Exploratory Study on BIM-based Information Breakdown Structure for Construction Document Management

  • Lee, Dong Gun;Cha, Hee Sung
    • Journal of Construction Engineering and Project Management
    • /
    • 제5권1호
    • /
    • pp.32-39
    • /
    • 2015
  • Construction industry is an aggregate of information that diverse information is integrated and controlled. To implement successful construction projects, it can be said that the information management is very important. In particular, because information of construction sites is controlled in a form of documents, importance of the document management in construction has been increased. But, by controlling information through documents, there are difficult problems in writing and classification of the documents and preservation and utilization of the information. Also, due to incompletion of the information management system, difficulty in systematic info management arises. For this reason, this study intends to suggest the document information breakdown structure for controlling document info efficiently which is generated at construction sites. For this, through the examination of preceding studies, establishment of the concept of the document info breakdown structure, the space breakdown structure, and the info breakdown structure, availability of document information is intended to heighten.

학교시설물 유지관리를 위한 공사 분류 체계 분석 (Analysis of Construction Work Breakdown Structure of Maintenance of Educational Facility)

  • 류한국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.251-252
    • /
    • 2015
  • Enough school facility maintenance data should be accumulated in a database or data warehouse in order to supply information about school facility correct maintenance budget plan, budget assignment, and cycle and rate of maintenance or replacement. For those, this research analyze the present school facility maintenance practice and budget and construction cost structure. In order to solve the problems, this study analyze the present practice of maintenance and replacement and obtain LCC(Life cycle cost) data, perform expert interview and then establish construction work breakdown structure of maintenance of educational facility by combining work breakdown structure(WBS) and cost breakdown structure(CBS).

  • PDF

현장 관리자 중심의 건축공사 가설기술 표준분류체계구축 (Development of Standard Breakdown Structure of Temporary Construction Technique in Building Construction focused on Site Manager)

  • 김민정;박준모;김옥규;최병주
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.117-118
    • /
    • 2012
  • This study has been reorganizing a standard breakdown structure of temporary technique focused on construction site. For this, first of all we, the authors, reviewed features and present statuss of construction temporary technique, and could develop to the standard breakdown structure through studying a construction site and researching a delphi method. By using the standard breakdown structure obtained from this study, it is expected that the application of to information of construction business and plan to a schedule and a work.

  • PDF

Life Cycle Cost Breakdown Structure Development of Buildings through Delphi Analysis

  • Jeong, Jae-Hyuk;Shin, Han-Woo;Ryu, Han-Guk;Kim, Gwang-Hee;Kim, Tae-Hui
    • 한국건축시공학회지
    • /
    • 제12권5호
    • /
    • pp.528-538
    • /
    • 2012
  • With domestic construction projects becoming bigger, more specialized and more advanced, the construction industry is striving to improve quality and quantity, and is diversifying functions and shapes. Nevertheless, the process of a construction project causes problems when we estimate construction price, because the cost breakdown structures are different in each step. The primary aim of this study was to estimate building life cycle cost using the Delphi method. The cost breakdown structure for life cycle cost was classified into planning, design, construction, maintenance and waste disposal, and each detailed classification was determined by estimating life cycle cost. Moreover, the developed cost breakdown structure is verified by consulting with experts to secure objectivity and validity.

건설공사 민원 최소화를 위한 민원분류체계 기반 설계성능향상 (Improvement of Design Performance for the Minimization of Public Grievances Based on a Construction Public Grievance Breakdown Structure)

  • 문성우;조화니
    • 한국건설관리학회논문집
    • /
    • 제19권1호
    • /
    • pp.12-20
    • /
    • 2018
  • 건설사업은 사회적 그리고 경제적으로 파급효과가 크기 때문에 프로젝트 추진과정 중 다수의 민원이 발생된다. 이와 같은 현실에서 건설사업을 성공적으로 완료하기 위해서는 계획 및 설계과정에서 민원요인을 분석하고, 민원을 최소화하기 위해서 노력해야 한다. 본 논문은 건설사업의 민원을 평가하기 위한 민원분류체계를 제시하고, 민원분류체계를 바탕으로 설계기능을 개선하여 민원을 최소화하는 것을 목적으로 한다. 논문목적 달성을 위해 연구과정에서는 1) 건설사업 유형별 특성에 따른 민원요인을 분석하고; 2) 민원요인을 기반으로 민원분류체계를 개발했으며; 3) 민원분류체계를 체크리스트로 사용하여 설계대안 창출을 위한 절차를 제시했다. 사례분석에서는 실제 건설사업 설계를 대상으로 민원사전예방을 위한 설계대안을 창출하여 민원대응수준을 향상시켰다.

