Browse > Article
http://dx.doi.org/10.5345/JKIC.2008.8.3.101

A Plan of Project Information Management through Analysis of Drafting Process for Transportation Planning  

Kim, Jin-Ho (동명대학교 건축대학 건축공학과)
Publication Information
Journal of the Korea Institute of Building Construction / v.8, no.3, 2008 , pp. 101-109 More about this Journal
Abstract
As the number of high-rise building construction projects grows up, the subject of the transportation planning has become one of the grave issue. however important decision making are made by the experience of the a planner without the rational plans for information sharing. therefore, the purpose of this study is to suggest a plan of prefect information management not only for describing drafting process for transportation planning but also for systematizing information used in the procurement, transportation and construction phase to achieve these objectives, this study 1)analyzes the prior theory about transportation planning, 2)performs a case study of actual project to embody the problems of site management by analyzing the results of interviewing experts. In conclusion, the following factors are systematized : 1)the structure of drafting process for transportation planning, 2)the contents of information used in the procurement, transportation and construction phase, 3)the actual condition of code breakdown structure in transportation Planning phase. It is anticipated that the proposed methodology would be able to improve information management among the related engineers and accumulated data that might be used in similar construction projects in Korea.
Keywords
Transportation Planning; Drafting Process; Project Information Management;
Citations & Related Records
연도 인용수 순위
  • Reference
1 박길재 외 2명, 고층 건축공사에 있어 자재양중계획의 최적화방안(-마감자재를 중심으로-), 대한건축학회 추계학술발표 대회 논문집(구조계), 21권 2호, 2001.10
2 삼성중공업건설, 초고층 요소기술 시공 가이드북, 기문당, 2004.7
3 田村惠彦, 揚重計劃管理システムを核にした搬送合理化, 建築技術, pp.62-63, 1996.3.
4 森田真弘 外 4人, 揚重計劃.實績管理システムの開發, 日本 建築學會 第4回建築生産と管理技術シンポジウム, 1988.
5 岩下 智 外 3人, 揚重計劃支援システムに關する硏究(-クレ-ン 揚重作業の最適化について-), 日本建築學會 第3回 建築生産と管理技術シンポジウム, 1987
6 二階 盛, 超高層建築 續 施工偏, 鹿島出版會, 1985.
7 Warszawski, A. Analysis of Transportation Methods in Construction, Journal of the Construction Division, ASCE, Vol 99. No. 1, pp.191-202
8 허담 외 3명, 고층 건축공사의 양중계획 최적화 방안에 관한 연구(1), 대한건축학회 학술발표논문집 제14권 제2호, 1994.10
9 정용찬 외 2명, 고층건축공사의 리프트 양중계획 합리화 방안, 대한건축학회 학술발표논문집 제24권 제1호, 2004. 4
10 전재열 외 2명, 건축생산관리(-Building Project Management-), 기문당, 2004.3
11 이웅균 외 3명, 유전자 알고리즘 모델을 활용한 양중계획 합리화 방안(-타워크레인을 중심으로-), 대한건축학회논문집 구조계 20권 2호(통권184호), 2004.2   과학기술학회마을
12 안병주 외 1명, 고층건물공사 마감자재 양중계획의 타당성 검토, 대한건축학회논문집 구조계 17권 1호(통권147호), 2001.1   과학기술학회마을