1 |
Son, C. B., and Kwon, J. S. (2007). "Risk assessment and preventive measures for the civil appeals in building construction sites." Journal of the Architectural Institute of Korea Structure & Construction, 23(11), pp. 185-192.
|
2 |
Lee, J. S. (2007). "The Impacts of Time Extension on Construction Costs-Focused on Domestic Public Construction Projects." Journal of the Architectural Institute of Korea Structure & Construction, 23(4), pp. 157-164.
|
3 |
Ministry of the Interior and Safety (2017). "Law on the administration of public grievances."
|
4 |
Ministry of Land, Infrastructure and Transport (2016). "The status of schedule delay in the public highway construction projects over the past 10 years."
|
5 |
Kim, E. S., Hwang, C. S. and Park, T. K. (2005). "A Countermeasure of prevention for public resentment by construction work noise." Proceedings of Korea Institute of Construction Engineering and Management Student Presentation Conference, pp. 283-287.
|
6 |
Kwon, J. S. and Son, C. B. (2008). "Assessment method on the preventive management levels of civil appeals in apartment construction sites." Journal of the Architectural Institute of Korea Structure & Construction, 24(10), pp. 151-158.
|
7 |
Doo, S. K. (2016). "A Study on the Reasonable public greivances Process of Construction Projects." Construction Issue Focus, 26.
|
8 |
Jeongup City (2017). "The status of public grievances in the construction projects over the past 5 years."
|
9 |
Shin, J. W. (2001). A Study about Improvement through the Case of Public Petition on Construction, Master's Thesis, Chonnam National University.
|
10 |
Son, C. B., and Lee, D. C. (2002). "An analysis on the factors decreasing productivity of building construction." Journal of the Architectural Institute of Korea Structure & Construction, 18(12), pp. 125-132.
|