원자력발전소 Work Breakdown Structure 개발 (Development of Work Breakdown Structure for Nuclear Power Plant)

  • 조영혁;양명덕
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.52-53
    • /
    • 2014
  • The Work Breakdown Structure (WBS) is a primary tool which provides a framework that defines clear scope of all deliverables throughout the project life cycle. Once the WBS is established in projects, it should allow project team members to measure and manage work performances by the WBS; further, it should provide a reference point when any work scope needs to be redefined. Based on the project information in the Progress and Performance Measurement System (PPMS) of UAE's Barakha Nuclear Power Plant (BNPP) projects, an attempt was made to develop a new WBS which provides hierarchical and systematical decomposition of the total work scope of NPP construction projects while avoiding from the preexistence concept in Korean NPP projects that the WBS is a combination of Physical Breakdown Structure (PBS) and Functional Breakdown Structure (FBS). The unique features of the new WBS are as follows: (1) defined the definition of each level of the WBS, (2) subdivided the WBS into 5 hierarchical levels, and (3) adopted globally used general coding structure. The new WBS provides a basic hierarchical structure for the project scope and can be used as a basic tool for schedule control, performance measurement, project status monitoring, and communication among project participants. In addition, by putting the Work Package (WP) under the WBS, the Earned Value Management System (EVMS) per WP can be utilized for the project.

  • PDF

인필식 모듈러 공법을 적용한 주택건설공사의 작업분류체계 구축 및 표준 프로세스 제안 (Standard Process and Work Breakdown Structure for Housing Construction Projects using Infill Modular System)

  • 손정락;이동건;방종대;김진원
    • 토지주택연구
    • /
    • 제10권3호
    • /
    • pp.77-87
    • /
    • 2019
  • In Korea, the modular construction method was applied to the construction of facilities such as military barracks and school dormitories, beginning with the pilot project of Seoul New Elementary School in 2003. In 2017, public modular houses were supplied to Busan(Yongho-dong) and Seoul(Gayang-dong), and modular housing is expected to continue to be supplied in the future. However, there is no clear construction standard for the modular housing construction yet, and there are few cases where the infill modular system is applied. Therefore, this study established the work breakdown structure and proposed a standard process focusing on the infill modular system applied to the construction of Dujeong-dong modular house in Cheonan. Level 1 of the work breakdown structure by construction stage of Infill modular was defined as modular manufacturing, assembly, and finishing process. Level 2 was defined as preparation, modular production, modular infill, modular fixing, floor plastering, building finishing, and other site finishing. Level 3 is defined as 57 detailed unit work of infill modular construction. The standard process of infill modular is proposed for the assembly stage that is commonly applicable to infill modular housing construction. The results of this study can be used for the process plan, transportation plan, lifting plan of modular housing construction.

공동주택에서의 건설정보통합을 위한 실무형 부위별 분류체계 구축에 관한 연구 (The Modeling of the Element Breakdown Structure(EBS) Applicable to Construction Fields for the Integration of the Construction Information in Apartment)

  • 송혁;류성룡;이한민;정환욱;임종성;고성석
    • 한국건설관리학회논문집
    • /
    • 제1권4호
    • /
    • pp.98-105
    • /
    • 2000
  • The drawing information takes the most essential part of construction information. The management of construction information through drawing information facilitates input, output and search process, thus helping maximize the usage of construction information by effectively sharing construction experience and drawing information. This paper shows how construction information can effectively used to increase the productivity of the construction process as a whole. Construction information was extracted and classified by the elements of building which are the basic and very end components of building, to accumulate information of each construction phase. Based on the result, the Element Breakdown Structure(EBS) was developed for the practical usage of construction information integration.

  • PDF

중대재해 사례에 기반한 건설업의 작업 및 위험분류체계 통합 프레임워크 개발 (Development of Framework for Integrated Work-Risk Breakdown Structurebased on Fatal Incident Cases in Construction Industry)

  • 정재민;정재욱
    • 한국건설관리학회논문집
    • /
    • 제21권3호
    • /
    • pp.11-19
    • /
    • 2020
  • 건설업에서의 재해는 수십 년 동안 다른 산업보다 많이 발생하였기 때문에, 건설업에서의 재해는 반드시 줄여야 한다. 이러한 문제를 해결하기 위해서 작업분류체계(WBS) 및 위험분류체계(RBS)를 제시하였다. WBS와 RBS는 계층적 구조로 작업 및 위험 단위를 쉽고, 빠르게 찾을 수 있다. 그래서 본 연구에서는 건설업에서의 재해를 예방하기 위해 통합 WBS-RBS 프레임워크를 개발하고자 한다. 연구의 순서 다음과 같은 3단계로 진행되었다. ① 데이터 수집 ② 데이터 분류 ③ 통합 WBS-RBS 프레임워크 개발 순으로 진행되었다. 연구의 결과 가장 사고가 많이 발생한 건물용도, 건설공종 및 재해요인을 제시할 수 있었다. 연구 결과를 통해 의사결정자는 건물용도, 건설공종, 및 재해요인의 위험 수준을 고려할 수 있다.

교육시설물의 합리적인 유지관리를 위한 비용분류체계 (Cost Breakdown Structure for Reasonable Maintenance of Educational Facilities)

  • 정재혁;신한우;김태희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.65-67
    • /
    • 2011
  • It is necessary to the development of the best maintenance system for applying the long-term maintenance plan using the cost breakdown structure in the educational facilities. This study developed the cost breakdown structure for the best maintenance system using the delphi method. For the convenience of maintenance, the maintenance cost breakdown structures are separated into building exterior wall, building inside wall, electric installation, heating installation and outdoor facilities. And these results atomized in each parts. And this study constructed the cost breakdown structure to maintenance's practicality and effectiveness through the expert analysis.

  • PDF