1 |
Korea Occupational Safety and Health Agency (KOSHA) (2018). "Fatal accident and Prevention measure in construction." (Feb. 24, 2020).
|
2 |
Lee, J.B., Ro, M.R., and Go, S.S. (2004). "The Property of Building Construction Accident According to the Analysis of Building Accident Cases." Journal of the Korean Society of Safety, 19(3), pp. 101-107.
|
3 |
Li, Q.F., Zhang, P., and Fu, Y.C. (2013). "Risk identification for the construction phases of the large bridge based on WBS-RBS." Research Journal of Applied Sciences, Engineering and Technology, 6(9), pp. 1523-1530.
DOI
|
4 |
Lopez, M.A.C., Ritzel, D.O., Fontaneda, I., and Alcantara, O.J.G. (2008). "Construction industry accidents in Spain." Journal of safety research, 39(5), pp. 497-507.
DOI
|
5 |
Ministry of Employment and Labor (2019). A report on industrial accidents in 2018, 2019-05.
|
6 |
Moon M.W., and Yang K.Y. (1996). "A Study on the Major Contruction Accidents Analysis using Work Classification System." Proceedings of the architectural institute of korea structure & construction conference, 16(2), pp. 711-713.
|
7 |
Occupational Safety & Health Research Institute (2018). The Introduction of the OSH Corporate Disclosure System with the focus on how to estimating the direct and indirect costs of work injuries.
|
8 |
Rozenfeld, O., Sacks, R., Rosenfeld, Y., and Baum, H. (2010). "Construction job safety analysis." Safety science, 48(4), pp. 491-498.
DOI
|
9 |
Siami-Irdemoosa, E., Dindarloo, S.R., and Sharifzadeh, M. (2015). "Work breakdown structure (WBS) development for underground construction." Automation in Construction, 58, pp. 85-94.
DOI
|
10 |
Korea Institute of Civil engineering and building Technology (KICT) (2019). "Estimating Standards 2019." (Dec. 15, 2019).
|
11 |
Sutrisna, M., Ramanayaka, C.D., and Goulding, J.S. (2018). "Developing work breakdown structure matrix for managing offsite construction projects." Architectural Engineering and Design Management, 14(5), 381-397.
DOI
|
12 |
Sigmund, Z., and Radujkovic, M. (2014). "Risk breakdown structure for construction projects on existing buildings." Procedia-Social and Behavioral Sciences, 119, pp. 894-901.
DOI
|
13 |
Suarez-Cebador, M., Rubio-Romero, J.C., and López-Arquillos, A. (2014). "Severity of electrical accidents in the construction industry in Spain." Journal of safety research, 48, pp. 63-70.
DOI
|
14 |
Supriadi, L.S.R., Latief, Y., Susilo, B., and Rajasa, M. (2017). "Development of risk-based standardized WBS (Work Breakdown Structure) for cost estimation of apartment's project." International Journal of Civil Engineering and Technology, 8, pp. 822-833.
|
15 |
Vongpisal, C., and Yodpijit, N. (2017). "Construction accidents in Thailand: Statistical data analysis. King Mongkut's University of Technology North Bangkok." International Journal of Applied Science and Technology, 10(1). pp. 7-21.
|
16 |
Xu, K.,Li,H.M., and Lu, S.S. (2014). "Safety Risk Analysis of Box-Culvert Jacking Construction by Using Fuzzy Fault Tree Method Based on WBS-RBS." In Advanced Materials Research, 838, pp. 355-359.
DOI
|
17 |
Amini, R.A., and Latief, Y. (2018). "Development of Risk-Based Standardized WBS (Work Breakdown Structure) for Quality Planning of Road Construction Project." In 8th International Conference on Industrial Engineering and Operations Management, Bandung, Indonesia.
|
18 |
Yang, Y.J., Oh, S.H., and Noh, J.K. (2018). "Risk Assessment of Agricultural Construction Works using Accident Analysis and Analytic Hierarchy Process." Journal of The Korean Society of Agricultural Engineers, 60(4), pp. 15-25.
DOI
|
19 |
Zhou, Z., Goh, Y.M., and Li, Q. (2015). "Overview and analysis of safety management studies in the construction industry." Safety science, 72, pp. 337-350.
DOI
|
20 |
Alruqi, W.M., Hallowell, M.R., and Techera, U. (2018). "Safety climate dimensions and their relationship to construction safety performance: A meta-analytic review." Safety science, 109, pp. 165-173.
DOI
|
21 |
BUILDING ACT (2019). (Feb. 24, 2020).
|
22 |
Cho, Y.R., Shin, Y.S., and Shin, J.K. (2017). "Checklist Development for Prevention of Safety Accidents in Form Work in Small and Medium Sized Construction Sites." Journal of the Korea Institute of Building Construction, 17(6), pp. 587-594.
DOI
|
23 |
Kim, J.S., and Kim, B.S. (2019). "Characteristics Analysis of Seasonal Construction Site Fall Accident using Text Mining." Korean Journal of Construction Engineering and Management, 20(3), pp. 113-121.
DOI
|
24 |
ENFORCEMENT DECREE OF THE BUILDING ACT (2020). (Feb. 24, 2020).
|
25 |
Guo, B.H., Yiu, T.W., and González, V.A. (2016). "Predicting safety behavior in the construction industry: Development and test of an integrative model." Safety science, 84, pp. 1-11.
DOI
|
26 |
Kim, B., Lee, J.S., and Ahn, Y.H. (2018). "Development of Risk Breakdown Structure of Nuclear Power Plant Decommissioning Project: Focusing on Structural Damage/Work Process Risks." Journal of the Korea institute for structural maintenance and inspection, 22(3), pp. 38-45.
DOI
|
27 |
Kim, J.M., Lee, J.B., and Chang, S.R. (2017). "Risk Level Analysis of Architectural Work using AHP." Journal of the Korean Society of Safety, 32(5), pp. 96-102.
DOI
|
28 |
Kim, K.J., Choi, B.S., and Chun, J.Y. (2016). "Safety Management Factor Analysis of Expert Perceptions Based on 4M Method for Plant Construction Phase." Korean Journal of Construction Engineering and Management, KICEM, 17(1), pp. 18-27.
DOI
|
29 |
Korea Construction Standards Center (KSCS) (2020). (Feb. 24, 2020).
|