Development of Work Breakdown Structure for Nuclear Power Plant

원자력발전소 Work Breakdown Structure 개발

  • 조영혁 (한국전력기술주식회사 사업관리기술그룹) ;
  • 양명덕 (한국전력기술주식회사 사업관리기술그룹)
  • Published : 2014.05.29

Abstract

The Work Breakdown Structure (WBS) is a primary tool which provides a framework that defines clear scope of all deliverables throughout the project life cycle. Once the WBS is established in projects, it should allow project team members to measure and manage work performances by the WBS; further, it should provide a reference point when any work scope needs to be redefined. Based on the project information in the Progress and Performance Measurement System (PPMS) of UAE's Barakha Nuclear Power Plant (BNPP) projects, an attempt was made to develop a new WBS which provides hierarchical and systematical decomposition of the total work scope of NPP construction projects while avoiding from the preexistence concept in Korean NPP projects that the WBS is a combination of Physical Breakdown Structure (PBS) and Functional Breakdown Structure (FBS). The unique features of the new WBS are as follows: (1) defined the definition of each level of the WBS, (2) subdivided the WBS into 5 hierarchical levels, and (3) adopted globally used general coding structure. The new WBS provides a basic hierarchical structure for the project scope and can be used as a basic tool for schedule control, performance measurement, project status monitoring, and communication among project participants. In addition, by putting the Work Package (WP) under the WBS, the Earned Value Management System (EVMS) per WP can be utilized for the project.

Keywords