 형태 또한 점차 '고도화' 및 '효율화'되고 있다. 그럼에도 불구하고, BIM 실무활용을 위해서 요구되는 다대한 추가 업무 부담은 BIM 실무적용의 가장 중요한 장애요인으로 지적되어 왔다. 이러한 맥락에서, 본 연구는 BIM 활용의 기능적인 '고도화'를 더욱 발전시키면서 동시에 이에 요구되는 업무 부담을 최소화시키는'효율화'를 연구목표로 설정하고, 이를 위한 핵심 요소기술로서, "BIM 객체 분류체계 (OBS)"를 정의하고 개발하였다. 본 연구에서 제안된 OBS는 BIM 도형정보의 각 객체별 식별번호를 목적에 부합한 규칙에 의해 부여함으로써, 비도형 정보(예로서 공정 및 원가)와의 연계를 용이케 하는 것을 목적으로 한다. 제안된 OBS 활용을 통하여 객체간의 물리적 위계 구성, 공정 액티비티 연계, 원가 정보 연계 등 다수 기능이 시스템화 되며, 따라서 다차원 CAD 구현을 위해 요구되는 지나치게 많은 데이터간의 연계 작업이 자동화됨으로써 BIM 실무구현의 현실성을 획기적으로 높일 수 있다. 제안된 OBS의 개념은 신한옥 주택 건설 사례를 통하여 적용 및 검증하였다.

Keywords

References

  1. 강인석.박호병.김민지.문현석 (2010). "주제 분류코드에 의한 국내외 건설사업관리 (CM) 기술 분야별 연구 현황분석". 한국건설관리학회 논문집, 제11권 제 1호, 한국건설관리학회, pp. 48-59.
  2. 국토부 (2009a). 건설사업관리 업무지침, 국토해양부 고시 제2009-825호, 2009년 8월 25일, 국토해양부.
  3. 국토부 (2009b). 건설정보분류체계 적용기준, 국토해양부 공고 제2009-781호, 2009년 8월 24일, 국토해양부.
  4. 김왕직 (2011). 한옥기술개발 1-1세부: 첨단도시개발사업 한옥기술개발 연구단 워크샵 발표자료
  5. 정영수.김우중.하지원 (2012). "신한옥 건설통합정보화를 위한 표준정보분류 및 사업번호체계". 한국캐드캠학회논문집, 17(4), pp. 225-233.
  6. 정영수.김희아 (2011). "건설기업 공정관리 패턴의 현황 및 변화 분석". 한국건설관리학회 논문집, 제12권 제4호, 한국건설관리학회, pp. 88-96. https://doi.org/10.6106/KJCEM.2011.12.4.88
  7. 정영수.주미희 (2011). "건설기업 원가관리 패턴의 현황 및 변화 분석". 한국건설관리학회 논문집, 제 12권 제4호, 한국건설관리학회, pp. 79-87. https://doi.org/10.6106/KJCEM.2011.12.4.79
  8. Chau, K.W. Anson, M. and Zhang, J.P. (2005). "4D Dynamic Construction Management and Visualization Software:1. Development." Automation in Construction, 14(4), pp. 512-524. https://doi.org/10.1016/j.autcon.2004.11.002
  9. CSI (2012). MasterFormat: Master List of Numbers and Titles for the Construction Industry, The Construction Specifications Institute (CSI), USA.
  10. Ding, L.Y. Zhou, Y. Luo, H.B. and Wu, X.G. (2012). "Using nD Technology to Develop an Integrated Construction Management System for City Rail Transit Construction". Automation in Construction, 21(1), pp. 64-73. https://doi.org/10.1016/j.autcon.2011.05.013
  11. Jung, Y. and Gibson, G. E. (1999). "Planning for Computer Integrated Construction." Journal of Computing in Civil Engineering, 13(4), pp. 217-225. https://doi.org/10.1061/(ASCE)0887-3801(1999)13:4(217)
  12. Jung, Y. and Joo, M. (2011). "Building Information Modeling(BIM) Framework for Practical Implementation.". Automation in Construction, 20(2), pp. 126-133. https://doi.org/10.1016/j.autcon.2010.09.010
  13. Jung, Y. and Woo, S. (2004). "Flexible Work Breakdown Structure for Integrated Cost and Schedule Control". Journal of Construction Engineering and Management, 130(5), pp. 616-625. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:5(616)
  14. RIBA (1997). Uniclass: Unified Classification for the Construction Industry, RIBA Publications, London.

Cited by

  1. Improvement of Construction Information Classification for Applying BIM vol.15, pp.10, 2014, https://doi.org/10.5762/KAIS.2014.15.10.6379
  2. Exploratory Study on BIM-based Information Breakdown Structure for Construction Document Management vol.5, pp.1, 2015, https://doi.org/10.6106/JCEPM.2015.5.1.032
  3. New Building Materials and Methods for Modernized Korean Housing (Hanok) vol.15, pp.2, 2014, https://doi.org/10.6106/KJCEM.2014.15.2.023
  4. Interoperability Analysis for BIM software Based on User-defined Properties vol.17, pp.2, 2016, https://doi.org/10.6106/KJCEM.2016.17.2.099
  5. Integrated Cost and Schedule Control Systems for Nuclear Power Plant Construction: Leveraging Strategic Advantages to Owners and EPC Firms vol.2015, 2015, https://doi.org/10.1155/2015/190925
  6. Development of BIM-based Construction Document Information Database Structure through the Link to the BIM Model and Construction Document Information vol.16, pp.5, 2015, https://doi.org/10.6106/KJCEM.2015.16.5.042
  7. A Study on 3D Indoor mapping for as-built BIM creation by using Graph-based SLAM vol.17, pp.3, 2016, https://doi.org/10.6106/KJCEM.2016.17.3.032
  8. A Study of BIM Delivery Model for Railway Construction Project using BIM Function Breakdown Structure vol.18, pp.4, 2015, https://doi.org/10.7782/JKSR.2015.18.4.344